Search Results for: Records - Case Number=EB-2023-0195 - 409 Records Found
The document result list has reached its limit of 10,000 records. Please refine your search criteria to view more records.
Sorting Your Search Results
The most recent documents automatically show at the top. To sort by different categories (e.g. by Document Type) click the column header. Click it again to switch between ascending/descending order.
Case Information
Click the case number to view details for that proceeding.
Case Number | File Name | Document Type | Applicant | Issued By OEB | Received By OEB | Date Issued/Received |
---|---|---|---|---|---|---|
EB-2023-0195 | Transcript_ TC1 _rv3_April 08 2024 | Transcripts | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-26 | 2024-04-26 | |
EB-2023-0195 | Transcript_TC4_rv4_April 11 2024 | Transcripts | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-26 | 2024-04-26 | |
EB-2023-0195 | Transcript_TC4_rv3_April 11 2024 | Transcripts | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-26 | 2024-04-26 | |
EB-2023-0195 | Transcript_TC2_rv3_April 09 2024 | Transcripts | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-26 | 2024-04-26 | |
EB-2023-0195 | Transcript_TC5_rv1_ April 12 2024 | Transcripts | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-26 | 2024-04-26 | |
EB-2023-0195 | Transcript for TC_day5_rv1_20240426 | Transcripts | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-26 | 2024-04-26 | |
EB-2023-0195 | AMPCO_Motion_THESL_20240425 | Correspondence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-25 | 2024-04-25 | |
EB-2023-0195 | SEC_Motion_Ltr_THESL_20240425 | Correspondence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-25 | 2024-04-25 | |
EB-2023-0195 | LoC_George Mielniczek _20240424_Redacted | Letter of Comment | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-24 | 2024-04-24 | |
EB-2023-0195 | po4_THESL_COS 2025-2029_20240423_signed | Procedural Order | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-23 | 2024-04-23 | |
EB-2023-0195 | THESL_JT5.19_App A_CSMUR Unit Calculations - Revenue Forecast_20240422 | Undertaking Responses | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-22 | 2024-04-22 | |
EB-2023-0195 | THESL_JT5.16_AppA_BCA Calculator - CCA Sensitivity_20240422 | Undertaking Responses | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-22 | 2024-04-22 | |
EB-2023-0195 | THESL_JT5.15_App A_BCA Calculator_20240422 | Undertaking Responses | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-22 | 2024-04-22 | |
EB-2023-0195 | THESL_JT5.14_AppA_GA Analysis Workform_Updated_20240422 | Undertaking Responses | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-22 | 2024-04-22 | |
EB-2023-0195 | THESL_JT5.13_App B_9_T03_S01_Rate Rider Table_Updated_20240422 | Undertaking Responses | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-22 | 2024-04-22 | |
EB-2023-0195 | THESL_JT5.13_App A_9_T02_S01_DVA Continuity Schedule_Updated_20240422 | Undertaking Responses | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-22 | 2024-04-22 | |
EB-2023-0195 | THESL_JT5.3_App A Standard Deviation Calculations_20240422 | Undertaking Responses | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-22 | 2024-04-22 | |
EB-2023-0195 | THESL_JT4.38_App A - Monthly Averages Calc_20240422 | Undertaking Responses | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-22 | 2024-04-22 | |
EB-2023-0195 | THESL_JT4.37_App A OEB App_2JA-JC - 2018 and 2019 Actual_20240422 | Undertaking Responses | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-22 | 2024-04-22 | |
EB-2023-0195 | THESL_JT4.35_App A_Example of Weather-Normalized Calculation_20240422 | Undertaking Responses | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-22 | 2024-04-22 | |
EB-2023-0195 | THESL_JT4.27_App A_20240422 | Undertaking Responses | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-22 | 2024-04-22 | |
EB-2023-0195 | THESL_JT4.25_App A_2025 NCP and CP_Application Update_20240422 | Undertaking Responses | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-22 | 2024-04-22 | |
EB-2023-0195 | THESL_JT4.1 to 4.41_TC_UndertakingResp_Day4of5_Consolidated_20240422 | Undertaking Responses | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-22 | 2024-04-22 | |
EB-2023-0195 | THESL_JT4.15_App A_OEB Appendix 2-AA_ISAs_20240422 | Undertaking Responses | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-22 | 2024-04-22 | |
EB-2023-0195 | THESL_JT4.8_App A_20240422 | Undertaking Responses | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-22 | 2024-04-22 | |
EB-2023-0195 | THESL_JT4.6 App A -3-SEC-79 App Revision - Distribution kWh_20240422 | Undertaking Responses | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-22 | 2024-04-22 | |
EB-2023-0195 | THESL_JT3.45_App A_20240422 | Undertaking Responses | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-22 | 2024-04-22 | |
EB-2023-0195 | THESL_JT3.26_App A_20240422 | Undertaking Responses | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-22 | 2024-04-22 | |
EB-2023-0195 | THESL_JT3.4_App A_Program Unit Costs_20240422 | Undertaking Responses | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-22 | 2024-04-22 | |
EB-2023-0195 | THESL_JT2.24_App A - OEBAppendices 2-FA, FB - GPMC_20240422 | Undertaking Responses | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-22 | 2024-04-22 | |
EB-2023-0195 | THESL_JT2.18_AppA_TH NWA_OEB_Draft_BCA Framework_20240422 | Undertaking Responses | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-22 | 2024-04-22 | |
EB-2023-0195 | THESL_JT1.13_App B Revised 2B-AMPCO-42 App A_20240422 | Undertaking Responses | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-22 | 2024-04-22 | |
EB-2023-0195 | THESL_JT1.13_App A 2025-2029 Forecast Units_20240422 | Undertaking Responses | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-22 | 2024-04-22 | |
EB-2023-0195 | THESL_JT1.1.6_App A Customer Data_20240422 | Undertaking Responses | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-22 | 2024-04-22 | |
EB-2023-0195 | THESL_Exhibit 1B - Application Overview_Updated_20240422 | Undertaking Responses | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-22 | 2024-04-22 | |
EB-2023-0195 | THESL_JT5.1 to 5.44_TC_UndertakingResp_Day5of5_Consolidated_20240422 | Undertaking Responses | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-22 | 2024-04-22 | |
EB-2023-0195 | THESL_8_T06_S01_OEB Appendix 2-W - Bill Impacts_Updated_20240422 | Undertaking Responses | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-22 | 2024-04-22 | |
