Advanced Regulatory Document Search (RDS)

 

Search Results for: Records - Case Number=EB-2023-0195 - 590 Records Found

sort icon Sorting Your Search Results
The most recent documents automatically show at the top. To sort by different categories (e.g. by Document Type) click the column header. Click it again to switch between ascending/descending order.



info iconCase Information
Click the case number to view details for that proceeding.

Filter on Search Results:
Case Number File Name Document Type Applicant Issued By OEB Received By OEB Date Issued/Received
EB-2023-0195 document icon OEBltr_dec release advance review_THESL_20241206_signed Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-12-06 2024-12-06
EB-2023-0195 document icon BOMA_comments_THESL_DRO_20241204 Comments Toronto Hydro-Electric System Limited - Electricity Distributor 2024-12-03 2024-12-03
EB-2023-0195 document icon OEB_Staff_Comments_THESL_DRO_20241203_signed Comments Toronto Hydro-Electric System Limited - Electricity Distributor 2024-12-03 2024-12-03
EB-2023-0195 document icon THESL_DRO_Schedule 8_OEB Appendix 2-W Bill Impacts_20241126 Draft Rate Order Toronto Hydro-Electric System Limited - Electricity Distributor 2024-11-26 2024-11-26
EB-2023-0195 document icon THESL_DRO_Schedule 4_PILs Model - Income Tax Workform_20241126 Draft Rate Order Toronto Hydro-Electric System Limited - Electricity Distributor 2024-11-26 2024-11-26
EB-2023-0195 document icon THESL_DRO_Schedule 3_OEB Appendix 2-OA-OB_20241126 Draft Rate Order Toronto Hydro-Electric System Limited - Electricity Distributor 2024-11-26 2024-11-26
EB-2023-0195 document icon THESL_DRO_Schedule 2.5-2.6_OEBAppendices 2-FA_FB - HONI_20241126 Draft Rate Order Toronto Hydro-Electric System Limited - Electricity Distributor 2024-11-26 2024-11-26
EB-2023-0195 document icon THESL_DRO_Schedule 2.3-2.4_OEBAppendices 2-FA_FB - ES_20241126 Draft Rate Order Toronto Hydro-Electric System Limited - Electricity Distributor 2024-11-26 2024-11-26
EB-2023-0195 document icon THESL_DRO_Schedule 2.1-2.2_OEBAppendices 2-FA_FB - GPMC_20241126 Draft Rate Order Toronto Hydro-Electric System Limited - Electricity Distributor 2024-11-26 2024-11-26
EB-2023-0195 document icon THESL_DRO_Schedule 9.5_2029 Interim Tariff Sheet_20241126 Draft Rate Order Toronto Hydro-Electric System Limited - Electricity Distributor 2024-11-26 2024-11-26
EB-2023-0195 document icon THESL_DRO_Schedule 9.4_2028 Interim Tariff Sheet_20241126 Draft Rate Order Toronto Hydro-Electric System Limited - Electricity Distributor 2024-11-26 2024-11-26
EB-2023-0195 document icon THESL_DRO_Schedule 9.2_2026 Interim Tariff Sheet_20241126 Draft Rate Order Toronto Hydro-Electric System Limited - Electricity Distributor 2024-11-26 2024-11-26
EB-2023-0195 document icon THESL_DRO_Schedule 9.1_2025 Tariff Sheet_20241126 Draft Rate Order Toronto Hydro-Electric System Limited - Electricity Distributor 2024-11-26 2024-11-26
EB-2023-0195 document icon THESL_DRO_Schedule 7.2_2026-2029 Alloc Fixed-Variable Rates_20241126 Draft Rate Order Toronto Hydro-Electric System Limited - Electricity Distributor 2024-11-26 2024-11-26
EB-2023-0195 document icon THESL_DRO_Schedule 7.1_2025 Alloc Fixed-Variable Rates_20241126 Draft Rate Order Toronto Hydro-Electric System Limited - Electricity Distributor 2024-11-26 2024-11-26
EB-2023-0195 document icon THESL_DRO_Schedule 5_Retail Transmission Service Rates_20241126 Draft Rate Order Toronto Hydro-Electric System Limited - Electricity Distributor 2024-11-26 2024-11-26
EB-2023-0195 document icon THESL_DRO_Schedule 6_Cost Allocation Model_20241126 Draft Rate Order Toronto Hydro-Electric System Limited - Electricity Distributor 2024-11-26 2024-11-26
EB-2023-0195 document icon THESL_DRO_Schedule 1.5_2029 Rev Reqt Workform_20241126 Draft Rate Order Toronto Hydro-Electric System Limited - Electricity Distributor 2024-11-26 2024-11-26
EB-2023-0195 document icon THESL_DRO_Schedule 1.3_2027 Rev Reqt Workform_20241126 Draft Rate Order Toronto Hydro-Electric System Limited - Electricity Distributor 2024-11-26 2024-11-26
EB-2023-0195 document icon THESL_DRO_Schedule 1.4_2028 Rev Reqt Workform_20241126 Draft Rate Order Toronto Hydro-Electric System Limited - Electricity Distributor 2024-11-26 2024-11-26
EB-2023-0195 document icon THESL_DRO_Schedule 9.3_2027 Interim Tariff Sheet_20241126 Draft Rate Order Toronto Hydro-Electric System Limited - Electricity Distributor 2024-11-26 2024-11-26
EB-2023-0195 document icon THESL_DRO_Schedule 1.2_2026 Rev Reqt Workform_20241126 Draft Rate Order Toronto Hydro-Electric System Limited - Electricity Distributor 2024-11-26 2024-11-26
EB-2023-0195 document icon THESL_DRO_Schedule 1.1_2025 Rev Reqt Workform_20241126 Draft Rate Order Toronto Hydro-Electric System Limited - Electricity Distributor 2024-11-26 2024-11-26
EB-2023-0195 document icon THESL_DRO_20241126 Draft Rate Order Toronto Hydro-Electric System Limited - Electricity Distributor 2024-11-26 2024-11-26
EB-2023-0195 document icon THESL_2025-2029_DRO_CoverLetter_20241126 Draft Rate Order Toronto Hydro-Electric System Limited - Electricity Distributor 2024-11-26 2024-11-26
EB-2023-0195 document icon dec_order_Partial_THESL_20241112_signed Decision and Order Toronto Hydro-Electric System Limited - Electricity Distributor 2024-11-12 2024-11-12
EB-2023-0195 document icon OEB_ltr_THESL_Dec Release_Advance Review_20241107_esigned Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-11-07 2024-11-07
EB-2023-0195 document icon THESL_2025-2029 Rate Application_Ltr Regarding Decision Release_20241106 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-11-06 2024-11-06
EB-2023-0195 document icon UT1.1_THESL_Settlement Presentation_20241022 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2024-10-22 2024-10-22
EB-2023-0195 document icon Transcript_Presentation of Settlement Agreement_20241017 Transcripts Toronto Hydro-Electric System Limited - Electricity Distributor 2024-10-17 2024-10-17
EB-2023-0195 document icon THESL_Settlement Presentation Day Submission_20241011 Submission Toronto Hydro-Electric System Limited - Electricity Distributor 2024-10-11 2024-10-11
EB-2023-0195 document icon PEG_Clearspring_Report_Errata_revised_20241009 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-10-09 2024-10-09
EB-2023-0195 document icon OEBStaff_Ltr_PEG_Errata_20241009_signed Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-10-09 2024-10-09
EB-2023-0195 document icon THESL_IRR Exhibit 1B_Part2of2_Updated_20241009 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-10-09 2024-10-09
EB-2023-0195 document icon THESL_Updated IRR_1B-SEC-5 App E_20241009 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-10-09 2024-10-09
EB-2023-0195 document icon THESL_ReplyARGSUB_20241004 Applicant Reply Argument Toronto Hydro-Electric System Limited - Electricity Distributor 2024-10-04 2024-10-04
EB-2023-0195 document icon po9_THESL COS 2025-2029_20240927_signed Procedural Order Toronto Hydro-Electric System Limited - Electricity Distributor 2024-09-27 2024-09-27
EB-2023-0195 document icon Dec_on Confidentiality_po8_20240926_signed Decision; Procedural Order Toronto Hydro-Electric System Limited - Electricity Distributor 2024-09-26 2024-09-26
EB-2023-0195 document icon AMPCO_SUB_Innovation Fund_THESL_20240919 Submission Toronto Hydro-Electric System Limited - Electricity Distributor 2024-09-19 2024-09-19
