EB-2020-0290
|
SUP_Change in Contact Name_OPG_20220404
|
Correspondence
|
|
2022-04-04
|
2022-04-04
|
EB-2020-0290
|
dec_order_cost awards_OPG Payment Amounts_20220328
|
Decision and Order on Cost Awards
|
2022-03-28
|
|
2022-03-28
|
EB-2020-0290
|
QMA_Cost Claim_Updated_OPG Rates_20220304
|
Cost Claim
|
|
2022-03-04
|
2022-03-04
|
EB-2020-0290
|
OSEA_Cost Claim Objection Reply_OPG Rates_20220303
|
Cost Claim Objection Reply
|
|
2022-03-03
|
2022-03-03
|
EB-2020-0290
|
AMPCO_CCC_Cost Claim OBJ Reply_OPG Rates_20220302
|
Cost Claim Objection Reply
|
|
2022-03-02
|
2022-03-02
|
EB-2020-0290
|
EnergyProbe_Cost Obj Reply_OPG Rates_20220228
|
Cost Claim Objection Reply
|
|
2022-02-28
|
2022-02-28
|
EB-2020-0290
|
QMA_Cost Claim_Part 2_OPG Rates_20220228
|
Cost Claim
|
|
2022-02-28
|
2022-02-28
|
EB-2020-0290
|
QMA_Cost Claim_Part 1_OPG Rates_20220228
|
Cost Claim
|
|
2022-02-28
|
2022-02-28
|
EB-2020-0290
|
QMA_Cost Claim_Cvrltr_OPG Rates_20220228
|
Cost Claim
|
|
2022-02-28
|
2022-02-28
|
EB-2020-0290
|
AMPCO_Rev_Cost Claim_OPG Rates_20220217
|
Cost Claim
|
|
2022-02-25
|
2022-02-25
|
EB-2020-0290
|
OPG_Ltr_Cost Claim OBJ_20220224
|
Cost Claim Objection
|
|
2022-02-24
|
2022-02-24
|
EB-2020-0290
|
QMA_Delay_Filing of Cost Claim_OPG Rates_20220217
|
Cost Claim
|
|
2022-02-18
|
2022-02-18
|
EB-2020-0290
|
QMA_Cost Claim_MDMcL Résumé 2022_OPG Rates_20220217
|
Cost Claim
|
|
2022-02-18
|
2022-02-18
|
EB-2020-0290
|
QMA_Cost Claim_MDM Time Sheet_OPG Rates_20220217
|
Cost Claim
|
|
2022-02-18
|
2022-02-18
|
EB-2020-0290
|
QMA_Cost Claim_Invoice_OPG Rates_20220217
|
Cost Claim
|
|
2022-02-18
|
2022-02-18
|
EB-2020-0290
|
QMA_cvrltr_Cost Claim_OPG Rates_20220217
|
Cost Claim
|
|
2022-02-18
|
2022-02-18
|
EB-2020-0290
|
AMPCO_Cost Claim_OPG Rates_20220217
|
Cost Claim
|
|
2022-02-17
|
2022-02-17
|
EB-2020-0290
|
ED_Cost Claim_OPG Rates_20220217
|
Cost Claim
|
|
2022-02-17
|
2022-02-17
|
EB-2020-0290
|
CCC_Cost Claim_OPG Rates_20220217
|
Cost Claim
|
|
2022-02-17
|
2022-02-17
|
EB-2020-0290
|
SEC_Cost Claim_OPG Rates_20220217
|
Cost Claim
|
|
2022-02-17
|
2022-02-17
|
EB-2020-0290
|
OSEA_Cost Claim_OPG Rates_20220217
|
Cost Claim
|
|
2022-02-17
|
2022-02-17
|
EB-2020-0290
|
BOMA_Not Filing Cost Claim_OPG Rates_20220218
|
Cost Claim
|
|
2022-02-18
|
2022-02-18
|
EB-2020-0290
|
OAPPA_Cost Claim_OPG Rates_20220217
|
Cost Claim
|
|
2022-02-17
|
2022-02-17
|
EB-2020-0290
|
CME_Cost Claim_OPG Payment Amounts_20220217
|
Cost Claim
|
|
2022-02-17
|
2022-02-17
|
EB-2020-0290
|
OEBltr_Post Application Conf_Invitation_OPG 2022-2026 Payment Amounts_20220217
|
Correspondence
|
2022-02-17
|
|
2022-02-17
|
EB-2020-0290
|
VECC_Cost Claim_OPG Amounts_20220217
|
Cost Claim
|
|
2022-02-17
|
2022-02-17
|
EB-2020-0290
|
LPMA_Cost Claim_OPG Rates_20220209
|
Cost Claim
|
|
2022-02-09
|
2022-02-09
|
EB-2020-0290
|
EnergyProbe_Cost Claim_OPG Rates_20220201
|
Cost Claim
|
|
2022-02-01
|
2022-02-01
|
EB-2020-0290
|
order_Payment Amounts_OPG_ App G_Rev Reqt Form_20220127
|
Order
|
2022-01-27
|
|
2022-01-27
|
EB-2020-0290
|
order_OPG Payment_Amounts_20220127
|
Order
|
2022-01-27
|
|
2022-01-27
|
EB-2020-0290
|
OEB_Staff_SUB_OPG_Final_DPAO_20220120
|
Submission
|
|
2022-01-20
|
2022-01-20
|
EB-2020-0290
|
OPG_Updated_Draft_PAO_20220119
|
Draft Rate Order
|
|
2022-01-19
|
2022-01-19
|
EB-2020-0290
|
OPG_Updated_Draft_PAO_Final App G_OPG Rev Reqt Form_20220119
|
Draft Rate Order
|
|
2022-01-19
|
2022-01-19
|
EB-2020-0290
|
dec_order_PAO_OPG_2022-2026_20220112
|
Decision and Order
|
2022-01-12
|
|
2022-01-12
|
EB-2020-0290
|
OPG_Ltr_PAO_InterimOrder_20211223
|
Correspondence
|
|
2021-12-23
|
2021-12-23
|
EB-2020-0290
|
Interim Order_OPG_2022-2026_PA_20211216
|
Interim Decision and Order
|
2021-12-16
|
|
2021-12-16
|
EB-2020-0290
|
OPG_Resp_Comments_DRF_PAO_20211213
|
Submission
|
|
2021-12-13
|
2021-12-13
|
EB-2020-0290
|
VECC_SUB_Draft PAO_OPG_20211207
|
Submission
|
|
2021-12-07
|
2021-12-07
|
EB-2020-0290
|
AMPCO_SUB_Draft PAO_OPG_20211206
|
Submission
|
|
2021-12-07
|
2021-12-07
|
EB-2020-0290
|
SEC_SUB_DPAO_OPG_20211206
|
Submission
|
|
2021-12-06
|
2021-12-06
|
EB-2020-0290
|
OEB_Staff_SUB_Draft PAO_OPG_2022-2026_20211206
|
Submission
|
|
2021-12-06
|
2021-12-06
|
EB-2020-0290
|
LPMA_SUB_RATE_SMOOTHING_20211206
|
Submission
|
|
2021-12-06
|
2021-12-06
|
EB-2020-0290
|
OSEA_Cert Dest_Travis_OPG_20211202
|
Correspondence
|
|
2021-12-02
|
2021-12-02
|
EB-2020-0290
|
OPG_Draft_Payment Amount Order_20211129
|
Draft Rate Order
|
|
2021-11-29
|
2021-11-29
|
EB-2020-0290
|
OPG_Draft_PAO_App G_Revenue REQ Workform_20211129
|
Draft Rate Order
|
|
2021-11-29
|
2021-11-29
|
EB-2020-0290
|
SUP_Certificate of Destruction_EB2020-0290_20211129
|
Correspondence
|
|
2021-11-29
|
2021-11-29
|
EB-2020-0290
|
Andrew Blair_Confidentiality_Cert Dest_OPG_20211125
|
Correspondence
|
|
2021-11-25
|
2021-11-25
|
EB-2020-0290
|
Bayu Kidane_Cert Dest_OPG_20211124
|
Correspondence
|
|
2021-11-25
|
2021-11-25
|
EB-2020-0290
|
Daniel Rosenbluth_Confidentiality_cert Dest_OPG_20211124
|
Correspondence
|
|
2021-11-25
|
2021-11-25
|
EB-2020-0290
|
Richard Stephenson_Confidentiality_cert Dest_OPG_20211124
|
Correspondence
|
|
2021-11-25
|
2021-11-25
|
EB-2020-0290
|
OSEA_Cert Dest_OPG Rates_20211223
|
Correspondence
|
|
2021-11-23
|
2021-11-23
|
EB-2020-0290
|
OAPPA_Jupiter Energy_Gia DeJulio_Dest Cert_OPG Rates_20211122
|
Correspondence
|
|
2021-11-23
|
2021-11-23
|
EB-2020-0290
|
Amit Pinjani_Dest Cert_OPG_20211123
|
Correspondence
|
|
2021-11-23
|
2021-11-23
|
EB-2020-0290
|
Randy Aiken_Cert of Destruction_OPG Rates_20211122
|
Correspondence
|
|
2021-11-22
|
2021-11-22
|
EB-2020-0290
|
Roger Higgins_Certficate of Dest_OPG_20211122.pdf
|
Correspondence
|
|
2021-11-22
|
2021-11-22
|
EB-2020-0290
|
Tom Ladanyi_Cert of Destruction_OPG Rates_20211120
|
Correspondence
|
|
2021-11-20
|
2021-11-20
|
EB-2020-0290
|
VECC_Certificate of Destruction_M Garner_OPG_20211119