EB-2023-0195 | THESL_7_T01_S03_Cost Allocation Model_Updated_20240422 | Undertaking Responses | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-22 | 2024-04-22 | |
EB-2023-0195 | THESL_6_T01_S06_2029 Rev Reqt Work Form_Updated_20240422 | Undertaking Responses | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-22 | 2024-04-22 | |
EB-2023-0195 | THESL_6_T01_S05_2028 Rev Reqt Work Form_Updated_20240422 | Undertaking Responses | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-22 | 2024-04-22 | |
EB-2023-0195 | THESL_6_T01_S04_2027 Rev Reqt Work Form_Updated_20240422 | Undertaking Responses | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-22 | 2024-04-22 | |
EB-2023-0195 | THESL_6_T01_S03_2026 Rev Reqt Work Form_Updated_20240422 | Undertaking Responses | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-22 | 2024-04-22 | |
EB-2023-0195 | THESL_6_T01_S02_2025 Rev Reqt Work Form_Updated_20240422 | Undertaking Responses | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-22 | 2024-04-22 | |
EB-2023-0195 | THESL_JT3.1 to 3.42_TC_UndertakingResp_Day3of5_Consolidated_20240422 | Undertaking Responses | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-22 | 2024-04-22 | |
EB-2023-0195 | THESL_JT2.1 to 2.27_TC_UndertakingResp_Day2of5_Consolidated_20240422 | Undertaking Responses | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-22 | 2024-04-22 | |
EB-2023-0195 | THESL_JT1.1 to 1.22_TC_UndertakingResp_Day1of5_Consolidated_20240422 | Undertaking Responses | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-22 | 2024-04-22 | |
EB-2023-0195 | THESL_TC UTs_Confidentiality_CoverLetter_TableofConcordance_20240422 | Undertaking Responses | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-22 | 2024-04-22 | |
EB-2023-0195 | THESL_2025-2029 Rate Application_TC Undertaking Responses and Evidence Update_20240422 | Undertaking Responses | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-22 | 2024-04-22 | |
EB-2023-0195 | THESL _TC Day 5 Transcript Corrections _20240418 | Correspondence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-18 | 2024-04-18 | |
EB-2023-0195 | JT4.27_THESL_TC_Undertaking Resp_App A_20240418 | Undertaking Responses | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-18 | 2024-04-18 | |
EB-2023-0195 | JT4.25_THESL_TC_underdakingResp_App A- 2025 NCP and CP_Application Update_20240418 | Undertaking Responses | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-18 | 2024-04-18 | |
EB-2023-0195 | JT4.24_THESL_TC_UndertakingResp_Consolidated_20240418 | Undertaking Responses | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-18 | 2024-04-18 | |
EB-2023-0195 | THESL_cvrltr_TC_UTResponses_OEB Staff JT5.20-JT5.30_JT5.32-JT5.41_BOMA JT4.24_JT4.2 | Undertaking Responses | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-18 | 2024-04-18 | |
EB-2023-0195 | K1.1_VECC_TC_questiosn_20240402 | Exhibits | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-02 | 2024-04-02 | |
EB-2023-0195 | Transcript for TC_day3_rv1_20240410 | Transcripts | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-12 | 2024-04-12 | |
EB-2023-0195 | Transcript for TC_day4_rv1_20240411 | Transcripts | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-12 | 2024-04-12 | |
EB-2023-0195 | Transcript for TC_day5_20240412 | Transcripts | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-12 | 2024-04-12 | |
EB-2023-0195 | THESL_2025-2029 Rate Application_TC Day 2 Transcript Corrections _20240410 | Correspondence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-11 | 2024-04-11 | |
EB-2023-0195 | THESL_2025-2029 Rate Application_TC Day 4 Transcript Corrections _20240412 | Correspondence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-12 | 2024-04-12 | |
EB-2023-0195 | THESL_2025-2029 Rate Application_TC Day 3 Transcript Corrections _20240411 | Correspondence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-11 | 2024-04-11 | |
EB-2023-0195 | Transcript for TC_day2_Rv1_20240411 | Transcripts | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-11 | 2024-04-11 | |
EB-2023-0195 | Transcript for TC_day2_20240409 | Transcripts | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-10 | 2024-04-10 | |
EB-2023-0195 | Transcript for TC_day1_rv2_20240408 | Transcripts | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-10 | 2024-04-10 | |
EB-2023-0195 | THESL_2025-2029 Rate Application_TC Day 1 Transcript Corrections _20240409 | Correspondence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-09 | 2024-04-09 | |
EB-2023-0195 | Transcript for TC day 1_20240408 | Transcripts | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-09 | 2024-04-09 | |
EB-2023-0195 | OEBLtr_Virtual Panel 4_20240405_signed | Correspondence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-05 | 2024-04-05 | |
EB-2023-0195 | THESL_IRR_Confidentiality_Table of Concordance Correction_CoverLetter_20240404 | Correspondence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-04 | 2024-04-04 | |
EB-2023-0195 | THESL_IRR_ by Witness Panel_20240328 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-28 | 2024-03-28 | |
EB-2023-0195 | THESL_IRR Exhibit 9 Staff_Updated_20240403 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-03 | 2024-04-03 | |
EB-2023-0195 | THESL_2025-2029 Rate Application_Updated 9-SEC-131_20240403 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-04 | 2024-04-04 | |
EB-2023-0195 | THESL_2025-2029 Rate Application_Letter re Virtual Panel 4_20240403 | Correspondence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-03 | 2024-04-03 | |
EB-2023-0195 | DRC_D&U_THESL_ND_20240403 | Declaration and Undertakings | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-03 | 2024-04-03 | |
EB-2023-0195 | CCC_TC_Time Estimates_20240403 | Correspondence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-03 | 2024-04-03 | |
EB-2023-0195 | AMPCO_LTR_TC_Timeline_20240402 | Correspondence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-03 | 2024-04-03 | |
EB-2023-0195 | THESL_4-AMPCO-84 App A_Updated_20240402 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-02 | 2024-04-02 | |
EB-2023-0195 | THESL_9_T02_S03_App S - Retrofit Projects (Jun2023-Dec2023)_20240402 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-02 | 2024-04-02 | |
EB-2023-0195 | THESL_9_T02_S03_App R - Non-Retrofit Projects (Jun2023-Dec2023)_20240402 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-02 | 2024-04-02 | |
EB-2023-0195 | THESL_9_T02_S03_App A - 2020-2024_LRAMVA_Final_20240402 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-02 | 2024-04-02 | |
EB-2023-0195 | THESL_9_T02_S01__DVA Continuity Schedule_Updated_20240402 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-02 | 2024-04-02 | |