EB-2023-0195 document icon AMPCO_Cvr_LTR_Innovation Fund_20240919 Submission Toronto Hydro-Electric System Limited - Electricity Distributor 2024-09-19 2024-09-19
EB-2023-0195 document icon CCC_SUB_Innovation Fund_THESL_20240919 Submission Toronto Hydro-Electric System Limited - Electricity Distributor 2024-09-19 2024-09-19
EB-2023-0195 document icon ED_SUB_Innovation fund_THESL_20240918 Submission Toronto Hydro-Electric System Limited - Electricity Distributor 2024-09-18 2024-09-18
EB-2023-0195 document icon Energy Probe_SUB_Innovation Fund_THESL_20240918 Submission Toronto Hydro-Electric System Limited - Electricity Distributor 2024-09-18 2024-09-18
EB-2023-0195 document icon VECC_ SUB_ Innovation Fund_THESL_20240918 Submission Toronto Hydro-Electric System Limited - Electricity Distributor 2024-09-18 2024-09-18
EB-2023-0195 document icon BOMA_SUB_Innovation_fund_THESL_20240918 Submission Toronto Hydro-Electric System Limited - Electricity Distributor 2024-09-18 2024-09-18
EB-2023-0195 document icon SEC_SUB_InnovationFund_THESL_20240918 Submission Toronto Hydro-Electric System Limited - Electricity Distributor 2024-09-18 2024-09-18
EB-2023-0195 document icon DRC_SUB_Innovation fund_THESL_20240918 Submission Toronto Hydro-Electric System Limited - Electricity Distributor 2024-09-18 2024-09-18
EB-2023-0195 document icon PollutionProbe_SUB_InnovationFund_THESL_20240918 Submission Toronto Hydro-Electric System Limited - Electricity Distributor 2024-09-18 2024-09-18
EB-2023-0195 document icon OEB_Staff_SUB_Innovation Fund_THESL_20240918 Submission Toronto Hydro-Electric System Limited - Electricity Distributor 2024-09-18 2024-09-18
EB-2023-0195 document icon THESL_2025 Rate App_Response to Letters of Comment_20240916 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-09-16 2024-09-16
EB-2023-0195 document icon LoC_George M_20240903_redacted Letter of Comment Toronto Hydro-Electric System Limited - Electricity Distributor 2024-09-03 2024-09-03
EB-2023-0195 document icon OEB_Staff_Submission_Settlement_20240903 Submission Toronto Hydro-Electric System Limited - Electricity Distributor 2024-09-03 2024-09-03
EB-2023-0195 document icon po7_THESL COS 2025-2029_20240826_signed Procedural Order Toronto Hydro-Electric System Limited - Electricity Distributor 2024-08-26 2024-08-26
EB-2023-0195 document icon THESL_CQ-VECC-02_App A_20240524 Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2024-08-16 2024-08-16
EB-2023-0195 document icon THESL_CQ-SEC-13_App A_20240524 Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2024-08-16 2024-08-16
EB-2023-0195 document icon THESL_CQ-SEC-11_App A_20240524 Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2024-08-16 2024-08-16
EB-2023-0195 document icon THESL_CQ-SEC-10_App A_20240524 Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2024-08-16 2024-08-16
EB-2023-0195 document icon THESL_CQ-SEC-08_App A_Updated_20240724 Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2024-08-16 2024-08-16
EB-2023-0195 document icon THESL_JT5.6 and JT5.8_Updated_20240620 Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2024-08-16 2024-08-16
EB-2023-0195 document icon THESL_Consolidated_Responses to Settlement Questions_20240816 Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2024-08-16 2024-08-16
EB-2023-0195 document icon THESL_2025-2029 Rate Application_Cover Letter_Settlement Proposal_20240816 Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2024-08-16 2024-08-16
EB-2023-0195 document icon THESL_Settlement Proposal_20240816 Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2024-08-16 2024-08-16
EB-2023-0195 document icon THESL_Settlement Proposal_Schedule 30.5_2029 Interim Tariff Sheet_20240816 Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2024-08-16 2024-08-16
EB-2023-0195 document icon THESL_Settlement Proposal_Schedule 30.4_2028 Interim Tariff Sheet_20240816 Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2024-08-16 2024-08-16
EB-2023-0195 document icon THESL_Settlement Proposal_Schedule 30.3_2027 Interim Tariff Sheet_20240816 Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2024-08-16 2024-08-16
EB-2023-0195 document icon THESL_Settlement Proposal_Schedule 30.2_2026 Interim Tariff Sheet_20240816 Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2024-08-16 2024-08-16
EB-2023-0195 document icon THESL_Settlement Proposal_Schedule 30.1_2025 Tariff Sheet_20240816 Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2024-08-16 2024-08-16
EB-2023-0195 document icon THESL_Settlement Proposal_Schedule 29_OEB Appendix 2-W Bill Impacts_20240816 Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2024-08-16 2024-08-16
EB-2023-0195 document icon THESL_Settlement Proposal_Schedule 28_OEB Appendix 2-R Lost Adjustment Factors _20240816 Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2024-08-16 2024-08-16
EB-2023-0195 document icon THESL_Settlement Proposal_Schedule 27.2_2026-2029 Alloc Fixed-Variable Rates_20240816 Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2024-08-16 2024-08-16
EB-2023-0195 document icon THESL_Settlement Proposal_Schedule 27.1_2025 Alloc Fixed-Variable Rates_20240816 Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2024-08-16 2024-08-16
EB-2023-0195 document icon THESL_Settlement Proposal_Schedule 26_Cost Allocation Model_20240816 Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2024-08-16 2024-08-16
EB-2023-0195 document icon THESL_Settlement Proposal_Schedule 25_Updated 3-VECC-53 Appendix A_20240816 Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2024-08-16 2024-08-16
EB-2023-0195 document icon THESL_Settlement Proposal_Schedule 24_OEB Appendix 2-IB Customer-Load Forecast_20240816 Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2024-08-16 2024-08-16
EB-2023-0195 document icon THESL_Settlement Proposal_Schedule 23_Retail Transmission Service Rates _20240816 Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2024-08-16 2024-08-16
EB-2023-0195 document icon THESL_Settlement Proposal_Schedule 22_GA Analysis Workform_20240816 Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2024-08-16 2024-08-16
EB-2023-0195 document icon THESL_Settlement Proposal_Schedule 21.2_Group 2 Rate Riders_20240816 Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2024-08-16 2024-08-16
EB-2023-0195 document icon THESL_Settlement Proposal_Schedule 21.1_DVA Continuity Schedule and Group 1 Rate Riders__20240816 Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2024-08-16 2024-08-16
EB-2023-0195 document icon THESL_Settlement Proposal_Schedule 20_OEB Appendix 2-H_20240816 Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2024-08-16 2024-08-16
EB-2023-0195 document icon THESL_Settlement Proposal_Schedule 19_PILs Model - Income Tax Workform_20240816 Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2024-08-16 2024-08-16
EB-2023-0195 document icon THESL_Settlement Proposal_Schedule 18_OEB Appendix 2-OA-OB_Cost of Capital_20240816 Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2024-08-16 2024-08-16
EB-2023-0195 document icon THESL_Settlement Proposal_Schedule 17_OEB Appendix 2-K_20240816 Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2024-08-16 2024-08-16
EB-2023-0195 document icon THESL_Settlement Proposal_Schedule 16_OEB Appendix 2-N_20240816 Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2024-08-16 2024-08-16