|
Correspondence
|
|
2021-11-19
|
2021-11-19
|
EB-2020-0290
|
CME_Certificate of Destruction_OPG_20211119
|
Correspondence
|
|
2021-11-19
|
2021-11-19
|
EB-2020-0290
|
ED_Destruction Certificate_OPG_20211119
|
Correspondence
|
|
2021-11-19
|
2021-11-19
|
EB-2020-0290
|
dec_order_OPG_2022_2026_PA_20211115
|
Decision and Order
|
2021-11-15
|
|
2021-11-15
|
EB-2020-0290
|
OEBltr_dec_Release_Lockup_OPG_2021111
|
Correspondence
|
2021-11-11
|
|
2021-11-11
|
EB-2020-0290
|
OPG_IRR_Ex. L-D2-02-AMPCO-073 to D2-02-AMPCO-089_Updated_20210922
|
Interrogatory Response from Applicant
|
|
2021-09-24
|
2021-09-24
|
EB-2020-0290
|
OPG_Consolidated_UndertakingResp_20210924
|
Undertaking Responses
|
|
2021-09-24
|
2021-09-24
|
EB-2020-0290
|
OPG_Updated_Revised_IRR_AMPCO 80_20210922
|
Interrogatory Response from Applicant
|
|
2021-09-22
|
2021-09-22
|
EB-2020-0290
|
OPG_ReplyARG_20210921
|
Applicant Reply Argument
|
|
2021-09-21
|
2021-09-21
|
EB-2020-0290
|
OPG_Rev_Undertaking Resp_J3.6_20210918
|
Undertaking Responses
|
|
2021-09-20
|
2021-09-20
|
EB-2020-0290
|
Transcript_OPG_Tech Conf_20210510_Redacted
|
Transcripts
|
|
|
2021-09-13 at 4:14 PM
|
EB-2020-0290
|
Audrey Bross_Ltr of Comment_OPG Rates_20210914_Redacted
|
Letter of Comment
|
|
2021-09-15
|
2021-09-15
|
EB-2020-0290
|
CME_SUB_OPG Rates_20210831
|
Submission
|
|
2021-08-31
|
2021-08-31
|
EB-2020-0290
|
AMPCO_CCC_SUB_OPG Rates_20210831
|
Submission
|
|
2021-09-01
|
2021-09-01
|
EB-2020-0290
|
SEC_SUB_OPG Rates_20210831
|
Submission
|
|
2021-09-01
|
2021-09-01
|
EB-2020-0290
|
VECC_SUB_OPG Rates_20210831
|
Submission
|
|
2021-09-01
|
2021-09-01
|
EB-2020-0290
|
QMA_SUB_OPG Rates_20210831
|
Submission
|
|
2021-08-31
|
2021-08-31
|
EB-2020-0290
|
ED_SUB_OPG Rates_20210831
|
Submission
|
|
2021-08-31
|
2021-08-31
|
EB-2020-0290
|
LPMA_SUB_OPG Rates_20210831
|
Submission
|
|
2021-08-31
|
2021-08-31
|
EB-2020-0290
|
EnergyProbe_SUB_OPG Rates_20210831
|
Submission
|
|
2021-08-31
|
2021-08-31
|
EB-2020-0290
|
SUP_SUB_OPG Rates_20210831
|
Submission
|
|
2021-08-31
|
2021-08-31
|
EB-2020-0290
|
OAPPA_SUB_OPG Rates_20210831
|
Submission
|
|
2021-08-31
|
2021-08-31
|
EB-2020-0290
|
OEB_Staff_SUB_OPG_2022_2026_PA_20210831
|
Submission
|
|
2021-08-31
|
2021-08-31
|
EB-2020-0290
|
PWU_SUB_OPG Rates_20210831
|
Submission
|
|
2021-08-31
|
2021-08-31
|
EB-2020-0290
|
dec_Confidentiality_OPG_Rates_20210830
|
Decision
|
2021-08-30
|
|
2021-08-30
|
EB-2020-0290
|
OPG_Confidentiality Req_Undertaking Resp_20210820
|
Correspondence
|
|
2021-08-20
|
2021-08-20
|
EB-2020-0290
|
OPG_Consolidated Undertaking Responses_20210820
|
Undertaking Responses
|
|
2021-08-20
|
2021-08-20
|
EB-2020-0290
|
OPG_IRR_Ex. L-D2-02-OAPPA-001 to D2-02-SEC 108_Updated_20210813
|
Interrogatory Response from Applicant
|
|
2021-08-20
|
2021-08-20
|
EB-2020-0290
|
OPG_Undertaking Resp_J2.07_Attach 2_20210818
|
Undertaking Responses
|
|
2021-08-18
|
2021-08-18
|
EB-2020-0290
|
OPG_Undertaking Resp_J2.07_Attach 1_20210818
|
Undertaking Responses
|
|
2021-08-18
|
2021-08-18
|
EB-2020-0290
|
OPG_Undertaking Resp_J2.7_J2.8_20210818
|
Undertaking Responses
|
|
2021-08-18
|
2021-08-18
|
EB-2020-0290
|
OPG_UndertakingResp_20210817
|
Undertaking Responses
|
|
2021-08-17
|
2021-08-17
|
EB-2020-0290
|
OPG_ARGChief_OPG Rates_20210817
|
Applicant Argument in Chief
|
|
2021-08-17
|
2021-08-17
|
EB-2020-0290
|
OPG_APPL_CovLtr_Updated Evidence PDFA_20210813
|
Application and Evidence
|
|
2021-08-13
|
2021-08-13
|
EB-2020-0290
|
OPG_Undertaking Resp_20210813
|
Undertaking Responses
|
|
2021-08-13
|
2021-08-13
|
EB-2020-0290
|
Transcripts_OPG Oral Hearing_Vol 3_20210806
|
Transcripts
|
|
2021-08-06
|
2021-08-06
|
EB-2020-0290
|
OPG_Undertaking Resp_J1.1_20210806
|
Undertaking Responses
|
|
2021-08-06
|
2021-08-06
|
EB-2020-0290
|
Transcripts_OPG Oral Hearing_Vol 2_20210805
|
Transcripts
|
|
2021-08-06
|
2021-08-06
|
EB-2020-0290
|
Exh_K2.1_SEC_Compendium_OPG Panel 2A_20210805
|
Exhibits
|
|
2021-08-05
|
2021-08-05
|
EB-2020-0290
|
OPG_OH_Exhibit_Undertaking List_20210806
|
Undertaking List
|
|
|
2021-08-06 at 8:40 AM
|
EB-2020-0290
|
Transcripts_OPG Oral Hearing_Vol 1_20210804
|
Transcripts
|
|
2021-08-05
|
2021-08-05
|
EB-2020-0290
|
OAPPA_Exhibits_Ont Clean Air Ad July 2021_OPG Rates_20210803
|
Exhibits
|
|
2021-08-03
|
2021-08-03
|
EB-2020-0290
|
SEC_Exhibits_4.3 Staff 72 Attach 4_OPG Rates_20210803
|
Exhibits
|
|
2021-08-03
|
2021-08-03
|
EB-2020-0290
|
SEC_Exhibits_Evolution of Business Cases_OPG Rates_20210803
|
Exhibits
|
|
2021-08-03
|
2021-08-03
|
EB-2020-0290
|
SEC_Exhibits_dec_order_OPG_20171228 pages 13 to 32_OPG Rates_20210803
|
Exhibits
|
|
2021-08-03
|
2021-08-03
|
EB-2020-0290
|
Exh_K1.9_AMPCO_CCC_Exhibits_D2-2-AMPCO_81 2018 Auditor General Report_OPG Rates_20210803
|
Exhibits
|
|
2021-08-03
|
2021-08-03
|
EB-2020-0290
|
Exh_K1.8_AMPCO_CCC_Exhibits_Summary D2O Costs_Bates White_OPG Rates_20210803
|
Exhibits
|
|
2021-08-03
|
2021-08-03
|
EB-2020-0290
|
Exh_K1.7_AMPCO_CCC_Exhibits_D2O Costs_Bates White Report_OPG Rates_20210803
|
Exhibits
|
|
2021-08-03
|
2021-08-03
|
EB-2020-0290
|
Exh_K1.5_AMPCO_CCC_Exhibits_DRP SCHEDULE COMPARISON_OPG Rates_20210803
|
Exhibits
|
|
2021-08-03
|
2021-08-03
|
EB-2020-0290
|
Exh_K1.6_AMPCO_CCC_Exhibits_Drain-Fill Schedule_OPG_20210803
|
Exhibits
|
|
2021-08-03
|
2021-08-03
|
EB-2020-0290
|
Exh_K1.4_AMPCO_CCC_Panel 2_D2O_Book of Evidence_20210804
|
Exhibits
|
|
2021-08-03
|
2021-08-03
|
EB-2020-0290
|
Exh_K1.3_AMPCO_CCC_Compendium_Panel 2_D20_OPG Oral Hearing_20210804
|
Exhibits
|
|
2021-08-03
|
2021-08-03
|
EB-2020-0290
|
Exh K1.1_AMPCO_Compendium_OPG Panel 1_SMR_20210803
|
Exhibits
|
|
2021-08-03
|
2021-08-03
|
EB-2020-0290
|
Exh_K1.2_Energy Probe_Compendium_OPG Payment Amounts Hearing_20210803
|
Exhibits
|
|
2021-08-03
|
2021-08-03
|
EB-2020-0290
|
OPG_Consolidated_UndertakingResp_20210820
|
Undertaking Responses
|
|
2021-08-20
|
2021-08-20
|
EB-2020-0290
|