EB-2023-0195 | THESL_6_T02_S02_2025_Income_Tax_PILs_Update 20240402 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-02 | 2024-04-02 | |
EB-2023-0195 | THESL_6_T01_S04 - Rev_Reqt_Work_Form 2027_20240402 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-02 | 2024-04-02 | |
EB-2023-0195 | THESL_6_T01_S06 - Rev_Reqt_Work_Form 2029_20240402 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-02 | 2024-04-02 | |
EB-2023-0195 | THESL_6_T01_S05 - Rev_Reqt_Work_Form 2028_20240402 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-02 | 2024-04-02 | |
EB-2023-0195 | THESL_6_T01_S03 - Rev_Reqt_Work_Form 2026_20240402 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-02 | 2024-04-02 | |
EB-2023-0195 | THESL_6_T01_S02 - Rev_Reqt_Work_Form 2025_20240402 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-02 | 2024-04-02 | |
EB-2023-0195 | THESL_3_T01_S02 - OEB Appendix 2-IB - Load_Forecast_Analysis_20240402 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-02 | 2024-04-02 | |
EB-2023-0195 | THESL_3_T01_S01_AppI - Regression Model Statistics - Customers_20240402 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-02 | 2024-04-02 | |
EB-2023-0195 | THESL_3_T01_S01_AppH - Regression Model Input Data - Customers_20240402 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-02 | 2024-04-02 | |
EB-2023-0195 | THESL_3_T01_S01_AppE - Extrapolation Method 2019-2020 and 2021-2024 Prov Frameworks_20240402 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-02 | 2024-04-02 | |
EB-2023-0195 | THESL_3_T01_S01_AppD - 2015-2022 Post-CFF historical savings_20240402 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-02 | 2024-04-02 | |
EB-2023-0195 | THESL_3_T01_S01_AppC - CDM Variables_20240402 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-02 | 2024-04-02 | |
EB-2023-0195 | THESL_3_T01_S01_AppB - Regression Model Statistics_20240402 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-02 | 2024-04-02 | |
EB-2023-0195 | THESL_3_T01_S01_AppA - Regression Model Input Data_20240402 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-02 | 2024-04-02 | |
EB-2023-0195 | THESL_2B_E4_AppB - OEB Appendix 2-AA_Program Summary_20240402 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-02 | 2024-04-02 | |
EB-2023-0195 | THESL_2B_E4_AppA - OEB Appendix 2-AB_20240402 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-02 | 2024-04-02 | |
EB-2023-0195 | THESL_2A_T02_S01_AppB-Appendix 2C - Depreciation and Amortization Expense_20240402 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-02 | 2024-04-02 | |
EB-2023-0195 | THESL_2A_T01_S02 - OEB Appendix 2-BA_20240402 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-02 | 2024-04-02 | |
EB-2023-0195 | THESL_2025-2029 Rate Application_Evidence Update_20240402 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-02 | 2024-04-02 | |
EB-2023-0195 | ED_Ltr_TC_Topics and Time estimates_20240402 | Correspondence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-02 | 2024-04-02 | |
EB-2023-0195 | VECC_TC_Topics and TimeEstimates_20240402 | Correspondence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-02 | 2024-04-02 | |
EB-2023-0195 | DRC_TC_Topics and Time Estimates_20240402 | Correspondence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-02 | 2024-04-02 | |
EB-2023-0195 | Staff_Ltr_TC_Time Estimates_20240402_signed | Correspondence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-02 | 2024-04-02 | |
EB-2023-0195 | Inerlife_TC Time Estimate_20240402 | Correspondence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-02 | 2024-04-02 | |
EB-2023-0195 | BOMA_TC Time Estimate_20240402 | Correspondence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-02 | 2024-04-02 | |
EB-2023-0195 | SEC_TC_Topics_TimeEstimates_20240402 | Correspondence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-02 | 2024-04-02 | |
EB-2023-0195 | CCMBC_TC_topics_TimeEstimates_20240402 | Correspondence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-02 | 2024-04-02 | |
EB-2023-0195 | Energy Probe_TC_Topics_TimeEstimate_20240402 | Correspondence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-02 | 2024-04-02 | |
EB-2023-0195 | PollutionProbe_Ltr_TC_TimeEstimate_20240402 | Correspondence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-02 | 2024-04-02 | |
EB-2023-0195 | PWU’s_TC_TimeEstimate_20240402 | Correspondence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-04-02 | 2024-04-02 | |
EB-2023-0195 | THESL_ltr_2025-2029 Rate Application_Redaction of Non Relevant Info_20240327 | Correspondence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-28 | 2024-03-28 | |
EB-2023-0195 | OEBltr_Hybrid Tech Conf_THESL_20240327_signed | Correspondence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-27 | 2024-03-27 | |
EB-2023-0195 | THESL_IRR Exhibit 2B_Part1.5of3_Updated_20240326 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-26 | 2024-03-26 | |
EB-2023-0195 | THESL_IRR Exhibit 2B_Part1.0of3_Updated_20240326 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-26 | 2024-03-26 | |
EB-2023-0195 | THESL_IRR Exhibit 1B_Part2of2_Updated_20240326 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-26 | 2024-03-26 | |
EB-2023-0195 | THESL_IRR_Updates_Confidentiality_CoverLetter_20240326 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-26 | 2024-03-26 | |
EB-2023-0195 | THESL_IRR Exhibit 1B_Part2of2_Updated_20240322 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-22 | 2024-03-22 | |
EB-2023-0195 | THESL_IRR Exhibit 1B_Part2.1of2_Updated_20240321 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-21 | 2024-03-21 | |
EB-2023-0195 | THESL_IRR_Confidentiality_CoverLetter_20240321 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-21 | 2024-03-21 | |
EB-2023-0195 | THESL_IRR Exhibit 5_Updated_20240321 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-21 | 2024-03-21 | |
EB-2023-0195 | THESL_IRR Exhibit 4_Updated_20240321 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-21 | 2024-03-21 | |
EB-2023-0195 | THESL_IRR Exhibit 2B_Part3of3_Updated_20240321 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-21 | 2024-03-21 | |
EB-2023-0195 | THESL_IRR Exhibit 2B_Part1of3_Updated_20240321 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-21 | 2024-03-21 | |
EB-2023-0195 | THESL_IRR Exhibit 1A_Updated_20240321 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-21 | 2024-03-21 | |
EB-2023-0195 | THESL_2025-2029 Rate Application_IRR Update_Cover Letter_20240321 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-21 | 2024-03-21 | |
EB-2023-0195 | OEBltr_Redaction Request_THESL_20240321_signed | Correspondence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-21 | 2024-03-21 | |