EB-2023-0195 document icon THESL_Settlement Proposal_Schedule 15_OEB Appendix 2-M_20240816 Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2024-08-16 2024-08-16
EB-2023-0195 document icon THESL_Settlement Proposal_Schedule 14_OEB Appendices 2_JA-JB-JC-D-L_20240816 Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2024-08-16 2024-08-16
EB-2023-0195 document icon THESL_Settlement Proposal_Schedule 13_OEB Appendix 2-G - ESQR and Reliability_20240816 Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2024-08-16 2024-08-16
EB-2023-0195 document icon THESL_Settlement Proposal_Schedule 12_2B-SEC-60_CAPEX to ISA_20240816 Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2024-08-16 2024-08-16
EB-2023-0195 document icon THESL_Settlement Proposal_Schedule 11_ISA by Program_20240816 Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2024-08-16 2024-08-16
EB-2023-0195 document icon THESL_Settlement Proposal_Schedule 10.2_OEB Appendix 2-AB_20240816.XLSX Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2024-08-16 2024-08-16
EB-2023-0195 document icon THESL_Settlement Proposal_Schedule 10.1_OEB Appendix 2-AA_Program Summary_20240816 Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2024-08-16 2024-08-16
EB-2023-0195 document icon THESL_Settlement Proposal_Schedule 9.5-9.6_OEBAppendices 2-FA_FB - HONI_20240816 Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2024-08-16 2024-08-16
EB-2023-0195 document icon THESL_Settlement Proposal_Schedule 9.3-9.4_OEBAppendices 2-FA_FB - ES_20240816 Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2024-08-16 2024-08-16
EB-2023-0195 document icon THESL_Settlement Proposal_Schedule 9.1-9.2_OEBAppendices 2-FA_FB - GPMC_20240816 Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2024-08-16 2024-08-16
EB-2023-0195 document icon THESL_Settlement Proposal_Schedule 8_OEB Appendix 2-D_20240816 Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2024-08-16 2024-08-16
EB-2023-0195 document icon THESL_Settlement Proposal_Schedule 7_OEB Appendix 2-ZA_ZB_20240816 Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2024-08-16 2024-08-16
EB-2023-0195 document icon THESL_Settlement Proposal_Schedule 6.1_Summary of Depreciation Expense_20240816 Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2024-08-16 2024-08-16
EB-2023-0195 document icon THESL_Settlement Proposal_Schedule 5_OEB Appendix 2-C Depreciation and Amortization Expense_20240816 Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2024-08-16 2024-08-16
EB-2023-0195 document icon THESL_Settlement Proposal_Schedule 4_OEB Appendix 2-BB - Useful Life Comparison_20240816 Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2024-08-16 2024-08-16
EB-2023-0195 document icon THESL_Settlement Proposal_Schedule 3_JT4.38_App A - Monthly Rate Base_20240816 Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2024-08-16 2024-08-16
EB-2023-0195 document icon THESL_Settlement Proposal_Schedule 2_OEB Appendix 2-BA_20240816 Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2024-08-16 2024-08-16
EB-2023-0195 document icon THESL_Settlement Proposal_Schedule 1.5_2029 Rev Reqt Work form_20240816 Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2024-08-16 2024-08-16
EB-2023-0195 document icon THESL_Settlement Proposal_Schedule 1.4_2028 Rev Reqt Work form_20240816 Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2024-08-16 2024-08-16
EB-2023-0195 document icon THESL_Settlement Proposal_Schedule 1.3_2027 Rev Reqt Work form_20240816.xlsm Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2024-08-16 2024-08-16
EB-2023-0195 document icon THESL_Settlement Proposal_Schedule 1.2_2026 Rev Reqt Work form_20240816 Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2024-08-16 2024-08-16
EB-2023-0195 document icon THESL_Settlement Proposal_Schedule 1.1_2025 Rev Reqt Work form_20240816 Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2024-08-16 2024-08-16
EB-2023-0195 document icon DRC_Req_Expert Evidence_20240705 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-07-05 2024-07-05
EB-2023-0195 document icon OEBStaff_Ltr_re Settlement_Conf_5_20240704_signed Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-07-04 2024-07-04
EB-2023-0195 document icon REVISED_Transcript_Evidence Presentation May 22 2024_20240624 Transcripts Toronto Hydro-Electric System Limited - Electricity Distributor 2024-06-24 2024-06-24
EB-2023-0195 document icon OEBStaff_Ltr_Settlement_Conf_4_20240613_signed Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-06-13 2024-06-13
EB-2023-0195 document icon OEBltr_Settlement_Conference_20240610_signed Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-06-10 2024-06-10
EB-2023-0195 document icon OEBStaff_Ltr_Settlement_Conference_Progress_3_20240607_signed Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-06-07 2024-06-07
EB-2023-0195 document icon OEBStaff_Ltr_Settlement_Conference_Progress_2_20240505_signed Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-06-06 2024-06-06
EB-2023-0195 document icon po6_THESL COS 2025-2029_Reply_Reports_20240531_signed Procedural Order Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-31 2024-05-31
EB-2023-0195 document icon OEBltr_Settlement_Conference_20230531_signed Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-31 2024-05-31
EB-2023-0195 document icon OEBStaff_Ltr_Settlement_Conference_Progress_20240531_signed Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-31 2024-05-31
EB-2023-0195 document icon THESL_Clearspring Reply Report re PEG _20240527 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-27 2024-05-27
EB-2023-0195 document icon THESL_Reply Ltr_to OEB_re reply evidence_20240529 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-29 2024-05-29
EB-2023-0195 document icon OEBltr_Re Reply_Evidence_20240527_signed Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-27 2024-05-27
EB-2023-0195 document icon THESL_Letter to the OEB_20240524 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-27 2024-05-27
EB-2023-0195 document icon THESL_ScottMadden Reply Report_20240524 Submission Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-27 2024-05-27
EB-2023-0195 document icon BOMA_M2-TH-012-1_20240523 Interrogatory Response from Intervenor Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-23 2024-05-23
EB-2023-0195 document icon BOMA_M2-TH-011-1_20240523 Interrogatory Response from Intervenor Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-23 2024-05-23
EB-2023-0195 document icon BOMA_M2-TH-010-1_20240523 Interrogatory Response from Intervenor Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-23 2024-05-23
EB-2023-0195 document icon BOMA_M2-TH-007-2_20240523 Interrogatory Response from Intervenor Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-23 2024-05-23
EB-2023-0195 document icon BOMA_M2-TH-007-1_20240523 Interrogatory Response from Intervenor Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-23 2024-05-23
EB-2023-0195 document icon BOMA_M2-CCMBC-3-1_20240523 Interrogatory Response from Intervenor Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-23 2024-05-23
EB-2023-0195 document icon BOMA_IRR_M2_20240523 Interrogatory Response from Intervenor Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-23 2024-05-23
EB-2023-0195 document icon BOMA_cvrltr_IRR_M2_20240523 Interrogatory Response from Intervenor Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-23 2024-05-23