OPG_IRR_Ex. L-G2, L-H1, L-H2, L-I1_Updated_20210730
|
Interrogatory Response from Applicant
|
|
2021-07-30
|
2021-07-30
|
EB-2020-0290
|
OPG_IRR_Ex. L-F3-02-Energy Probe-059 to F4-04-VECC-034_Updated_20210730
|
Interrogatory Response from Applicant
|
|
2021-07-30
|
2021-07-30
|
EB-2020-0290
|
OPG_IRR_Ex. L-F2-02-AMPCO-144 to F3-01-VECC-029_Updated_20210730
|
Interrogatory Response from Applicant
|
|
2021-07-30
|
2021-07-30
|
EB-2020-0290
|
OPG_IRR_Ex. L-F2-01-AMPCO-143 to F2-01-VECC-028_Updated_20210730
|
Interrogatory Response from Applicant
|
|
2021-07-30
|
2021-07-30
|
EB-2020-0290
|
OPG_IRR_Ex. L-D3 and Ex. L-D4_Updated_20210730
|
Interrogatory Response from Applicant
|
|
2021-07-30
|
2021-07-30
|
EB-2020-0290
|
OPG_IRR_Ex. L-D2-02-SEC-084_Updated_20210730
|
Interrogatory Response from Applicant
|
|
2021-07-30
|
2021-07-30
|
EB-2020-0290
|
OPG_IRR_Ex. L-D2-02-OAPPA-001 to D2-02-SEC 108_Updated_20210730
|
Interrogatory Response from Applicant
|
|
2021-07-30
|
2021-07-30
|
EB-2020-0290
|
OPG_IRR_Ex. L-D2-02-CCC-32 to D2-02-Environmental Defence 08_Updated_20210730
|
Interrogatory Response from Applicant
|
|
2021-07-30
|
2021-07-30
|
EB-2020-0290
|
OPG_IRR_Ex. L-D2-02-AMPCO-106 to D2-02-AMPCO-130_Updated_20210730
|
Interrogatory Response from Applicant
|
|
2021-07-30
|
2021-07-30
|
EB-2020-0290
|
OPG_IRR_Ex. L-D2-02-AMPCO-090 to D2-02-AMPCO-105_Updated_20210730
|
Interrogatory Response from Applicant
|
|
2021-07-30
|
2021-07-30
|
EB-2020-0290
|
OPG_IRR_Ex. L-D2-02-AMPCO-073 to D2-02-AMPCO-089_Updated_202100730
|
Interrogatory Response from Applicant
|
|
2021-07-30
|
2021-07-30
|
EB-2020-0290
|
OPG_IRR_Ex. L-C_Updated_20210730
|
Interrogatory Response from Applicant
|
|
2021-07-30
|
2021-07-30
|
EB-2020-0290
|
OPG_IRR_Ex. L-A2_Updated_20210730
|
Interrogatory Response from Applicant
|
|
2021-07-30
|
2021-07-30
|
EB-2020-0290
|
OPG_IRR_Ex. L-A1_Updated_20210730
|
Interrogatory Response from Applicant
|
|
2021-07-30
|
2021-07-30
|
EB-2020-0290
|
OPG_Ex. F4_Other Operating Costs_Updated_20210730
|
Application and Evidence
|
|
2021-07-30
|
2021-07-30
|
EB-2020-0290
|
OPG_Ex. F3_Corporate Support Services_Updated_20210730
|
Application and Evidence
|
|
2021-07-30
|
2021-07-30
|
EB-2020-0290
|
OPG_Ex. F2-04-01_F2-08-01_Operating Costs_Updated_20210730
|
Application and Evidence
|
|
2021-07-30
|
2021-07-30
|
EB-2020-0290
|
OPG_Ex. D2-01-03 Capital Projects Nuclear_24_Redacted_Updated_20210730
|
Application and Evidence
|
|
2021-07-30
|
2021-07-30
|
EB-2020-0290
|
OPG_Ex. A2-02-01 Business Planning and Budgeting_Updated_20210730
|
Application and Evidence
|
|
2021-07-30
|
2021-07-30
|
EB-2020-0290
|
OPG_Ex. A1-01-01 to A1-03-03_Administrative Documents_Updated_20210730
|
Application and Evidence
|
|
2021-07-30
|
2021-07-30
|
EB-2020-0290
|
OPG_Ex. A1-04-03_to A1-12-01_Administrative Documents_PDFA_Updated_20210730
|
Application and Evidence
|
|
2021-07-30
|
2021-07-30
|
EB-2020-0290
|
OPG_Updated IRR_20210728
|
Interrogatory Response from Applicant
|
|
2021-07-28
|
2021-07-28
|
EB-2020-0290
|
OPG_LTR_D2O Video_20210728
|
Correspondence
|
|
2021-07-28
|
2021-07-28
|
EB-2020-0290
|
OPG_LTR_SMR Hearing_20210726 PDFA_20210727
|
Correspondence
|
|
2021-07-26
|
2021-07-26
|
EB-2020-0290
|
OPG_SUB_Confidentiality_Req3_20210723
|
Submission
|
|
2021-07-23
|
2021-07-23
|
EB-2020-0290
|
OPG_APPL_CovLtr_Updated Evidence PDFA_20210723
|
Application and Evidence
|
|
2021-07-23
|
2021-07-23
|
EB-2020-0290
|
OEB ltr_Oral Hearing_OPG_20210723
|
Correspondence
|
2021-07-23
|
|
2021-07-23
|
EB-2020-0290
|
OEB_Staff_Sub_Settlement_Prop_OPG_2022_2026_PA_20210722
|
Submission
|
|
2021-07-22
|
2021-07-22
|
EB-2020-0290
|
PO4_OPG_2022-2026_Payment Amounts_20210719
|
Procedural Order
|
2021-07-20
|
|
2021-07-20
|
EB-2020-0290
|
OPG_Settlement Proposal_Revised Rate Smoothing Proposal_20210716
|
Settlement Proposal
|
|
2021-07-16
|
2021-07-16
|
EB-2020-0290
|
OPG_Settlement Proposal_Draft PAO_App G_RRWF_20210716
|
Settlement Proposal
|
|
2021-07-16
|
2021-07-16
|
EB-2020-0290
|
OPG_Settlement Proposal_20210716
|
Settlement Proposal
|
|
2021-07-16
|
2021-07-16
|
EB-2020-0290
|
OPG_IRR_Updated_L-F4-03_PWU-015_Attach 1_20210709
|
Interrogatory Response from Applicant
|
|
2021-07-11
|
2021-07-11
|
EB-2020-0290
|
OPG_IRR_Updated_2K with 2020 Actuals_20210709
|
Interrogatory Response from Applicant
|
|
2021-07-11
|
2021-07-11
|
EB-2020-0290
|
OPG_Appl_cvrltr_Updated EVD_20210709
|
Application and Evidence
|
|
2021-07-11
|
2021-07-11
|
EB-2020-0290
|
OPG_Updated_IRR_Ex L-D2-02-AMPCO-079_Attachment 01_20210629
|
Interrogatory Response from Applicant
|
|
2021-06-29
|
2021-06-29
|
EB-2020-0290
|
OPG_Updated_IRR_Ex. L-D2-02-AMPCO-079 Attachments 80-100_20210629
|
Interrogatory Response from Applicant
|
|
2021-06-29
|
2021-06-29
|
EB-2020-0290
|
OPG_Updated_IRR_Ex. L-D2-02-AMPCO-079 Attachments 5-79_20210629
|
Interrogatory Response from Applicant
|
|
2021-06-29
|
2021-06-29
|
EB-2020-0290
|
OPG_Updated_IRR_Ex. L-D2-02-AMPCO-079 and Attachments 2 3 and 4_20210629
|
Interrogatory Response from Applicant
|
|
2021-06-29
|
2021-06-29
|
EB-2020-0290
|
OPG_Undertaking Resp_JT_Part 11_20210614
|
Undertaking Responses
|
|
2021-06-14
|
2021-06-14
|
EB-2020-0290
|
OEB Staff_Ltr_OPG_Payment Amounts_Settlement Progress_20210611
|
Correspondence
|
|
2021-06-11
|
2021-06-11
|
EB-2020-0290
|
OEBltr_SettlementConf Response_OPG Payment Amounts_20210611
|
Correspondence
|
2021-06-11
|
|
2021-06-11
|
EB-2020-0290
|
OPG_Undertaking Resp_JT_Part 10_20210609
|
Undertaking Responses
|
|
2021-06-09
|
2021-06-09
|
EB-2020-0290
|
OEBltr_SettlementConf Response_OPG Payment Amounts_20210609
|
Correspondence
|
2021-06-09
|
|
2021-06-09
|
EB-2020-0290
|
OEB Staff_Ltr_Settlement Conf Progress_OPG_Payment Amounts_20210609
|
Correspondence
|
|
2021-06-09
|
2021-06-09
|
EB-2020-0290
|
OPG_Undertaking Resp_Complete List of Undertakings_20210608
|
Undertaking Responses