EB-2023-0195 | LoC_Anne Peiris_20231211_redacted | Letter of Comment | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-12-11 | 2023-12-11 | |
EB-2023-0195 | THESL_2025-2029 Rate Application_Ltr Request for Hybrid Hearings_20240321 | Correspondence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-21 | 2024-03-21 | |
EB-2023-0195 | THESL_9-Staff-354_App B_20240319 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-19 | 2024-03-19 | |
EB-2023-0195 | THESL_9-Staff-354_App A - 2017 Persistence_20240319 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-19 | 2024-03-19 | |
EB-2023-0195 | THESL_9-Staff-349-App A_DVA Continuity Schedule_20240319 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-19 | 2024-03-19 | |
EB-2023-0195 | THESL_6-Staff-320 App A_6_T02_S02_2025 Income Tax PILs_2023 Hist_2024 Bridge Update_20240319 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-19 | 2024-03-19 | |
EB-2023-0195 | THESL_4-Staff-310_App A - OEB Appendix 2-N_20240319 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-19 | 2024-03-19 | |
EB-2023-0195 | THESL_3-VECC -24_App A_20240319 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-19 | 2024-03-19 | |
EB-2023-0195 | THESL_2A-Staff-116_App A_20240319 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-19 | 2024-03-19 | |
EB-2023-0195 | THESL_1B-SEC-28_App B Unit Cost Survey Year Breakdown_20240319 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-19 | 2024-03-19 | |
EB-2023-0195 | THESL_1B-SEC-28_App A_Unit Cost Survey_20240319 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-19 | 2024-03-19 | |
EB-2023-0195 | THESL_1B-SEC-1_App C - OEB Appendix 2-H_20240319 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-19 | 2024-03-19 | |
EB-2023-0195 | THESL_1B-SEC-1_App B - OEB Appendix 2-BA_20240319 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-19 | 2024-03-19 | |
EB-2023-0195 | THESL_1B-SEC-1_App A - 2020-2024 In-Service Additions by Investment Category_20240319 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-19 | 2024-03-19 | |
EB-2023-0195 | THESL_2025-2029 Rate Application_IRR Appendices_Letter_20240319 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-19 | 2024-03-19 | |
EB-2023-0195 | THESL_2025-2029 Rate Application_Redaction of Non-Relevant Information_20240314 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-14 | 2024-03-14 | |
EB-2023-0195 | THESL_2025-2029 Rate Application_IR_Responses_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-12 | 2024-03-12 | |
EB-2023-0195 | THESL_2B-AMPCO-36_App A - Failures_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_2B-SEC-44_App A - ACA With Investment_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_2B-AMPCO-66_App A - 2020-2029 Decommissioned Fleet_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_2B-Staff-148_App A - Station Capacity Constraints_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_1B-Staff-09_Appendix A_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_1B-ED-3_App A_List of Work Centre Fossil Fuel Heating Equipment_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_1B-Staff-09_App A_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_1B-Staff-49_App A - BCA Calculator_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_1B-VECC-9_App A - Contact Centre Report 2022 Q4_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_1B-VECC-9_App B - Contact Centre Report 2023 Q4_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_2A-Staff-104_App A_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_2A-Staff-104_App B_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_2A-Staff-109_App B - 2A_T06_S02,3 - OEBAppendices 2-FA, FB - GPMC_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_2A-Staff-109_App C_2A_T06_S02,3_OEBAppendices 2-FA, FB - HONI_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_2A-Staff-109_App D_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_2B-AMPCO-24_App A_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_2B-AMPCO-38_App A - Deficiencies_20240311.xlsx | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_2B-AMPCO-42_App A_Forecast and Actual Units_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_2B-SEC-65_App A - ACA Information_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_2B-AMPCO-43_App A_20240311.xlsx | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_2B-SEC-46_App A - Data Source for D4 - Fig4_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_2B-SEC-60_App A_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_2B-SEC-67_App A - ACA Information_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_2B-SEC-68_App A - ACA Data_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_2B-SEC-76_App A - 2018-2029 Utilization_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_2B-Staff-117_App A - Appendix 2-BA_2019_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_2B-Staff-118_App A_OEB Appendix 2-D_Updated_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_2B-Staff-119_App A - Depreciation Variance_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_2B-SEC-70_App A_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_2B-SEC-66_App A_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_2B-SEC-46_App A - Data Source for D4 - Fig3 and 5_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_1B-Staff-91_App A - SAIFI Defective Equipment Tabular data_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_2B-Staff-131_App A - ACA Demographics and Useful Lives_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_2A-Staff-109_AppA 2A_T06_S02,3_OEBAppendices 2-FA, FB - ES_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_IRR Exhibit 2A_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_IRR Exhibit 9_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_IRR Exhibit 8_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_IRR Exhibit 7_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_IRR Exhibit 6_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_IRR Exhibit 5_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_IRR Exhibit 4_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_IRR Exhibit 3_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_IRR Exhibit 2B_Part3of3_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_IRR Exhibit 2B_Part2of3_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_IRR Exhibit 2B_Part1of3_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_IRR Exhibit 1B_Part1of2_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_IRR Exhibit 1A_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_2025-2029 Rate Application_IRR_Confidentiality_Request_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_2025-2029 