EB-2023-0195 document icon THESL_2025-2029 Rate Application_Evidence Presentation UT and Transcript Corrections_20240523 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-23 2024-05-23
EB-2023-0195 document icon IRR_Attachment N3-TH-1b_20230523 Interrogatory Response from Intervenor Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-23 2024-05-23
EB-2023-0195 document icon PEG_N3_IR_Responses_Clearspring_20240523 Interrogatory Response from Intervenor Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-23 2024-05-23
EB-2023-0195 document icon IRR_Attachment N3-TH-16d PSE Variable_20240523 Interrogatory Response from Intervenor Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-23 2024-05-23
EB-2023-0195 document icon IRR_Attachment N3-TH-1a PEG Table_20240523 Interrogatory Response from Intervenor Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-23 2024-05-23
EB-2023-0195 document icon IRRs_Attachment N3-SEC-15a_20240523 Interrogatory Response from Intervenor Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-23 2024-05-23
EB-2023-0195 document icon Staff_IRR_PEG_Clearspring_CvrLtr_20240523_signed Interrogatory Response from Intervenor Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-23 2024-05-23
EB-2023-0195 document icon Evidence presentation_Exhibits List_ THESL_20230522 Exhibit List Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-23 2024-05-23
EB-2023-0195 document icon THESL_Exhibits KP1.1 and KP1.2_Evidence Overview Presentation_20240522 Exhibits Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-22 2024-05-22
EB-2023-0195 document icon THESL_cvrltr_Evidence Overview Presentation_20240522 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-22 2024-05-22
EB-2023-0195 document icon Transcript_THESL_Evidence Presentation_20240522 Transcripts Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-22 2024-05-22
EB-2023-0195 document icon IRR_Attachment N1-VECC-2 Interrogatory Response from Intervenor Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-17 2024-05-17
EB-2023-0195 document icon IRR_Attachment N1-TH-3 Interrogatory Response from Intervenor Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-17 2024-05-17
EB-2023-0195 document icon IRR_Attachment N1-SEC-11d Interrogatory Response from Intervenor Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-17 2024-05-17
EB-2023-0195 document icon IRR_Attachment N1-SEC-11c Interrogatory Response from Intervenor Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-17 2024-05-17
EB-2023-0195 document icon IRR_Attachment N1-SEC-8 Interrogatory Response from Intervenor Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-17 2024-05-17
EB-2023-0195 document icon IRR_Attachment N1-SEC-5 TEJ Article Interrogatory Response from Intervenor Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-17 2024-05-17
EB-2023-0195 document icon IRR_Attachment N1-PP-6-4 Interrogatory Response from Intervenor Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-17 2024-05-17
EB-2023-0195 document icon IRR_Attachment N1-PP-6-3 Interrogatory Response from Intervenor Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-17 2024-05-17
EB-2023-0195 document icon IRR_Attachment N1-PP-6-1 Interrogatory Response from Intervenor Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-17 2024-05-17
EB-2023-0195 document icon IRR_Attachment N1-EP-5 Rev Decoupling Table Interrogatory Response from Intervenor Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-17 2024-05-17
EB-2023-0195 document icon IRR_Attachment N1-EP-3 MRP Table_20240517 Interrogatory Response from Intervenor Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-17 2024-05-17
EB-2023-0195 document icon PEG_N1_IRR Framework_20240517 Interrogatory Response from Intervenor Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-17 2024-05-17
EB-2023-0195 document icon Staff_cvrltr_IRR_PEGFramework_EP-1_TH-1_signed Interrogatory Response from Intervenor Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-17 2024-05-17
EB-2023-0195 document icon PollutionProbe_IR_M3_PEG-Clearspring_20240516 Interrogatories to Intervenor Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-16 2024-05-16
EB-2023-0195 document icon THESL_2025-2029 Rate Application_IRs_OEBStaff-PEG_20240515 Interrogatories to Intervenor Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-15 2024-05-15
EB-2023-0195 document icon BOMA_IRR_extension_request_20240514 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-14 2024-05-14
EB-2023-0195 document icon TC Exhibits_Undertakings_list_THESL_20240513 Undertaking List; Exhibit List Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-13 2024-05-13
EB-2023-0195 document icon OEB ltr_Virtual SC_THESL_20240510_signed Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-10 2024-05-10
EB-2023-0195 document icon JT5.13 & JT5.14_THESL_TC_UndertakingResp_Updated_20240507 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-07 2024-05-07
EB-2023-0195 document icon JT5.10_THESL_TC_UndertakingResp_Updated_20240507 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-07 2024-05-07
EB-2023-0195 document icon JT4.31_THESL_TC_UndertakingResp_updated_20240507 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-07 2024-05-07
EB-2023-0195 document icon THESL_JT3.18_Undertaking Updates_20240507 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-07 2024-05-07
EB-2023-0195 document icon THESL_IRs_PEG and Enerlife_20240509 Interrogatories to Intervenor Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-09 2024-05-09
EB-2023-0195 document icon ED_IRsOnM1_to Bd Staff_20240509 Interrogatories to Intervenor Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-09 2024-05-09
EB-2023-0195 document icon VECC_IRs_THESL0195_PEG_M1_20240509 Interrogatories to Intervenor Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-09 2024-05-09
EB-2023-0195 document icon SEC_IR_StaffEvidence_THESL_20250509 Interrogatories to Intervenor Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-09 2024-05-09
EB-2023-0195 document icon Energy Probe_IR_PEG_20240509 Interrogatories to Intervenor Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-09 2024-05-09
EB-2023-0195 document icon CCMBC_IR_BOMA_20240509 Interrogatories to Intervenor Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-09 2024-05-09
EB-2023-0195 document icon VECC_IRs_THESL0195_BOMA_M2_20240509 Interrogatories to Intervenor Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-09 2024-05-09
EB-2023-0195 document icon PollutionProbe_IR_M2_Enerlife-BOMA_20240509 Interrogatories to Intervenor Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-09 2024-05-09
EB-2023-0195 document icon PollutionProbe_IR_M1_PEG_20240509 Interrogatories to Intervenor Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-09 2024-05-09
EB-2023-0195 document icon THESL_JT5.14_AppA_GA Analysis Workform_Updated_20240507 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-07 2024-05-07
EB-2023-0195 document icon THESL_JT5.13_App C - DVA Continuity-Rate Riders Reconciliation_20240507 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-07 2024-05-07
EB-2023-0195 document icon THESL_JT5.13_App A - DVA Continuity Schedule_Updated_20240507 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-07 2024-05-07
EB-2023-0195 document icon THESL_2B-SEC-57_App A_20240507 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-07 2024-05-07