|
|
2021-06-09
|
2021-06-09
|
EB-2020-0290
|
OPG_Undertaking Resp_JT_Part 9_20210608
|
Undertaking Responses
|
|
2021-06-08
|
2021-06-08
|
EB-2020-0290
|
dec_on_Confidentiality IRR_OPG Rates_20210608
|
Decision
|
2021-06-08
|
|
2021-06-08
|
EB-2020-0290
|
QMA_Decl_Undertaking_MM_OPG Rates_20210608
|
Declaration and Undertakings
|
|
2021-06-08
|
2021-06-08
|
EB-2020-0290
|
SUP_Decl_Undertaking Form_BD_OPG Rates_20210607
|
Declaration and Undertakings
|
|
2021-06-07
|
2021-06-07
|
EB-2020-0290
|
SEC_Decl_Undertaking_JS_20210606
|
Declaration and Undertakings
|
|
2021-06-04
|
2021-06-04
|
EB-2020-0290
|
SEC_Dec_Undertaking_FZ_20210604
|
Declaration and Undertakings
|
|
2021-06-04
|
2021-06-04
|
EB-2020-0290
|
OPG_IRR_JT_Updated Exhibits_20210606
|
Interrogatory Response from Applicant
|
|
2021-06-07
|
2021-06-07
|
EB-2020-0290
|
OPG_JT3_Undertaking Resp_Consolidated_20210606
|
Undertaking Responses
|
|
2021-06-07
|
2021-06-07
|
EB-2020-0290
|
OPG_JT1_Undertaking Resp_Consolidated_20210606
|
Undertaking Responses
|
|
2021-06-07
|
2021-06-07
|
EB-2020-0290
|
OPG_JT4_Undertaking Resp_Consolidated_20210606
|
Undertaking Responses
|
|
2021-06-07
|
2021-06-07
|
EB-2020-0290
|
OPG_JT2_Undertaking Resp_Consolidated_20210606
|
Undertaking Responses
|
|
2021-06-07
|
2021-06-07
|
EB-2020-0290
|
OPG_JI1_Undertaking Res_Consolidated_20210606
|
Undertaking Responses
|
|
2021-06-07
|
2021-06-07
|
EB-2020-0290
|
OPG_Undertaking Resp_JT4.8 Attach 1_20210606
|
Undertaking Responses
|
|
2021-06-07
|
2021-06-07
|
EB-2020-0290
|
OPG_Undertaking Resp_JI1.2_20210606
|
Undertaking Responses
|
|
2021-06-07
|
2021-06-07
|
EB-2020-0290
|
OPG_Undertaking Resp_Part 8_20210606
|
Undertaking Responses
|
|
2021-06-07
|
2021-06-07
|
EB-2020-0290
|
OPG_Undertaking Resp_Part 7_20210605
|
Undertaking Responses
|
|
2021-06-05
|
2021-06-05
|
EB-2020-0290
|
OPG_IRR_Updated_CME-006_Staff-285_20210604
|
Interrogatory Response from Applicant
|
|
2021-06-04
|
2021-06-04
|
EB-2020-0290
|
OPG_Undertaking Response_Part 6_20210604
|
Undertaking Responses
|
|
2021-06-04
|
2021-06-04
|
EB-2020-0290
|
OSEA_Lusney_Declaration_Undertaking_OPG Rates_20210604
|
Declaration and Undertakings
|
|
2021-06-04
|
2021-06-04
|
EB-2020-0290
|
OSEA_Yauch_Declaration_Undertaking_OPG Rates_20210604
|
Declaration and Undertakings
|
|
2021-06-04
|
2021-06-04
|
EB-2020-0290
|
OSEA_Jackiw_Declaration Undertaking_OPG Rates_20210604
|
Declaration and Undertakings
|
|
2021-06-04
|
2021-06-04
|
EB-2020-0290
|
Julie Girvan_Declaration_Undertaking_OPG_20210604
|
Declaration and Undertakings
|
|
2021-06-04
|
2021-06-04
|
EB-2020-0290
|
VECC_Garner_Signed Declaration_Undertaking_OPG_20210604
|
Declaration and Undertakings
|
|
2021-06-04
|
2021-06-04
|
EB-2020-0290
|
OEB Staff_IRR_LEI IntrvEVD_Exh-N_OPG-29_Att-2_20210603
|
Interrogatory Response from Intervenor
|
|
2021-06-03
|
2021-06-03
|
EB-2020-0290
|
OEBStaff_IRR_LEI IntrvEVD_Exh-N_OPG-29_Att-1_20210603
|
Interrogatory Response from Intervenor
|
|
2021-06-03
|
2021-06-03
|
EB-2020-0290
|
OEBStaff_IRR_LEI IntrvEVD_Exh-N_OPG-28_Att_1_20210603
|
Interrogatory Response from Intervenor
|
|
2021-06-03
|
2021-06-03
|
EB-2020-0290
|
OEB Staff_IRR_LEI IntrvEVD_Exh-N_OPG-22_Att-1_20210603
|
Interrogatory Response from Intervenor
|
|
2021-06-03
|
2021-06-03
|
EB-2020-0290
|
OEBStaff_IRR_LEI IntrvEVD_Exh-N_OPG-18_Att-2_20210603
|
Interrogatory Response from Intervenor
|
|
2021-06-03
|
2021-06-03
|
EB-2020-0290
|
OEB Staff_IRR_LEI IntrvEVD_Exh-N_OPG-18_Att-1_20210603
|
Interrogatory Response from Intervenor
|
|
2021-06-03
|
2021-06-03
|
EB-2020-0290
|
OEB Staff_IRR_LEI IntrvEVD_Exh-N_OPG-15_Att-1_20210603
|
Interrogatory Response from Intervenor
|
|
2021-06-03
|
2021-06-03
|
EB-2020-0290
|
OEBStaff_IRR_LEI IntrvEVD_Exh-N_OPG-12_Att-1_20210603
|
Interrogatory Response from Intervenor
|
|
2021-06-03
|
2021-06-03
|
EB-2020-0290
|
OEBStaff_IRR_LEI IntrvEVD_Exh-N_OPG-3_Att-7_20210603
|
Interrogatory Response from Intervenor
|
|
2021-06-03
|
2021-06-03
|
EB-2020-0290
|
OEBStaff_IRR_LEI IntrvEVD_Exh-N_OPG-3_Att-6_20210603
|
Interrogatory Response from Intervenor
|
|
2021-06-03
|
2021-06-03
|
EB-2020-0290
|
OEBStaff_IRR_LEI IntrvEVD_Exh-N_OPG-3_Att-5_20210306
|
Interrogatory Response from Intervenor
|
|
2021-06-03
|
2021-06-03
|
EB-2020-0290
|
OEBStaff_IRR_LEI IntrvEVD_Exh-N_OPG-3_Att-4_20210603
|
Interrogatory Response from Intervenor
|
|
2021-06-03
|
2021-06-03
|
EB-2020-0290
|
OEBStaff_IRR_IntrvEVD LEI_Exh-N_OPG-3_Att-3_20210603
|
Interrogatory Response from Intervenor
|
|
2021-06-03
|
2021-06-03
|
EB-2020-0290
|
OEBStaff_IRR_LEI IntrvEVD_Exh-N_OPG-3_Att-2_20210603
|
Interrogatory Response from Intervenor
|
|
2021-06-03
|
2021-06-03
|
EB-2020-0290
|
OEBStaff_IRR_LEI IntrvEVD_Exh-N_OPG-3_Att-1_20210603
|
Interrogatory Response from Intervenor
|
|
2021-06-03
|
2021-06-03
|
EB-2020-0290
|
OEBStaff_IRR_LEI IntrvEVD_Exh-N_OPG-2_Att-1_20210603
|
Interrogatory Response from Intervenor
|
|
2021-06-03
|
2021-06-03
|
EB-2020-0290
|
OEBStaff_IRR_LEI IntrvEVD_SEC_20210603
|
Interrogatory Response from Intervenor
|
|
2021-06-03
|
2021-06-03
|
EB-2020-0290
|
OEB Staff_IRR_LEI IntrvEVD_OPG_20210603
|
Interrogatory Response from Intervenor
|
|
2021-06-03
|
2021-06-03
|
EB-2020-0290
|
OEB Staff_cvrltr_IRR_LEI_20210603_signed
|
Interrogatory Response from Intervenor
|
|
2021-06-03
|
2021-06-03
|
EB-2020-0290
|
OPG_Undertaking Resp_Tech Conf_Part 5_20210602
|
Undertaking Responses
|
|
2021-06-02
|
2021-06-02
|
EB-2020-0290
|
PWU_Ltr_Addl Counsel_OPG Rates_20210601
|
Correspondence
|
|
2021-06-01
|
2021-06-01
|
EB-2020-0290
|
OPG_Response_Panel Questions_Issues_Motions_20210531
|
Correspondence
|
|
2021-05-31
|
2021-05-31
|
EB-2020-0290
|
OPG_Undertaking Resp_Part 4_20210531
|
Undertaking Responses
|
|
2021-05-31
|
2021-05-31
|
EB-2020-0290
|
OPG_Undertaking Resp_Part 3_20210528
|
Undertaking Responses
|
|
2021-05-28
|
2021-05-28
|
EB-2020-0290