Rate Application_IR_Responses_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_9-Staff-355_App D_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_9-Staff-355_App C_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_9-Staff-355_App A_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_8-Staff-333_App A_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_8-SEC-125_App A - 2021-2029 Distribution Charges_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_7-VECC-90_App C - Cost Allocation Model_Buildings_Secondary_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_7-VECC-90_App B - Cost Allocation Model_Secondary_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_7-VECC-90_App A - Cost Allocation Model_Buldings_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_7-Staff-326_App A - 2019 and 2025 Load Profiles_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_6-Staff-320_App A - 2025 Income Tax PILs_2023_2024 Update_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_5-Staff-313_App A - OEB Appendix OA-OB_Updated_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_4-Staff-295_App A - 2024 Cost Allocation Model_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_4-SEC-110_App A - 2-M_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_4-SEC-89_App A OEB APP2_JA-JB-JC-D-L_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_4-AMPCO-84_App A_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_3-VECC-53_App A - 2025-2029 Forecast kWh and kVa_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_3-VECC-42_App A_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_3-VECC-41_App A - LDEV Registrations Forecast_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_3-VECC-39_App A_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_3-VECC-37_App B - 2023-2029 Streetlighting Energy Usage Forecast_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_3-VECC-37_App A - 2023-2029 Load Forecast_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_3-VECC-34_App A 2015-2017 Final-Verified-Results-THESL_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_3-VECC-33_App B - 2015-2017 Final-Verified-Results-THESL_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_3-VECC-33_App A - 2015_2017_Savings_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_3-VECC-23_App A - CBoC_Employment_Population_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_3-SEC-79_App A_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_3-BOMA-4_App C - CSMUR 2023-2029_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_3-BOMA-04_App B_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_3-BOMA-04_App A - 2017-2029 CSMUR WN monthly Consumption_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | THESL_3-BOMA-03_App A_20240311 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-11 | 2024-03-11 | |
EB-2023-0195 | DRC_LTR_Change of Address_THESL_20240308 | Correspondence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-03-08 | 2024-03-08 | |
EB-2023-0195 | VECC_IRs_THESL_20240212 | Interrogatories to Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-02-13 | 2024-02-13 | |
EB-2023-0195 | ED_IRs_THESL_20240212 | Interrogatories to Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-02-12 | 2024-02-12 | |
EB-2023-0195 | AMPCO_IRs_THESL_20240212 | Interrogatories to Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-02-12 | 2024-02-12 | |
EB-2023-0195 | AMPCO_cvrltr_IRs_THESL_20240212 | Interrogatories to Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-02-12 | 2024-02-12 | |
EB-2023-0195 | BOMA_IRs_THESL__20240212 | Interrogatories to Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-02-12 | 2024-02-12 | |
EB-2023-0195 | CCC_IRS_THESL_20240212 | Interrogatories to Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-02-12 | 2024-02-12 | |
EB-2023-0195 | SEC_IRs_THESL_20240212 | Interrogatories to Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-02-12 | 2024-02-12 | |
EB-2023-0195 | DRC_IRs_THESL_20240212 | Interrogatories to Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-02-12 | 2024-02-12 | |
EB-2023-0195 | THESL_2025-2029 Rate Application_Disclosure of Documents_20240208 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-02-12 | 2024-02-12 | |
EB-2023-0195 | Energy Probe_IRs_TH_20240212 | Interrogatories to Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-02-12 | 2024-02-12 | |
EB-2023-0195 | OEB Staff_IRs_THESL_part 2_20240212_Redacted_signed | Interrogatories to Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-02-12 | 2024-02-12 | |
EB-2023-0195 | OEB Staff_IRs_THESL_signed | Interrogatories to Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-02-12 | 2024-02-12 | |
EB-2023-0195 | PWU_IRs_THESL_20240212 | Interrogatories to Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-02-12 | 2024-02-12 | |
EB-2023-0195 | PWU_cvr ltr_IRs_THESL_20240212 | Interrogatories to Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-02-12 | 2024-02-12 | |
EB-2023-0195 | CCMBC_IRs_THESL_20240212 | Interrogatories to Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-02-12 | 2024-02-12 | |
EB-2023-0195 | PollutionProbe_IRs_AppendixB_Assessment-of-IESO-Pathways-to-Decarbonization_20240212 | Interrogatories to Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-02-12 | 2024-02-12 | |
EB-2023-0195 | PollutionProbe_IRs_AppendixA_CanmetReport_20240212 | Interrogatories to Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-02-12 | 2024-02-12 | |
EB-2023-0195 | PollutionProbe_cvrltr_IRs_THESL_20240212 | Interrogatories to Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-02-12 | 2024-02-12 | |
EB-2023-0195 | THESL_4_T04_S02 - OEB Appendix 2-K_20240208 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-02-08 | 2024-02-08 | |
EB-2023-0195 | THESL_2A_T04_S02_AppA - OEB Appendix 2-D Overhead Costs_20240208 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-02-08 | 2024-02-08 | |
EB-2023-0195 | THESL_1B_T03_S03_AppB - PEG Forecast Benchmarking_20240208 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-02-08 | 2024-02-08 | |
EB-2023-0195 | THESL_2025-2029 Rate Application_Disclosure of Documents_20240208 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-02-08 | 2024-02-08 | |
EB-2023-0195 | THESL_UMS Group_Peer Group Comparisons_20240207 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-02-07 | 2024-02-07 | |
EB-2023-0195 | THESL_Drive Time Data_20240207 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-02-07 | 2024-02-07 | |
EB-2023-0195 | THESL_2025-2029 Rate Application_Unit Cost and Drive Time Data_20240207 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-02-07 | 2024-02-07 | |