EB-2023-0195 document icon THESL_IRR Exhibit 5_Updated_20240507 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-07 2024-05-07
EB-2023-0195 document icon THESL_IRR Exhibit 4_Updated_20240507 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-07 2024-05-07
EB-2023-0195 document icon THESL_IRR Exhibit 2B_Part3of3_Updated_20240507 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-07 2024-05-07
EB-2023-0195 document icon THESL_Consolidated IR and Undertaking Updates_20240507 Application and Evidence; Interrogatory Response from Applicant; Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-08 2024-05-08
EB-2023-0195 document icon cvrLtr_THESL_2025-2029 Rate Application_Evidence Updates_20240507 Correspondence; Application and Evidence; Undertaking List Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-08 2024-05-08
EB-2023-0195 document icon THESL_OEB_D&U_EE_20240506 Declaration and Undertakings Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-06 2024-05-06
EB-2023-0195 document icon Staff_CvrLtr_PEG_Clearspring_Report 20240506_signed Submission Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-06 2024-05-06
EB-2023-0195 document icon PEG Clearspring Report_20240506 Submission Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-06 2024-05-06
EB-2023-0195 document icon THESL_Clearspring_D&U_SF_20240506 Declaration and Undertakings Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-06 2024-05-06
EB-2023-0195 document icon BOMA_Expert Evidence_20240502 Intervenor Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-02 2024-05-02
EB-2023-0195 document icon PEG Framework Report AttachB Form-A_20240502 Submission Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-02 2024-05-02
EB-2023-0195 document icon PEG Framework Report AttachA MNL CV_20240502 Submission Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-02 2024-05-02
EB-2023-0195 document icon PEG Framework Report_20240502 Submission Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-02 2024-05-02
EB-2023-0195 document icon Staff_CvrLtr_PEG_Framework_Report 20240502 signed Correspondence; Submission Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-02 2024-05-02
EB-2023-0195 document icon po5_THESL COS 2025-2029_20240502_eSigned Procedural Order Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-02 2024-05-02
EB-2023-0195 document icon THESL_2025-2029 Rate Application_Letter re PEG Evidence Extension Request_20240502 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-02 2024-05-02
EB-2023-0195 document icon OEB Staff_PEG_Evidence_Extension_Request 20240501_signed Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-05-01 2024-05-01
EB-2023-0195 document icon THESL_LTR_resolution of the Motion_20240430 Motion; Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-30 2024-04-30
EB-2023-0195 document icon OEB Ltr_IESO_Late Intervention_20240119_signed Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-01-19 2024-01-19
EB-2023-0195 document icon Transcript_TC1_rv3_April 08 2024_20240426 Transcripts Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-26 2024-04-26
EB-2023-0195 document icon Transcript_TC4_rv4_April 11 2024_20240426 Transcripts Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-26 2024-04-26
EB-2023-0195 document icon Transcript_TC2_rv3_April 09 2024_20240426 Transcripts Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-26 2024-04-26
EB-2023-0195 document icon Transcript_TC5_rv1_ April 12 2024_20240426 Transcripts Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-26 2024-04-26
EB-2023-0195 document icon AMPCO_Motion_THESL_20240425 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-25 2024-04-25
EB-2023-0195 document icon SEC_Motion_Ltr_THESL_20240425 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-25 2024-04-25
EB-2023-0195 document icon LoC_GeorgeM _20240424_Redacted Letter of Comment Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-24 2024-04-24
EB-2023-0195 document icon po4_THESL_COS 2025-2029_20240423_signed Procedural Order Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-23 2024-04-23
EB-2023-0195 document icon THESL_JT5.19_App A_CSMUR Unit Calculations - Revenue Forecast_20240422 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-22 2024-04-22
EB-2023-0195 document icon THESL_JT5.16_AppA_BCA Calculator - CCA Sensitivity_20240422 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-22 2024-04-22
EB-2023-0195 document icon THESL_JT5.15_App A_BCA Calculator_20240422 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-22 2024-04-22
EB-2023-0195 document icon THESL_JT5.14_AppA_GA Analysis Workform_Updated_20240422 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-22 2024-04-22
EB-2023-0195 document icon THESL_JT5.13_App B_9_T03_S01_Rate Rider Table_Updated_20240422 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-22 2024-04-22
EB-2023-0195 document icon THESL_JT5.13_App A_9_T02_S01_DVA Continuity Schedule_Updated_20240422 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-22 2024-04-22
EB-2023-0195 document icon THESL_JT5.3_App A Standard Deviation Calculations_20240422 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-22 2024-04-22
EB-2023-0195 document icon THESL_JT4.38_App A - Monthly Averages Calc_20240422 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-22 2024-04-22
EB-2023-0195 document icon THESL_JT4.37_App A OEB App_2JA-JC - 2018 and 2019 Actual_20240422 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-22 2024-04-22
EB-2023-0195 document icon THESL_JT4.35_App A_Example of Weather-Normalized Calculation_20240422 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-22 2024-04-22
EB-2023-0195 document icon THESL_JT4.27_App A_20240422 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-22 2024-04-22
EB-2023-0195 document icon THESL_JT4.25_App A_2025 NCP and CP_Application Update_20240422 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-22 2024-04-22
EB-2023-0195 document icon THESL_JT4.1 to 4.41_TC_UndertakingResp_Day4of5_Consolidated_20240422 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-22 2024-04-22
EB-2023-0195 document icon THESL_JT4.15_App A_OEB Appendix 2-AA_ISAs_20240422 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-22 2024-04-22
EB-2023-0195 document icon THESL_JT4.8_App A_20240422 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-22 2024-04-22
EB-2023-0195 document icon THESL_JT4.6 App A -3-SEC-79 App Revision - Distribution kWh_20240422 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-22 2024-04-22
EB-2023-0195 document icon THESL_JT3.45_App A_20240422 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-22 2024-04-22
EB-2023-0195 document icon THESL_JT3.26_App A_20240422 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-22 2024-04-22
EB-2023-0195 document icon THESL_JT3.4_App A_Program Unit Costs_20240422 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-22 2024-04-22
EB-2023-0195 document icon THESL_JT2.24_App A - OEBAppendices 2-FA, FB - GPMC_20240422 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-22 2024-04-22
EB-2023-0195 document icon THESL_JT2.18_AppA_TH NWA_OEB_Draft_BCA Framework_20240422 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-22 2024-04-22
EB-2023-0195 document icon THESL_JT1.13_App B Revised 2B-AMPCO-42 App A_20240422 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-22 2024-04-22