|
OPG_IRR_Updated_AMPCO-081 CME-019_20210528
|
Interrogatory Response from Applicant
|
|
2021-05-28
|
2021-05-28
|
EB-2020-0290
|
OPG_IRR_L-F4-03-SEC-149_Redacted_Updated 20210527
|
Interrogatory Response from Applicant
|
|
2021-05-27
|
2021-05-27
|
EB-2020-0290
|
OPG_IRR_L-F4-01-PWU-029_Redacted_Updated 20210527
|
Interrogatory Response from Applicant
|
|
2021-05-27
|
2021-05-27
|
EB-2020-0290
|
OPG_IRR_L-F4-03-AMPCO-174_Redacted_Updated 20210527
|
Interrogatory Response from Applicant
|
|
2021-05-27
|
2021-05-27
|
EB-2020-0290
|
OPG_SUB_Confidential Filings_20210527
|
Submission
|
|
2021-05-27
|
2021-05-27
|
EB-2020-0290
|
OPG_IRR_Ex. L-F3-02-Energy Probe-059 to F4-04-VECC-035_updated_20210527
|
Interrogatory Response from Applicant
|
|
2021-05-27
|
2021-05-27
|
EB-2020-0290
|
OPG_LTR_IRR Inadvertent Disclosure_20210527
|
Correspondence
|
|
2021-05-27
|
2021-05-27
|
EB-2020-0290
|
dec on Motions_OPG_2022-2026 Payment Amounts_20210527
|
Decision
|
2021-05-27
|
|
2021-05-27
|
EB-2020-0290
|
LPMA_Declaration and Undertaking_OPG Rates_20210526
|
Declaration and Undertakings
|
|
2021-05-26
|
2021-05-26
|
EB-2020-0290
|
ED_Declaration_Undertaking_OPG Rates_20210526
|
Declaration and Undertakings
|
|
2021-05-26
|
2021-05-26
|
EB-2020-0290
|
BOMA_Withdrawal_IntrvStatus_OPG_20210526
|
Correspondence
|
|
2021-05-26
|
2021-05-26
|
EB-2020-0290
|
OPG_IR_OEBStaff_EVD M1_LEI_20210525
|
Interrogatories to Intervenor
|
|
2021-05-25
|
2021-05-25
|
EB-2020-0290
|
SEC_IR_LEI_OPG Rates_20210525
|
Interrogatories to Intervenor
|
|
2021-05-25
|
2021-05-25
|
EB-2020-0290
|
OPG_Undertaking Resp_JT_Partial_Part 2_20210521
|
Undertaking Responses
|
|
2021-05-21
|
2021-05-21
|
EB-2020-0290
|
OPG_Undertaking Reso_JI1.1_20210521
|
Undertaking Responses
|
|
2021-05-21
|
2021-05-21
|
EB-2020-0290
|
OPG_Motions Day_Exhibit_Undertaking List_20210521
|
Undertaking List
|
|
|
2021-05-21 at 2:37 PM
|
EB-2020-0290
|
EXH_KM1.2_AMPCO_Auditor General Report DRP_20210521
|
Exhibits
|
|
2021-05-21
|
2021-05-21
|
EB-2020-0290
|
EXH_KM1.2_AMPCO_Compendium_Motions Day_20210521
|
Exhibits
|
|
2021-05-21
|
2021-05-21
|
EB-2020-0290
|
Transcript_OPG Motions Day_20210521
|
Transcripts
|
|
2021-05-21
|
2021-05-21
|
EB-2020-0290
|
EXH_KM1.1_SEC_Motions Day_Compendium_OPG Motions Hearing_20210521
|
Exhibits
|
|
2021-05-21
|
2021-05-21
|
EB-2020-0290
|
VECC_SUB_IRRConfidentiality_OPG_20210520
|
Submission
|
|
2021-05-21
|
2021-05-21
|
EB-2020-0290
|
SEC_SUB_IRR_Conf_OPG_20210520
|
Submission
|
|
2021-05-20
|
2021-05-20
|
EB-2020-0290
|
OEBStaff_SUB_OPG_IRR Confidentiality_20210520
|
Submission
|
|
2021-05-20
|
2021-05-20
|
EB-2020-0290
|
PWU_SUB_OPG Confidentiality REQ_20210520
|
Submission
|
|
2021-05-20
|
2021-05-20
|
EB-2020-0290
|
dec_Issues List_OPG_2022-2026 Payment Amounts_20210520
|
Decision
|
2021-05-20
|
|
2021-05-20
|
EB-2020-0290
|
OPG_Issues Day_Exhibit_Undertaking List_20210518
|
Undertaking List
|
2021-05-18
|
|
2021-05-18
|
EB-2020-0290
|
Transcript_Issues Day_OPG Rates_20210518
|
Transcripts
|
|
2021-05-18
|
2021-05-18
|
EB-2020-0290
|
K1_1.2_Exh_ED_Ltr Motion_OPG Rates_20210514
|
Exhibits
|
|
2021-05-18
|
2021-05-18
|
EB-2020-0290
|
K1 1.1_Exhibit_SEC_Compendium_Issues Day_OPG Hearing_20210518
|
Exhibits
|
|
2021-05-18
|
2021-05-18
|
EB-2020-0290
|
OPG_Undertaking Resp_JT2.17 Attach 1_20210517
|
Undertaking Responses
|
|
2021-05-17
|
2021-05-17
|
EB-2020-0290
|
OPG_Undertaking Resp_JT_Partial_Part 1_20210517
|
Undertaking Responses
|
|
2021-05-17
|
2021-05-17
|
EB-2020-0290
|
OPG_Undertaking Resp_IRR_L-F4-03-AMPCO-167 Attach 1_20210517
|
Undertaking Responses
|
|
2021-05-17
|
2021-05-17
|
EB-2020-0290
|
AMPCO_LTR_Motions Day Hearing_Issues_OPG Rates_20210514
|
Correspondence
|
|
2021-05-17
|
2021-05-17
|
EB-2020-0290
|
CME_Ltr_Issues Day Hearing_OPG Rates_20210514
|
Correspondence
|
|
2021-05-14
|
2021-05-14
|
EB-2020-0290
|
Rules_Form-A_Experts_Duty - AJ Goulding_OPG Rates_20210514
|
Intervenor Evidence
|
|
2021-05-14
|
2021-05-14
|
EB-2020-0290
|
OEB Staff_cvrltr_LEI_Evidence_OPG Rates_20210514
|
Intervenor Evidence
|
|
2021-05-14
|
2021-05-14
|
EB-2020-0290
|
OEB_OPG capitalization LEI Expert Report_20210514
|
Intervenor Evidence
|
|
2021-05-14
|
2021-05-14
|
EB-2020-0290
|
Rules_Form-A_Experts_Duty - Amit Pinjani_OPG Rates_20210514
|
Intervenor Evidence
|
|
2021-05-14
|
2021-05-14
|
EB-2020-0290
|
QMA_Participation_Issues Day Hearing_OPG Rates_20210514
|
Correspondence
|
|
2021-05-14
|
2021-05-14
|
EB-2020-0290
|
ED_Ltr_Participate_ Issues Day Hearing_OPG Rates_20210514
|
Correspondence
|
|
2021-05-14
|
2021-05-14
|
EB-2020-0290
|
ED_Ltr_OPG Motions Hearing_20210514
|
Correspondence
|
|
2021-05-14
|
2021-05-14
|
EB-2020-0290
|
SEC_Motions Day_Topics_OPG Rates_20210514
|
Correspondence
|
|
2021-05-14
|
2021-05-14
|
EB-2020-0290
|
OEB_Staff_Issues_and_Motions_Hearing_Participation_Letter_20210514
|
Correspondence
|
|
2021-05-14
|
2021-05-14
|
EB-2020-0290
|
OPG_TC_Exhibit_Undertaking List_20210507
|
Undertaking List
|
2021-05-14
|
|
2021-05-14
|
EB-2020-0290
|
Intervention List_OPG Rates_20210514
|
Intervenor Request Letter
|
2021-05-14
|
|
2021-05-14
|
EB-2020-0290
|
OSEA_Ltr_Issues List Hearing_OPG Rates_20210514
|
Correspondence
|
|
2021-05-14
|
2021-05-14
|
EB-2020-0290
|
CCC_Issues Day Participation_OPG Rates_20210514
|
Correspondence
|
|
2021-05-14
|
2021-05-14
|
EB-2020-0290
|
AMPCO_Issues Day Participation_OPG Rates_20210513
|
Correspondence
|
|
2021-05-14
|
2021-05-14
|
EB-2020-0290
|
VECC_Issues Day Participation_OPG Rates_20210513
|
Correspondence
|
|
2021-05-14
|
2021-05-14
|
EB-2020-0290
|
OAPPA_Participate_Issues Day Hearing_OPG Rates_20210513
|
Correspondence
|
|
2021-05-13
|
2021-05-13
|
EB-2020-0290
|
EnergyProbe_Participate_Issues Day_20200513
|
Correspondence
|
|
2021-05-13
|
2021-05-13
|
EB-2020-0290
|
OEBStaff_ltr_Partial Agreement_Issues List_20210513
|
Correspondence
|
|
2021-05-13
|