EB-2023-0195 | Intervention List_Updated_20240125 | Intervenor List | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-01-25 | 2024-01-25 | |
EB-2023-0195 | Dec_on Conf_po3_Issues list_ExpEvd_20240205_signed | Decision; Procedural Order | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-02-05 | 2024-02-05 | |
EB-2023-0195 | THESL_2B_E4_AppB - OEB Appendix 2-AA (Program Summary)_20240129 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-01-29 | 2024-01-29 | |
EB-2023-0195 | THESL_2B_E4_AppA - OEB Appendix 2-AB_20240129 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-01-29 | 2024-01-29 | |
EB-2023-0195 | THESL_2A_T05_S05-6 - OEB Appendices 2-FA-FB- Stations Expansion_20240129 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-01-29 | 2024-01-29 | |
EB-2023-0195 | THESL_2A_T02_S01_AppA - Summary of Depreciation Expense_20240129 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-01-29 | 2024-01-29 | |
EB-2023-0195 | THESL_2A_T01_S02 - OEB Appendix 2-BA_20240129.XLSX | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-01-29 | 2024-01-29 | |
EB-2023-0195 | THESL_2025-2029 Rate Application_Evidence Update_20240129.pdf | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-01-29 | 2024-01-29 | |
EB-2023-0195 | THESL_Confidentiality_Reply_Sub_20240129 | Correspondence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-01-29 | 2024-01-29 | |
EB-2023-0195 | CCC_Letter_THESL_ReConfidentiality_20240129 | Correspondence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-01-29 | 2024-01-29 | |
EB-2023-0195 | THESL_2025-2029 Rate Application_Clearspring Data Confidentiality Request_20240126 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-01-26 | 2024-01-26 | |
EB-2023-0195 | Enerlife CV Ian Jarvis 2024_20240126 | Correspondence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-01-26 | 2024-01-26 | |
EB-2023-0195 | Enerlife CV Clement Li 2024_20240126 | Correspondence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-01-26 | 2024-01-26 | |
EB-2023-0195 | BOMA intent to file expert evidence_20240126 | Correspondence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-01-26 | 2024-01-26 | |
EB-2023-0195 | PEG_RK_D&U_20240125 | Declaration and Undertakings | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-01-25 | 2024-01-25 | |
EB-2023-0195 | po2_THESL COS 2025-2029_20240126_signed | Procedural Order | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-01-26 | 2024-01-26 | |
EB-2023-0195 | PEG_MM_D&U_20240125 | Declaration and Undertakings | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-01-25 | 2024-01-25 | |
EB-2023-0195 | PEG_GW_D&U_20240125 | Declaration and Undertakings | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-01-25 | 2024-01-25 | |
EB-2023-0195 | PEG_DH_D&U_20240125 | Declaration and Undertakings | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-01-25 | 2024-01-25 | |
EB-2023-0195 | PEG_MNL_D&U_20240125 | Declaration and Undertakings | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-01-25 | 2024-01-25 | |
EB-2023-0195 | OEB Staff Ltr_Issues List_THESL_20240125 signed | Correspondence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-01-25 | 2024-01-25 | |
EB-2023-0195 | AMPCO_LTR_Re Confidentiality_THESL_20240124 | Correspondence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-01-24 | 2024-01-24 | |
EB-2023-0195 | OEB_Staff_Submission_re Confidentiality_20240124 signed | Correspondence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-01-24 | 2024-01-24 | |
EB-2023-0195 | THESL_4_T04_S02 - OEB Appendix 2-K_Redacted_20240124 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-01-24 | 2024-01-24 | |
EB-2023-0195 | THESL_2A_T04_S02_AppA - OEB Appendix 2-D Overhead Costs - Redacted_20240124 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-01-24 | 2024-01-24 | |
EB-2023-0195 | THESL_Exhibit 2A_Rate Base_20240124 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-01-24 | 2024-01-24 | |
EB-2023-0195 | THESL_1B_T03_S03_AppB - PEG Forecast Benchmarking_Redacted_20240124 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-01-24 | 2024-01-24 | |
EB-2023-0195 | THESL_APPL_CovLtr_Confidentiality REQ_Update_20240124 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-01-24 | 2024-01-24 | |
EB-2023-0195 | THESL_Exhibit 4_Operating Expenses_20240124 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-01-24 | 2024-01-24 | |
EB-2023-0195 | VECC_Ltr_Re conf Sub_THESL_20240124 | Correspondence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-01-24 | 2024-01-24 | |
EB-2023-0195 | SEC_Ltr_re ConfSub_THESL_20240124 | Correspondence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-01-24 | 2024-01-24 | |
EB-2023-0195 | THESL_LTR_TC Schedule_20240124 | Correspondence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-01-24 | 2024-01-24 | |
EB-2023-0195 | OEB Staff Ltr_Expert Evidence_THESL_20240124_signed | Correspondence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-01-24 | 2024-01-24 | |
EB-2023-0195 | PollutionProbe_MB_D&U_THESL_20240123 | Declaration and Undertakings | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-01-23 | 2024-01-23 | |
EB-2023-0195 | THESL_D&U_JS_20211219 | Declaration and Undertakings | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-01-19 | 2024-01-19 | |
EB-2023-0195 | IESO_LateIntrvREQ_THESL Rates_20240117 | Intervenor Request Letter | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-01-17 | 2024-01-17 | |
EB-2023-0195 | SEC_THESL_D&U_ MR_20240116 | Declaration and Undertakings | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-01-16 | 2024-01-16 | |
EB-2023-0195 | SEC_THESL_D&U_ JS_20240116 | Declaration and Undertakings | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-01-16 | 2024-01-16 | |
EB-2023-0195 | po1_THESL COS_20240115_signed | Procedural Order | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-01-15 | 2024-01-15 | |
EB-2023-0195 | LoC_George Mielniczek _20240126_Redacted | Letter of Comment | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-01-16 | 2024-01-16 | |
EB-2023-0195 | OEB_Midgard_K_Wu_D&U_Form_20240115 | Declaration and Undertakings | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-01-15 | 2024-01-15 | |
EB-2023-0195 | Cover ltr_THESL_2025-2029 Application_20231117 | Correspondence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | OEB Staff Ltr_Expert_Evid_THESL_20240112 esigned | Correspondence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-01-12 | 2024-01-12 | |
EB-2023-0195 | THESL_Ltr_Evd day RQST_2025-2029 Rate Appl_20240111 | Correspondence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-01-11 | 2024-01-11 | |