EB-2023-0195 document icon THESL_JT1.13_App A 2025-2029 Forecast Units_20240422 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-22 2024-04-22
EB-2023-0195 document icon THESL_JT1.1.6_App A Customer Data_20240422 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-22 2024-04-22
EB-2023-0195 document icon THESL_Exhibit 1B - Application Overview_Updated_20240422 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-22 2024-04-22
EB-2023-0195 document icon THESL_JT5.1 to 5.44_TC_UndertakingResp_Day5of5_Consolidated_20240422 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-22 2024-04-22
EB-2023-0195 document icon THESL_8_T06_S01_OEB Appendix 2-W - Bill Impacts_Updated_20240422 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-22 2024-04-22
EB-2023-0195 document icon THESL_7_T01_S03_Cost Allocation Model_Updated_20240422 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-22 2024-04-22
EB-2023-0195 document icon THESL_6_T01_S06_2029 Rev Reqt Work Form_Updated_20240422 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-22 2024-04-22
EB-2023-0195 document icon THESL_6_T01_S05_2028 Rev Reqt Work Form_Updated_20240422 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-22 2024-04-22
EB-2023-0195 document icon THESL_6_T01_S04_2027 Rev Reqt Work Form_Updated_20240422 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-22 2024-04-22
EB-2023-0195 document icon THESL_6_T01_S03_2026 Rev Reqt Work Form_Updated_20240422 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-22 2024-04-22
EB-2023-0195 document icon THESL_6_T01_S02_2025 Rev Reqt Work Form_Updated_20240422 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-22 2024-04-22
EB-2023-0195 document icon THESL_JT3.1 to 3.42_TC_UndertakingResp_Day3of5_Consolidated_20240422 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-22 2024-04-22
EB-2023-0195 document icon THESL_JT2.1 to 2.27_TC_UndertakingResp_Day2of5_Consolidated_20240422 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-22 2024-04-22
EB-2023-0195 document icon THESL_JT1.1 to 1.22_TC_UndertakingResp_Day1of5_Consolidated_20240422 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-22 2024-04-22
EB-2023-0195 document icon THESL_TC UTs_Confidentiality_CoverLetter_TableofConcordance_20240422 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-22 2024-04-22
EB-2023-0195 document icon THESL_2025-2029 Rate Application_TC Undertaking Responses and Evidence Update_20240422 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-22 2024-04-22
EB-2023-0195 document icon THESL _TC Day 5 Transcript Corrections _20240418 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-18 2024-04-18
EB-2023-0195 document icon JT4.27_THESL_TC_Undertaking Resp_App A_20240418 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-18 2024-04-18
EB-2023-0195 document icon JT4.25_THESL_TC_underdakingResp_App A- 2025 NCP and CP_Application Update_20240418 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-18 2024-04-18
EB-2023-0195 document icon JT4.24_to JT5.41_THESL_TC_UndertakingResp_Consolidated_20240418 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-18 2024-04-18
EB-2023-0195 document icon THESL_cvrltr_TC_UTResponses_OEB Staff JT5.20-JT5.30_JT5.32-JT5.41_BOMA JT4.24_JT4.2 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-18 2024-04-18
EB-2023-0195 document icon K1.1_VECC_TC_questiosn_20240402 Exhibits Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-02 2024-04-02
EB-2023-0195 document icon Transcript for TC3_rv1_April 10 2024_20240410 Transcripts Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-12 2024-04-12
EB-2023-0195 document icon THESL_2025-2029 Rate Application_TC Day 2 Transcript Corrections _20240410 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-11 2024-04-11
EB-2023-0195 document icon THESL_2025-2029 Rate Application_TC Day 4 Transcript Corrections _20240412 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-12 2024-04-12
EB-2023-0195 document icon THESL_2025-2029 Rate Application_TC Day 3 Transcript Corrections _20240411 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-11 2024-04-11
EB-2023-0195 document icon THESL_2025-2029 Rate Application_TC Day 1 Transcript Corrections _20240409 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-09 2024-04-09
EB-2023-0195 document icon OEBLtr_Virtual Panel 4_20240405_signed Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-05 2024-04-05
EB-2023-0195 document icon THESL_IRR_Confidentiality_Table of Concordance Correction_CoverLetter_20240404 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-04 2024-04-04
EB-2023-0195 document icon THESL_IRR_ by Witness Panel_20240328 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-28 2024-03-28
EB-2023-0195 document icon THESL_IRR Exhibit 9 Staff_Updated_20240403 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-03 2024-04-03
EB-2023-0195 document icon THESL_2025-2029 Rate Application_Updated 9-SEC-131_20240403 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-04 2024-04-04
EB-2023-0195 document icon THESL_2025-2029 Rate Application_Letter re Virtual Panel 4_20240403 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-03 2024-04-03
EB-2023-0195 document icon DRC_D&U_THESL_ND_20240403 Declaration and Undertakings Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-03 2024-04-03
EB-2023-0195 document icon CCC_TC_Time Estimates_20240403 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-03 2024-04-03
EB-2023-0195 document icon AMPCO_LTR_TC_Timeline_20240402 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-03 2024-04-03
EB-2023-0195 document icon THESL_4-AMPCO-84 App A_Updated_20240402 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-02 2024-04-02
EB-2023-0195 document icon THESL_9_T02_S03_App S - Retrofit Projects (Jun2023-Dec2023)_20240402 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-02 2024-04-02
EB-2023-0195 document icon THESL_9_T02_S03_App R - Non-Retrofit Projects (Jun2023-Dec2023)_20240402 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-02 2024-04-02
EB-2023-0195 document icon THESL_9_T02_S03_App A - 2020-2024_LRAMVA_Final_20240402 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-02 2024-04-02
EB-2023-0195 document icon THESL_9_T02_S01__DVA Continuity Schedule_Updated_20240402 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-02 2024-04-02
EB-2023-0195 document icon THESL_6_T02_S02_2025_Income_Tax_PILs_Update 20240402 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-02 2024-04-02
EB-2023-0195 document icon THESL_6_T01_S04 - Rev_Reqt_Work_Form 2027_20240402 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-02 2024-04-02
EB-2023-0195 document icon THESL_6_T01_S06 - Rev_Reqt_Work_Form 2029_20240402 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-02 2024-04-02
EB-2023-0195 document icon THESL_6_T01_S05 - Rev_Reqt_Work_Form 2028_20240402 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-02 2024-04-02
EB-2023-0195 document icon THESL_6_T01_S03 - Rev_Reqt_Work_Form 2026_20240402 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-02 2024-04-02
EB-2023-0195 document icon THESL_6_T01_S02 - Rev_Reqt_Work_Form 2025_20240402 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-02 2024-04-02
EB-2023-0195 document icon THESL_3_T01_S02 - OEB Appendix 2-IB - Load_Forecast_Analysis_20240402 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-02 2024-04-02