2021-05-13
|
EB-2020-0290
|
PO3_OPG_2022-2026_Payment_Amounts_20210513
|
Procedural Order
|
2021-05-13
|
|
2021-05-13
|
EB-2020-0290
|
SEC_participation_Issues List Hearing_OPG 2022-2026 Payment Amount_20210513
|
Correspondence
|
|
2021-05-13
|
2021-05-13
|
EB-2020-0290
|
PWU_Affidavit_Andrew Blair_OPG Rates_20210512
|
Declaration and Undertakings
|
|
2021-05-12
|
2021-05-12
|
EB-2020-0290
|
PWU_Affidavit_Bayu Kidane_OPG Rates_20210512
|
Declaration and Undertakings
|
|
2021-05-12
|
2021-05-12
|
EB-2020-0290
|
PWU_cvrltr_Affidavits_OPG Rates_20210512
|
Correspondence
|
|
2021-05-12
|
2021-05-12
|
EB-2020-0290
|
OPG_Updated IRR_20210511
|
Interrogatory Response from Applicant
|
|
2021-05-11
|
2021-05-11
|
EB-2020-0290
|
OPG_IRR_CovLtr_Updated Evidence_20210511
|
Application and Evidence
|
|
2021-05-11
|
2021-05-11
|
EB-2020-0290
|
OPG_LtrComment_Respose_20210511
|
Correspondence
|
|
2021-05-11
|
2021-05-11
|
EB-2020-0290
|
OPG_SUB_Confidentiality_Req2_IRRs_R_20210511
|
Submission
|
|
2021-05-11
|
2021-05-11
|
EB-2020-0290
|
SEC_Contact Info Change_20210505
|
Correspondence
|
|
2021-05-07
|
2021-05-07
|
EB-2020-0290
|
Transcripts_REDACTED_OPG Tech Conf_Day 4_20210510
|
Transcripts
|
|
2021-05-10
|
2021-05-10
|
EB-2020-0290
|
OPG_IRR_L A1-02-SEC-010 PDFA_20210510
|
Interrogatory Response from Applicant
|
|
2021-05-10
|
2021-05-10
|
EB-2020-0290
|
OPG Follow-up Questions_KT 3.3_Material_20210510
|
Exhibits
|
|
2021-05-10
|
2021-05-10
|
EB-2020-0290
|
OPG Tech Conference_KT 3.2_C2 Staff 85_20210510
|
Exhibits
|
|
2021-05-10
|
2021-05-10
|
EB-2020-0290
|
OPG_Panel_3_KT 3.1 _IESO Approach to Implement_MRP_pg11_Staff11_20210510
|
Exhibits
|
|
2021-05-10
|
2021-05-10
|
EB-2020-0290
|
Transcripts_OPG Tech Conf_Day 3_20210507
|
Transcripts
|
|
2021-05-07
|
2021-05-07
|
EB-2020-0290
|
OEBltr_Tech Conf Addl Day_OPG Rates 2022-2026_20210507
|
Correspondence
|
2021-05-07
|
|
2021-05-07
|
EB-2020-0290
|
CCC_Declaration_Undertaking_MRB_OPG Rates_20210507
|
Declaration and Undertakings
|
|
2021-05-07
|
2021-05-07
|
EB-2020-0290
|
Transcripts_OPG Tech Conf_Day 2_20210506
|
Transcripts
|
|
2021-05-07
|
2021-05-07
|
EB-2020-0290
|
OPG_IRR_OEB Review Only_cvrltr_20210503
|
Interrogatory Response from Applicant
|
|
2021-05-03
|
2021-05-03
|
EB-2020-0290
|
OPG_LTR_IRR Inadvertent Disclosure_20210503
|
Correspondence
|
|
2021-05-04
|
2021-05-04
|
EB-2020-0290
|
SEC_EXH_KT1.2_OPG TC_Nuc Operations Project Capital_20210503
|
Exhibits
|
|
2021-05-03
|
2021-05-03
|
EB-2020-0290
|
SEC_EXH_KT1.1_OPG TC_Cost Estimate Table_20210503
|
Exhibits
|
|
2021-05-03
|
2021-05-03
|
EB-2020-0290
|
Transcript_OPG Tech Conf_Day 1_20210503
|
Transcripts
|
|
2021-05-04
|
2021-05-04
|
EB-2020-0290
|
OPG_IRR_Ex. L-D3 and Ex. L-D4_Updated_20210429
|
Interrogatory Response from Applicant
|
|
2021-05-01
|
2021-05-01
|
EB-2020-0290
|
OPG_IRR_Ex. L-D2-02-Staff 105 to D2-02-02 Staff 175_Updated_20210429
|
Interrogatory Response from Applicant
|
|
2021-05-01
|
2021-05-01
|
EB-2020-0290
|
OPG_IRR_Ex. L-G2, L-H1, L-H2, L-I1_Updated_20200429
|
Interrogatory Response from Applicant
|
|
2021-05-01
|
2021-05-01
|
EB-2020-0290
|
OPG_IRR_Ex. L-D3 and Ex. L-D4_Updated_20210429
|
Interrogatory Response from Applicant
|
|
2021-05-01
|
2021-05-01
|
EB-2020-0290
|
OPG_IRR_Ex. L-D2-02-Staff 105 to D2-02-02 Staff 175_Updated_20210429
|
Interrogatory Response from Applicant
|
|
2021-05-01
|
2021-05-01
|
EB-2020-0290
|
OPG_IRR_Ex. L-F3-02-Energy Probe-059 to F4-04-VECC-035_updated_20210503
|
Interrogatory Response from Applicant
|
|
2021-05-01
|
2021-05-01
|
EB-2020-0290
|
OPG_IRR_Ex. L-D2-02-OAPPA-001 to D2-02-SEC 108_Updated_20210429
|
Interrogatory Response from Applicant
|
|
2021-05-01
|
2021-05-01
|
EB-2020-0290
|
OPG_IRR_Ex. L-D2-02-AMPCO-131 and Attachments 1,2,4-7 to D2-02-AMPCO-136_Updated_2021049
|
Interrogatory Response from Applicant
|
|
2021-05-01
|
2021-05-01
|
EB-2020-0290
|
OPG_IRR_Ex. L-D2-02-AMPCO-106 to D2-02-AMPCO-130_Updated_20210429
|
Interrogatory Response from Applicant
|
|
2021-05-01
|
2021-05-01
|
EB-2020-0290
|
OPG_IRR_Ex. L-D2-02-AMPCO-073 to D2-02-AMPCO-089_Updated_20210426
|
Interrogatory Response from Applicant
|
|
2021-05-01
|
2021-05-01
|
EB-2020-0290
|
OPG_IRR_Ex. L-D2-02-CCC-032 to D2-02-Environmental Defence 08_Updated_20210426
|
Interrogatory Response from Applicant
|
|
2021-05-01
|
2021-05-01
|
EB-2020-0290
|
OPG_IRR_Ex. L-D2-01-Energy Probe-015 to D2-01-SEC-059_Updated_20210426
|
Interrogatory Response from Applicant
|
|
2021-05-01
|
2021-05-01
|
EB-2020-0290
|
OPG_IRR_Ex. L-C_Updated_20210429
|
Interrogatory Response from Applicant
|
|
2021-05-01
|
2021-05-01
|
EB-2020-0290
|
OPG_IRR_Ex. L-B_Updated_20210429
|
Interrogatory Response from Applicant
|
|
2021-05-01
|
2021-05-01
|
EB-2020-0290
|
OPG_IRR_Ex. L-A2_Updated_20210428
|
Interrogatory Response from Applicant
|
|
2021-05-01
|
2021-05-01
|
EB-2020-0290
|
OPG_IRR_Ex. L-A1_Updated_20210430
|
Interrogatory Response from Applicant
|
|
2021-05-01
|
2021-05-01
|
EB-2020-0290
|
OPG_Ex. I_Determination of Payment Amounts_Updated_20210430
|
Application and Evidence
|
|
2021-05-01
|
2021-05-01
|
EB-2020-0290
|
OPG_Ex. H_Deferral and Variance Accounts_Updated_20210429
|
Application and Evidence
|
|
2021-05-01
|
2021-05-01
|
EB-2020-0290
|
OPG_Ex. G_Other Revenues_Updated_20210429
|
Application and Evidence
|
|
2021-05-01
|
2021-05-01
|
EB-2020-0290
|
OPG_Ex. F4_Other Operating Costs_ Updated_20210429
|
Application and Evidence
|
|
2021-05-01
|
2021-05-01
|
EB-2020-0290
|
OPG_Ex. F3_Corporate Support Services_Updated_20210430
|
Application and Evidence
|
|
2021-05-01
|
2021-05-01
|
EB-2020-0290
|
OPG_Ex. F2-01-01_F2-03-02_Operating Costs_Updated_20210429
|
Application and Evidence
|
|
2021-05-01
|
2021-05-01
|
EB-2020-0290
|
OPG_Ex. E_Production Forecast_Updated_20210429
|
Application and Evidence
|
|
2021-05-01
|
2021-05-01
|
EB-2020-0290
|
OPG_Ex. D3_Corp Support_D4_Capitalization_Updated_20210429