EB-2023-0195 | THESL_Ltr_Draft Issues List_2025-2029 Rate Appl_20240111 | Correspondence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-01-11 | 2024-01-11 | |
EB-2023-0195 | LoC_Elizabeth Maturana_20231229_Redacted | Letter of Comment | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-12-29 | 2023-12-29 | |
EB-2023-0195 | ED_IntrvREQ_THESL Rates_20240108 | Intervenor Request Letter | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-01-08 | 2024-01-08 | |
EB-2023-0195 | BOMA_IntrvREQ_THESL Rates_20240108 | Intervenor Request Letter | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-01-08 | 2024-01-08 | |
EB-2023-0195 | AMPCO_IntrvREQ_THESL Rates_20240108 | Intervenor Request Letter | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-01-08 | 2024-01-08 | |
EB-2023-0195 | THESL_Exhibit 9_Deferral and Variance Accounts_20231219 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-01-05 | 2024-01-05 | |
EB-2023-0195 | DRC_IntrvREQ_THESL Rates_20240105 | Intervenor Request Letter | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-01-05 | 2024-01-05 | |
EB-2023-0195 | Energy Probe_IntrvREQ_THESL Rates_20240104 | Intervenor Request Letter | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-01-04 | 2024-01-04 | |
EB-2023-0195 | CCMBC_IntrvREQ_THESL Rates_20240104 | Intervenor Request Letter | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-01-04 | 2024-01-04 | |
EB-2023-0195 | EGI_IntrvREQ_THESL_20240103 | Intervenor Request Letter | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-01-03 | 2024-01-03 | |
EB-2023-0195 | CCC_IntrvREQ_THESL_20240103 | Intervenor Request Letter | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-01-03 | 2024-01-03 | |
EB-2023-0195 | Pollution Probe_IntrvREQ_THESL_20240102 | Intervenor Request Letter | Toronto Hydro-Electric System Limited - Electricity Distributor | 2024-01-02 | 2024-01-02 | |
EB-2023-0195 | PWU_IntrvREQ_THESL_20231229 | Intervenor Request Letter | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-12-29 | 2023-12-29 | |
EB-2023-0195 | LoC_JIM SMITH_20231218_Redacted | Letter of Comment | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-12-18 | 2023-12-18 | |
EB-2023-0195 | LoC_Toronto Hydro_customer_20231220 | Letter of Comment | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-12-20 | 2023-12-20 | |
EB-2023-0195 | THESL_6_T02_S02_2025_Income_Tax_PILs_Updated_20231219 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-12-19 | 2023-12-19 | |
EB-2023-0195 | THESL_6_T01_S07 - Rev_Reqt_Work_Form 2024_Updated_20231219 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-12-19 | 2023-12-19 | |
EB-2023-0195 | THESL_Exhibit 6_Revenue Requirement_Updated_20231219 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-12-19 | 2023-12-19 | |
EB-2023-0195 | THESL_Exhibit 2A_Rate Base_Updated_20231219 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-12-19 | 2023-12-19 | |
EB-2023-0195 | THESL_2025-29 Rate Appl_Update_cvrltr_20231219 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-12-19 | 2023-12-19 | |
EB-2023-0195 | VECC_IntrvREQ_THESL_20231219 | Intervenor Request Letter | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-12-19 | 2023-12-19 | |
EB-2023-0195 | LoC_Cecil Fong_20231214_Redacted | Letter of Comment | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-12-14 | 2023-12-14 | |
EB-2023-0195 | LoC_Vincenza Sobolewski_20231211_Redacted | Letter of Comment | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-12-11 | 2023-12-11 | |
EB-2023-0195 | LoC_Tapashree Guha_20231211_Redacted | Letter of Comment | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-12-11 | 2023-12-11 | |
EB-2023-0195 | LoC_Stefan Ruby_20231212_Redacted | Letter of Comment | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-12-12 | 2023-12-12 | |
EB-2023-0195 | LoC_Sherry Edwards_20231211_Redacted | Letter of Comment | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-12-11 | 2023-12-11 | |
EB-2023-0195 | LoC_Shawn McCrea_20231211_Redacted | Letter of Comment | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-12-12 | 2023-12-12 | |
EB-2023-0195 | LoC_Rita Leal_20231211_Redacted | Letter of Comment | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-12-11 | 2023-12-11 | |
EB-2023-0195 | LoC_Redon Hoxhaj_20231211_Redacted | Letter of Comment | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-12-11 | 2023-12-11 | |
EB-2023-0195 | LoC_Randy John_20231211_Redacted | Letter of Comment | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-12-11 | 2023-12-11 | |
EB-2023-0195 | LoC_Marissa Binstock_20231211_Redacted | Letter of Comment | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-12-11 | 2023-12-11 | |
EB-2023-0195 | LoC_Liane deGooyer_20231211_Redacted | Letter of Comment | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-12-11 | 2023-12-11 | |
EB-2023-0195 | LoC_Jovana Smoljanic_20231211_Redacted | Letter of Comment | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-12-11 | 2023-12-11 | |
EB-2023-0195 | LoC_Ivan Cordova Hernandez_20231211_Redacted | Letter of Comment | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-12-11 | 2023-12-11 | |
EB-2023-0195 | LoC_Hamed Bahador_20231211_Redacted | Letter of Comment | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-12-11 | 2023-12-11 | |
EB-2023-0195 | LoC_Charles S Trenholme_20231211_Redacted | Letter of Comment | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-12-11 | 2023-12-11 | |
EB-2023-0195 | LoC_Caroline Benyes_20231211_Redacted | Letter of Comment | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-12-11 | 2023-12-11 | |
EB-2023-0195 | LoC_Alysia Myette_20231211_Redacted | Letter of Comment | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-12-11 | 2023-12-11 | |
EB-2023-0195 | THESL_Affidavit_20231211 | Affidavits of Service | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-12-11 | 2023-12-11 | |
EB-2023-0195 | SEC_IntrvREQ_THESL_20231204 | Intervenor Request Letter | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-12-04 | 2023-12-04 | |
EB-2023-0195 | notice_THESL_20231201_FR | Notice | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-12-01 | 2023-12-01 | |
EB-2023-0195 | notice_THESL_20231201 | Notice | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-12-01 | 2023-12-01 | |
EB-2023-0195 | lod_THESL_20231201_eSigned | Letter of Direction | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-12-01 | 2023-12-01 | |
EB-2023-0195 | OEB Completeness_Ltr_THESL_20231201_eSigned | Correspondence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-12-01 | 2023-12-01 | |
EB-2023-0195 | THESL_4_T01_S02-5_APP2_JA-JB-JC-D-L_20231201 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-12-01 | 2023-12-01 | |