EB-2023-0195 document icon THESL_3_T01_S01_AppI - Regression Model Statistics - Customers_20240402 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-02 2024-04-02
EB-2023-0195 document icon THESL_3_T01_S01_AppH - Regression Model Input Data - Customers_20240402 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-02 2024-04-02
EB-2023-0195 document icon THESL_3_T01_S01_AppE - Extrapolation Method 2019-2020 and 2021-2024 Prov Frameworks_20240402 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-02 2024-04-02
EB-2023-0195 document icon THESL_3_T01_S01_AppD - 2015-2022 Post-CFF historical savings_20240402 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-02 2024-04-02
EB-2023-0195 document icon THESL_3_T01_S01_AppC - CDM Variables_20240402 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-02 2024-04-02
EB-2023-0195 document icon THESL_3_T01_S01_AppB - Regression Model Statistics_20240402 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-02 2024-04-02
EB-2023-0195 document icon THESL_3_T01_S01_AppA - Regression Model Input Data_20240402 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-02 2024-04-02
EB-2023-0195 document icon THESL_2B_E4_AppB - OEB Appendix 2-AA_Program Summary_20240402 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-02 2024-04-02
EB-2023-0195 document icon THESL_2B_E4_AppA - OEB Appendix 2-AB_20240402 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-02 2024-04-02
EB-2023-0195 document icon THESL_2A_T02_S01_AppB-Appendix 2C - Depreciation and Amortization Expense_20240402 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-02 2024-04-02
EB-2023-0195 document icon THESL_2A_T01_S02 - OEB Appendix 2-BA_20240402 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-02 2024-04-02
EB-2023-0195 document icon THESL_2025-2029 Rate Application_Evidence Update_20240402 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-02 2024-04-02
EB-2023-0195 document icon ED_Ltr_TC_Topics and Time estimates_20240402 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-02 2024-04-02
EB-2023-0195 document icon VECC_TC_Topics and TimeEstimates_20240402 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-02 2024-04-02
EB-2023-0195 document icon DRC_TC_Topics and Time Estimates_20240402 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-02 2024-04-02
EB-2023-0195 document icon Staff_Ltr_TC_Time Estimates_20240402_signed Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-02 2024-04-02
EB-2023-0195 document icon Inerlife_TC Time Estimate_20240402 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-02 2024-04-02
EB-2023-0195 document icon BOMA_TC Time Estimate_20240402 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-02 2024-04-02
EB-2023-0195 document icon SEC_TC_Topics_TimeEstimates_20240402 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-02 2024-04-02
EB-2023-0195 document icon CCMBC_TC_topics_TimeEstimates_20240402 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-02 2024-04-02
EB-2023-0195 document icon Energy Probe_TC_Topics_TimeEstimate_20240402 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-02 2024-04-02
EB-2023-0195 document icon PollutionProbe_Ltr_TC_TimeEstimate_20240402 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-02 2024-04-02
EB-2023-0195 document icon PWU’s_TC_TimeEstimate_20240402 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-04-02 2024-04-02
EB-2023-0195 document icon THESL_ltr_2025-2029 Rate Application_Redaction of Non Relevant Info_20240327 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-28 2024-03-28
EB-2023-0195 document icon OEBltr_Hybrid Tech Conf_THESL_20240327_signed Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-27 2024-03-27
EB-2023-0195 document icon THESL_IRR Exhibit 2B_Part1.5of3_Updated_20240326 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-26 2024-03-26
EB-2023-0195 document icon THESL_IRR Exhibit 2B_Part1.0of3_Updated_20240326 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-26 2024-03-26
EB-2023-0195 document icon THESL_IRR Exhibit 1B_Part2of2_Updated_20240326 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-26 2024-03-26
EB-2023-0195 document icon THESL_IRR Exhibit 1B_Part2of2_Updated_20240322 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-22 2024-03-22
EB-2023-0195 document icon THESL_IRR Exhibit 1B_Part2.1of2_Updated_20240321 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-21 2024-03-21
EB-2023-0195 document icon THESL_IRR Exhibit 5_Updated_20240321 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-21 2024-03-21
EB-2023-0195 document icon THESL_IRR Exhibit 4_Updated_20240321 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-21 2024-03-21
EB-2023-0195 document icon THESL_IRR Exhibit 2B_Part3of3_Updated_20240321 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-21 2024-03-21
EB-2023-0195 document icon THESL_IRR Exhibit 2B_Part1of3_Updated_20240321 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-21 2024-03-21
EB-2023-0195 document icon THESL_IRR Exhibit 1A_Updated_20240321 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-21 2024-03-21
EB-2023-0195 document icon THESL_2025-2029 Rate Application_IRR Update_Cover Letter_20240321 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-21 2024-03-21
EB-2023-0195 document icon OEBltr_Redaction Request_THESL_20240321_signed Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-21 2024-03-21
EB-2023-0195 document icon LoC_Anne Peiris_20231211_redacted Letter of Comment Toronto Hydro-Electric System Limited - Electricity Distributor 2023-12-11 2023-12-11
EB-2023-0195 document icon THESL_2025-2029 Rate Application_Ltr Request for Hybrid Hearings_20240321 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-21 2024-03-21
EB-2023-0195 document icon THESL_9-Staff-354_App B_20240319 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-19 2024-03-19
EB-2023-0195 document icon THESL_9-Staff-354_App A - 2017 Persistence_20240319 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-19 2024-03-19
EB-2023-0195 document icon THESL_9-Staff-349-App A_DVA Continuity Schedule_20240319 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-19 2024-03-19
EB-2023-0195 document icon THESL_6-Staff-320 App A_6_T02_S02_2025 Income Tax PILs_2023 Hist_2024 Bridge Update_20240319 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-19 2024-03-19
EB-2023-0195 document icon THESL_4-Staff-310_App A - OEB Appendix 2-N_20240319 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-19 2024-03-19
EB-2023-0195 document icon THESL_3-VECC -24_App A_20240319 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-19 2024-03-19
EB-2023-0195 document icon THESL_2A-Staff-116_App A_20240319 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-19 2024-03-19
EB-2023-0195 document icon THESL_1B-SEC-28_App B Unit Cost Survey Year Breakdown_20240319 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-19 2024-03-19
EB-2023-0195 document icon THESL_1B-SEC-28_App A_Unit Cost Survey_20240319 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-19 2024-03-19
EB-2023-0195 document icon THESL_1B-SEC-1_App C - OEB Appendix 2-H_20240319 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-19 2024-03-19
EB-2023-0195 document icon THESL_1B-SEC-1_App B - OEB Appendix 2-BA_20240319 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-19 2024-03-19
EB-2023-0195 document icon THESL_1B-SEC-1_App A - 2020-2024 In-Service Additions by Investment Category_20240319 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-19 2024-03-19