|
Application and Evidence
|
|
2021-05-01
|
2021-05-01
|
EB-2020-0290
|
OPG_Ex. D2-01-01_D2-01-02 Capital Projects Nuclear_Updated_20210429
|
Application and Evidence
|
|
2021-05-01
|
2021-05-01
|
EB-2020-0290
|
OPG_Ex. C_Capitalization Cost of Capital and Nuclear Liabilities_Updated_20210429
|
Application and Evidence
|
|
2021-05-01
|
2021-05-01
|
EB-2020-0290
|
OPG_Ex. B_Rate Base_Updated_20210429
|
Application and Evidence
|
|
2021-05-01
|
2021-05-01
|
EB-2020-0290
|
OPG_Ex. A1-01-01 to A1-03-03_Administrative Documents_Updated_20210430
|
Application and Evidence
|
|
2021-05-01
|
2021-05-01
|
EB-2020-0290
|
OPG_IRR_2K with 2020 Actuals_20210430
|
Interrogatory Response from Applicant
|
|
2021-05-01
|
2021-05-01
|
EB-2020-0290
|
OPG_IRR_CovLtr_Additional IRRs and Updated Evidence_20210430
|
Interrogatory Response from Applicant
|
|
2021-05-01
|
2021-05-01
|
EB-2020-0290
|
OPG_IRR_cvrltr_Confidentiality Request_20210430
|
Interrogatory Response from Applicant
|
|
2021-05-01
|
2021-05-01
|
EB-2020-0290
|
OPG_IRR_CovLtr_Additional IRRs and Updated Evidence_20210430
|
Application and Evidence
|
|
2021-05-03
|
2021-05-03
|
EB-2020-0290
|
OAPPA_Tech_Conference_20210430
|
Correspondence
|
|
2021-04-30
|
2021-04-30
|
EB-2020-0290
|
OPG_Updated Appl_Updated IRR_20210429
|
Application and Evidence
|
|
2021-04-29
|
2021-04-29
|
EB-2020-0290
|
PO 2_dec Motion_OPG_2022-2026_Payment_Amounts_20210429
|
Decision
|
2021-04-29
|
|
2021-04-29
|
EB-2020-0290
|
PO 2_dec Motion_OPG_2022-2026_Payment_Amounts_20210429
|
Procedural Order
|
2021-04-29
|
|
2021-04-29
|
EB-2020-0290
|
VECC_TC_Estimates_OPG_20210429
|
Correspondence
|
|
2021-04-29
|
2021-04-29
|
EB-2020-0290
|
CCC_Topic_TC_OPG_20210429
|
Correspondence
|
|
2021-04-29
|
2021-04-29
|
EB-2020-0290
|
EnergyProbe_Topic_TC_OPG_20210428
|
Correspondence
|
|
2021-04-29
|
2021-04-29
|
EB-2020-0290
|
OEB Staff_Topic_Time Estimates_TC_OPG_20210428
|
Correspondence
|
|
2021-04-29
|
2021-04-29
|
EB-2020-0290
|
CME_Topic_TC_OPG_20210428
|
Correspondence
|
|
2021-04-29
|
2021-04-29
|
EB-2020-0290
|
AMPCO_Topic_TC_OPG_20210428
|
Correspondence
|
|
2021-04-29
|
2021-04-29
|
EB-2020-0290
|
SEC_Topics for Tech Conf_OPG_20210428
|
Correspondence
|
|
2021-04-28
|
2021-04-28
|
EB-2020-0290
|
LPMA_Topics for Tech Conf_OPG_20210428
|
Correspondence
|
|
2021-04-28
|
2021-04-28
|
EB-2020-0290
|
OPG_Addl IRR_cvrltr_20210428
|
Interrogatory Response from Applicant
|
|
2021-04-28
|
2021-04-28
|
EB-2020-0290
|
OPG_Addl IRR_20210428
|
Interrogatory Response from Applicant
|
|
2021-04-28
|
2021-04-28
|
EB-2020-0290
|
ED_Ltr_Time Estimate_TC_OPG_20210428
|
Correspondence
|
|
2021-04-28
|
2021-04-28
|
EB-2020-0290
|
SUP_TC Topics_OPG_20210428
|
Correspondence
|
|
2021-04-28
|
2021-04-28
|
EB-2020-0290
|
OSEA_Ltr_OPG_Tech Conf Topics_20210428
|
Correspondence
|
|
2021-04-28
|
2021-04-28
|
EB-2020-0290
|
ED_Ltr_Resp_OPG Ltr to Motion_20210428
|
Correspondence
|
|
2021-04-28
|
2021-04-28
|
EB-2020-0290
|
OPG_LTR_ED Motion_IRR Refusal_20210427
|
Correspondence
|
|
2021-04-27
|
2021-04-27
|
EB-2020-0290
|
ED_Motion_IRR Refusal_OPG_20210427
|
Motion
|
|
2021-04-27
|
2021-04-27
|
EB-2020-0290
|
OPG_IRR_20210426
|
Interrogatory Response from Applicant
|
|
2021-04-26
|
2021-04-26
|
EB-2020-0290
|
OPG_IRR_cvrltr_Addl IRR_Refusal List Updated_20210426
|
Interrogatory Response from Applicant
|
|
2021-04-26
|
2021-04-26
|
EB-2020-0290
|
OPG_IRR_Ex. L-F2-01_Staff-212_Attach 1_20210426
|
Interrogatory Response from Applicant
|
|
2021-04-25
|
2021-04-25
|
EB-2020-0290
|
OPG_IRR_Ex. L-D2-02_AMPCO-079_20210426
|
Interrogatory Response from Applicant
|
|
2021-04-25
|
2021-04-25
|
EB-2020-0290
|
OPG_IRR_Ex. L-F2-01_Staff-212_Attach 1_20210426
|
Interrogatory Response from Applicant
|
|
2021-04-25
|
2021-04-25
|
EB-2020-0290
|
OPG_IRR_Ex. L-D2-02_AMPCO-079_20210426
|
Interrogatory Response from Applicant
|
|
2021-04-25
|
2021-04-25
|
EB-2020-0290
|
CME_Ltr_IRR Refusal_OPG_20210422
|
Correspondence
|
|
2021-04-22
|
2021-04-22
|
EB-2020-0290
|
ED_Ltr_Disputed IRRs_OPG_20210422
|
Correspondence
|
|
2021-04-22
|
2021-04-22
|
EB-2020-0290
|
Energy Probe_ltr_Response to Refusals_20210422
|
Correspondence
|
|
2021-04-23
|
2021-04-23
|
EB-2020-0290
|
AMPCO_LTR_Response to Refusals_20210422
|
Correspondence
|
|
2021-04-23
|
2021-04-23
|
EB-2020-0290
|
SEC_Ltr OPG Refusal IRR_20210422
|
Correspondence
|
|
2021-04-22
|
2021-04-22
|
EB-2020-0290
|
OAPPA_Letter_IRR_Refusals_2022_2026_Payment_Amounts_20210422
|
Correspondence
|
|
2021-04-22
|
2021-04-22
|
EB-2020-0290
|
OSEA_ltr_OPG IRR_20210422
|
Correspondence
|
|
2021-04-22
|
2021-04-22
|
EB-2020-0290
|
CCC_Ltr_Topic for IRR Refusal Meeting_OPG_20210422
|
Correspondence
|
|
2021-04-22
|
2021-04-22
|
EB-2020-0290
|
OPG_LTR_IRR Inadvertent Disclosure_20210422
|
Correspondence
|
|
2021-04-22
|
2021-04-22
|
EB-2020-0290
|
OEB_Staff_Letter_IRR_Refusals_2022_2026_Payment_Amounts_20210421
|
Correspondence
|
|
2021-04-21
|
2021-04-21
|
EB-2020-0290
|
OPG_IRR_L-A1-03-Staff-004_20210421
|
Interrogatory Response from Applicant
|
|
2021-04-21
|
2021-04-21
|
EB-2020-0290
|
OEB_ltr_OPG Rates 2022-2026_20210421
|
Correspondence
|
2021-04-21
|
|
2021-04-21
|
EB-2020-0290
|
OPG_IRR_cvrltr_Rev_20210419
|
Interrogatory Response from Applicant
|
|
2021-04-20
|
2021-04-20
|
EB-2020-0290
|
OPG_ltr_IRR Inadvertent Disclosure_20210420
|
Correspondence
|
|
2021-04-20
|
2021-04-20
|
EB-2020-0290
|
OPG_IRR_L-F2-01-SEC_123_Attach 1_20210419
|
Interrogatory Response from Applicant
|
|
2021-04-19
|
2021-04-19
|
EB-2020-0290
|
OPG_IRR_L-D2-AMPCO-072 Attach 2_20210419
|
Interrogatory Response from Applicant
|
|
2021-04-19
|
2021-04-19
|
EB-2020-0290
|
OPG_IRR_L-C1-01-Staff-073_Attach 1_20210419
|
Interrogatory Response from Applicant
|
|
2021-04-19
|
2021-04-19
|
EB-2020-0290
|
OPG_IRR_L-C1-01-Staff-068_Attach 1_20210419
|
Interrogatory Response from Applicant
|
|