EB-2023-0195 | THESL_Exhibit 4_Operating Expenses_20231201 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-12-01 | 2023-12-01 | |
EB-2023-0195 | THESL_2025-2029 Rate Application_Update_Cover Letter_20231201 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-12-01 | 2023-12-01 | |
EB-2023-0195 | THESL_Exhibit 1A_ Administration_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-23 | 2023-11-23 | |
EB-2023-0195 | THESL_Exhibit 4_Operating Expenses_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-23 | 2023-11-23 | |
EB-2023-0195 | Ack Ltr_Toronto Hydro_20231120_signed | Acknowledgement Letter | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-20 | 2023-11-20 | |
EB-2023-0195 | THESL_Exhibit 1B - Application Overview_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_8_T06_S01 - OEB Appendix 2-W - Bill Impacts_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_8_T05_S01 - RTSR_Workform_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_6_T02_S02_2025_Test_year_Income_Tax_PILs_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_8_T01_02 Fixed Variable Split_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_6_T01_S06 - Rev_Reqt_Work_Form 2029_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_6_T01_S05 - Rev_Reqt_Work_Form 2028_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_6_T01_S04 - Rev_Reqt_Work_Form 2027_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_8_T04_S01 - OEB Appendix 2-R - Loss Factors_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_8_T03_S02 - Proposed Tariff Sheets_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_7_T01_S03 - Cost_Allocation_Model_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_6_T01_S03 - Rev_Reqt_Work_Form 2026_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_6_T01_S02 - Rev_Reqt_Work_Form 2025_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_5_T01_S02_3_OEB Appendix OA-OB_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_4_T05_S02_OEB Appendix 2-N - Shared Services_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_4_T04_S02 - OEB Appendix 2-K_Redacted_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_3_T01_S01_AppI - Regression Model Statistics - Customers_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_3_T01_S01_AppC - CDM Variables_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_3_T01_S02 - OEB Appendix 2-IB - Load_Forecast_Analysis_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_3_T01_S01_AppB - Regression Model Statistics_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_4_T02_S18_AppA - OEB Appendix 2-M_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_4_T01_S02-5_APP2_JA-JB-JC-D-L_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_3_T02_S02 - OEB Appendix 2-H - Other Revenues_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_3_T01_S01_AppH - Regression Model Input Data - Customers_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_3_T01_S01_AppE - Extrapolation Method 2019-2020 and 2021-2024 Prov Frameworks_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_3_T01_S01_AppD- 2015-2022 Post-CFF historical savings_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_2B_E4_AppA - OEB Appendix 2-AB_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_2B_D3_AppB - ACA Results Summary_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_2A_T05_S02-3 - OEBAppendices 2-FA-FB - EnergyStorage_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_2A_T04_S02_AppA - OEB Appendix 2-D Overhead Costs_Redacted_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_2A_T03_S01_AppA - Cost of Power_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_3_T01_S01_AppA - Regression Model Input Data_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_2B_E4_AppB - OEB Appendix 2-AA - Program Summary_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_2A_T05_S04-5 - OEBAppendices 2-FA-FB - GPMC_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_2A_T02_S01_AppA - Summary of Depreciation Expense_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_2A_T01_S02 - OEB Appendix 2-BA_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_2A_T01_S01_App A - 2020-2024 In-Service Additions by Investment Category_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_1B_T03_S02-App C - OEB Appendix 2-G - ESQR and Reliability_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_1B_T03_S02_App D_OEB Appendix 5-A_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_1A_T03_S02 Filing Requirements Checklist_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_2A_T02_S01_AppB-Appendix 2C - Depreciation and Amortization Expense_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_2A_T02_S01_AppC - OEB Appendix 2-BB - Useful Life Comparison_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_1B_T03_S03_AppB - PEG Forecast Benchmarking_Redacted_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_1A_T03_S01_AppA - OEB Appendix 2-A -List of Requested Approvals_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_9_T01_S01_App A - Calculation of Useful Life Change Impacts_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_9_T02_S01-Continuity_Schedule_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_9_T02_S02 - GA Analysis Workform_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_9_T02_S03_App A- 2020-2022_LRAMVA_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_9_T02_S03_AppB - 2017 IESO Final Verified Results_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_9_T02_S03_AppC - IESO Participation and Cost Reports_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_9_T02_S03_AppE - Retrofit Projects_Mar2019-May2020_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_9_T02_S03_AppH - Retrofit Projects_Jun2020-May2023_20231117.xlsx | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_9_T03_S01 - Rate Rider Table_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_9_T02_S03_AppD - Detailed Project-Level Savings_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_9_T02_S03_AppF - Non-Retrofit Projects_Mar2019-May2020_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_9_T02_S03_AppG - Non-Retrofit Projects_Jun2020-May2023_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_Exhibit 6_Revenue Requirement_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_Exhibit 5_Cost of Capital and Capital Structure_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
EB-2023-0195 | THESL_Exhibit 9_Deferral and Variance Accounts_20231117 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2023-11-17 | 2023-11-17 | |
Case Number | File Name | Document Type | Applicant | Issued By OEB | Received By OEB | Date Issued/Received |