EB-2023-0195 document icon THESL_2025-2029 Rate Application_IRR Appendices_Letter_20240319 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-19 2024-03-19
EB-2023-0195 document icon THESL_2025-2029 Rate Application_Redaction of Non-Relevant Information_20240314 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-14 2024-03-14
EB-2023-0195 document icon THESL_2025-2029 Rate Application_IR_Responses_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-12 2024-03-12
EB-2023-0195 document icon THESL_2B-AMPCO-36_App A - Failures_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_2B-SEC-44_App A - ACA With Investment_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_2B-AMPCO-66_App A - 2020-2029 Decommissioned Fleet_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_2B-Staff-148_App A - Station Capacity Constraints_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_1B-Staff-09_Appendix A_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_1B-ED-3_App A_List of Work Centre Fossil Fuel Heating Equipment_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_1B-Staff-09_App A_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_1B-Staff-49_App A - BCA Calculator_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_1B-VECC-9_App A - Contact Centre Report 2022 Q4_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_1B-VECC-9_App B - Contact Centre Report 2023 Q4_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_2A-Staff-104_App A_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_2A-Staff-104_App B_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_2A-Staff-109_App B - 2A_T06_S02,3 - OEBAppendices 2-FA, FB - GPMC_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_2A-Staff-109_App C_2A_T06_S02,3_OEBAppendices 2-FA, FB - HONI_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_2A-Staff-109_App D_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_2B-AMPCO-24_App A_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_2B-AMPCO-38_App A - Deficiencies_20240311.xlsx Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_2B-AMPCO-42_App A_Forecast and Actual Units_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_2B-SEC-65_App A - ACA Information_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_2B-AMPCO-43_App A_20240311.xlsx Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_2B-SEC-46_App A - Data Source for D4 - Fig4_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_2B-SEC-60_App A_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_2B-SEC-67_App A - ACA Information_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_2B-SEC-68_App A - ACA Data_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_2B-SEC-76_App A - 2018-2029 Utilization_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_2B-Staff-117_App A - Appendix 2-BA_2019_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_2B-Staff-118_App A_OEB Appendix 2-D_Updated_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_2B-Staff-119_App A - Depreciation Variance_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_2B-SEC-70_App A_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_2B-SEC-66_App A_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_2B-SEC-46_App A - Data Source for D4 - Fig3 and 5_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_1B-Staff-91_App A - SAIFI Defective Equipment Tabular data_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_2B-Staff-131_App A - ACA Demographics and Useful Lives_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_2A-Staff-109_AppA 2A_T06_S02,3_OEBAppendices 2-FA, FB - ES_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_IRR Exhibit 2A_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_IRR Exhibit 9_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_IRR Exhibit 8_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_IRR Exhibit 7_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_IRR Exhibit 6_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_IRR Exhibit 5_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_IRR Exhibit 4_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_IRR Exhibit 3_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_IRR Exhibit 2B_Part3of3_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_IRR Exhibit 2B_Part2of3_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_IRR Exhibit 2B_Part1of3_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_IRR Exhibit 1B_Part1of2_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_IRR Exhibit 1A_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_2025-2029 Rate Application_IRR_Confidentiality_Request_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_2025-2029 Rate Application_IR_Responses_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_9-Staff-355_App D_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_9-Staff-355_App C_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_9-Staff-355_App A_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_8-Staff-333_App A_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_8-SEC-125_App A - 2021-2029 Distribution Charges_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_7-VECC-90_App C - Cost Allocation Model_Buildings_Secondary_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_7-VECC-90_App B - Cost Allocation Model_Secondary_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_7-VECC-90_App A - Cost Allocation Model_Buldings_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_7-Staff-326_App A - 2019 and 2025 Load Profiles_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_6-Staff-320_App A - 2025 Income Tax PILs_2023_2024 Update_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_5-Staff-313_App A - OEB Appendix OA-OB_Updated_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_4-Staff-295_App A - 2024 Cost Allocation Model_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_4-SEC-110_App A - 2-M_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_4-SEC-89_App A OEB APP2_JA-JB-JC-D-L_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_4-AMPCO-84_App A_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_3-VECC-53_App A - 2025-2029 Forecast kWh and kVa_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_3-VECC-42_App A_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_3-VECC-41_App A - LDEV Registrations Forecast_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_3-VECC-39_App A_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_3-VECC-37_App B - 2023-2029 Streetlighting Energy Usage Forecast_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_3-VECC-37_App A - 2023-2029 Load Forecast_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_3-VECC-34_App A 2015-2017 Final-Verified-Results-THESL_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_3-VECC-33_App B - 2015-2017 Final-Verified-Results-THESL_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_3-VECC-33_App A - 2015_2017_Savings_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_3-VECC-23_App A - CBoC_Employment_Population_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
EB-2023-0195 document icon THESL_3-SEC-79_App A_20240311 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2024-03-11 2024-03-11
Case Number File Name Document Type Applicant Issued By OEB Received By OEB Date Issued/Received