2021-04-19
|
2021-04-19
|
EB-2020-0290
|
OPG_IRR_Excel Requested Tables_20210419.xlxs
|
Interrogatory Response from Applicant
|
|
2021-04-19
|
2021-04-19
|
EB-2020-0290
|
OPG_IRR_Ex. L-G2, L-H1, L-H2, L-I1_20210419_R
|
Interrogatory Response from Applicant
|
|
2021-04-19
|
2021-04-19
|
EB-2020-0290
|
OPG_IRR_Ex. L-F3-02-Energy Probe-059 to F4-04-VECC-034_20210419
|
Interrogatory Response from Applicant
|
|
2021-04-19
|
2021-04-19
|
EB-2020-0290
|
OPG_IRR_Ex. L-F2-08-Environmental Defence-024_20210419
|
Interrogatory Response from Applicant
|
|
2021-04-19
|
2021-04-19
|
EB-2020-0290
|
OPG_IRR_Ex. L-F2-01-AMPCO-143 to F2-01-VECC-028_20210419
|
Interrogatory Response from Applicant
|
|
2021-04-19
|
2021-04-19
|
EB-2020-0290
|
OPG_IRR_Ex. L-E_20210419
|
Interrogatory Response from Applicant
|
|
2021-04-19
|
2021-04-19
|
EB-2020-0290
|
OPG_IRR_Ex. L-D3 and Ex. L-D4_20210419
|
Interrogatory Response from Applicant
|
|
2021-04-19
|
2021-04-19
|
EB-2020-0290
|
OPG_IRR_Ex. L-D2-02-Staff 105 to D2-02-02 Staff 175_20210419
|
Interrogatory Response from Applicant
|
|
2021-04-19
|
2021-04-19
|
EB-2020-0290
|
OPG_IRR_Ex. L-D2-02-SEC-084_20210419
|
Interrogatory Response from Applicant
|
|
2021-04-19
|
2021-04-19
|
EB-2020-0290
|
OPG_IRR_Ex. L-D2-02-SEC-078_20210419
|
Interrogatory Response from Applicant
|
|
2021-04-19
|
2021-04-19
|
EB-2020-0290
|
OPG_IRR_Ex. L-D2-02-OAPPA-001 to D2-02-SEC 108_20210419
|
Interrogatory Response from Applicant
|
|
2021-04-19
|
2021-04-19
|
EB-2020-0290
|
OPG_IRR_Ex. L-D2-02-CCC-32 to D2-02-Environmental Defence 08_20210419
|
Interrogatory Response from Applicant
|
|
2021-04-19
|
2021-04-19
|
EB-2020-0290
|
OPG_IRR_Ex. L-D2-02-AMPCO-137 Attachments 130-142_20210419
|
Interrogatory Response from Applicant
|
|
2021-04-19
|
2021-04-19
|
EB-2020-0290
|
OPG_IRR_Ex. L-D2-02-AMPCO-137 Attachments 120-129_20210419
|
Interrogatory Response from Applicant
|
|
2021-04-19
|
2021-04-19
|
EB-2020-0290
|
OPG_IRR_Ex. L-D2-02-AMPCO-137 Attachments 116-119_20210419
|
Interrogatory Response from Applicant
|
|
2021-04-19
|
2021-04-19
|
EB-2020-0290
|
OPG_IRR_Ex. L-D2-02-AMPCO-137 Attachments 112-115_20210419
|
Interrogatory Response from Applicant
|
|
2021-04-19
|
2021-04-19
|
EB-2020-0290
|
OPG_IRR_Ex. L-D2-02-AMPCO-137 Attachments 99-111_20210419
|
Interrogatory Response from Applicant
|
|
2021-04-19
|
2021-04-19
|
EB-2020-0290
|
OPG_IRR_Ex. L-D2-02-AMPCO-137 Attachments 87-98_20210419
|
Interrogatory Response from Applicant
|
|
2021-04-19
|
2021-04-19
|
EB-2020-0290
|
OPG_IRR_Ex. L-D2-02-AMPCO-137 Attachments 76-86_20210419
|
Interrogatory Response from Applicant
|
|
2021-04-19
|
2021-04-19
|
EB-2020-0290
|
OPG_IRR_Ex. L-D2-02-AMPCO-137 Attachments 45-75_20210419
|
Interrogatory Response from Applicant
|
|
2021-04-19
|
2021-04-19
|
EB-2020-0290
|
OPG_IRR_Ex. L-D2-02-AMPCO-137 Attachments 23-44_20210419
|
Interrogatory Response from Applicant
|
|
2021-04-19
|
2021-04-19
|
EB-2020-0290
|
OPG_IRR_Ex. L-D2-02-AMPCO-137 Attachments 1-22_20210419
|
Interrogatory Response from Applicant
|
|
2021-04-19
|
2021-04-19
|
EB-2020-0290
|
OPG_IRR_Ex. L-D2-02-AMPCO-131 Attachment 3_20210419
|
Interrogatory Response from Applicant
|
|
2021-04-19
|
2021-04-19
|
EB-2020-0290
|
OPG_IRR_Ex. L-D2-02-AMPCO-131 and Attachments 1,2,4-7 to D2-02-AMPCO-136_20210419
|
Interrogatory Response from Applicant
|
|
2021-04-19
|
2021-04-19
|
EB-2020-0290
|
OPG_IRR_Ex. L-D2-02-AMPCO-106 to D2-02-AMPCO-130_20210419
|
Interrogatory Response from Applicant
|
|
2021-04-19
|
2021-04-19
|
EB-2020-0290
|
OPG_IRR_Ex. L-D2-02-AMPCO-090 to D2-02-AMPCO-105_20210419
|
Interrogatory Response from Applicant
|
|
2021-04-19
|
2021-04-19
|
EB-2020-0290
|
OPG_IRR_Ex. L-D2-02-AMPCO-073 to D2-02-AMPCO-089_20210419
|
Interrogatory Response from Applicant
|
|
2021-04-19
|
2021-04-19
|
EB-2020-0290
|
OPG_IRR_Ex. L-D2-01-SEC-060 to D2-01-VECC-020_20210419
|
Interrogatory Response from Applicant
|
|
2021-04-19
|
2021-04-19
|
EB-2020-0290
|
OPG_IRR_Ex. L-D2-01-Energy Probe-015 to D2-01-SEC-059_20210419
|
Interrogatory Response from Applicant
|
|
2021-04-19
|
2021-04-19
|
EB-2020-0290
|
OPG_IRR_Ex. L-D2-01-AMPCO-029 to D2-01-AMPCO-072_20210419
|
Interrogatory Response from Applicant
|
|
2021-04-19
|
2021-04-19
|
EB-2020-0290
|
OPG_IRR_Ex. L-D2-01-AMPCO-013 to D2-01-AMPCO-027_20210419
|
Interrogatory Response from Applicant
|
|
2021-04-19
|
2021-04-19
|
EB-2020-0290
|
OPG_IRR_Ex. L-C_20210419
|
Interrogatory Response from Applicant
|
|
2021-04-19
|
2021-04-19
|
EB-2020-0290
|
OPG_IRR_Ex. L-B_20210419
|
Interrogatory Response from Applicant
|
|
2021-04-19
|
2021-04-19
|
EB-2020-0290
|
OPG_IRR_Ex. L-A2_20210419
|
Interrogatory Response from Applicant
|
|
2021-04-19
|
2021-04-19
|
EB-2020-0290
|
OPG_IRR_Ex. L-A1_20210419
|
Interrogatory Response from Applicant
|
|
2021-04-19
|
2021-04-19
|
EB-2020-0290
|
Amit Pinhani_LEC_Dec Undertaking_OPG Rates_20210419_Signed
|
Declaration and Undertakings
|
|
2021-04-19
|
2021-04-19
|
EB-2020-0290
|
OEB_staff_ltr_Dec_and_Undertaking_Amit Pinjani_OPG_20210419
|
Declaration and Undertakings
|
|
2021-04-19
|
2021-04-19
|
EB-2020-0290
|
dec_Confidentiality req_perm redac_OPG Rates_20210415
|
Decision
|
2021-04-15
|
|
2021-04-15
|
EB-2020-0290
|
OAPPA_Dec and Undertaking_OPG Rates_20210414
|
Declaration and Undertakings
|
|
2021-04-14
|
2021-04-14
|
EB-2020-0290
|
CME_Dec and Undertaking_OPG_20210414
|
Declaration and Undertakings
|
|
2021-04-14
|
2021-04-14
|
EB-2020-0290
|
Jupiter Energy_cvrltr_Dec Undertaking_OPG_20210414
|
Declaration and Undertakings
|
|
2021-04-14
|
2021-04-14
|
EB-2020-0290
|
Gia De Julio_Dec_Undertaking_OPG_20210414
|
Declaration and Undertakings
|
|
2021-04-14
|
2021-04-14
|
EB-2020-0290
|
dec on Confidentiality req_OPG Rates_20210413
|
Decision
|
2021-04-13
|
|
2021-04-13
|
EB-2020-0290
|
Neil McCauley_Ltr of Comment_OPG Rates_20210324_Redacted
|
Letter of Comment
|
|
2021-03-25
|
2021-03-25
|