Search Results for: Records - Case Number=eb-2009-0096 - 391 Records Found
The document result list has reached its limit of 10,000 records. Please refine your search criteria to view more records.
Sorting Your Search Results
The most recent documents automatically show at the top. To sort by different categories (e.g. by Document Type) click the column header. Click it again to switch between ascending/descending order.
Case Information
Click the case number to view details for that proceeding.
Case Number | File Name | Document Type | Applicant | Issued By OEB | Received By OEB | Date Issued/Received |
---|---|---|---|---|---|---|
EB-2009-0096 | IESO_RGCRP_2010_Total Payments_20110117 | Correspondence | Hydro One Networks Inc. - Electricity Distributor | 2011-01-17 | 2011-01-17 | |
EB-2009-0096 | Rate Order_HONI_20101221 | Rate Order | Hydro One Networks Inc. - Electricity Distributor | 2010-12-21 | 2010-12-21 | |
EB-2009-0096 | HONI_DRF_RO_20101217 | Draft Rate Order | Hydro One Networks Inc. - Electricity Distributor | 2010-12-17 | 2010-12-17 | |
EB-2009-0096 | dec_order_distribution_rate_HONI_20101216 | Decision and Order | Hydro One Networks Inc. - Electricity Distributor | 2010-12-16 | 2010-12-16 | |
EB-2009-0096 | Energy Probe_Comments_HONI DRO_20101207 | Comments | Hydro One Networks Inc. - Electricity Distributor | 2010-12-08 | 2010-12-08 | |
EB-2009-0096 | Brdstaff_DRO Comments_HONI_20101208 | Comments | Hydro One Networks Inc. - Electricity Distributor | 2010-12-08 | 2010-12-08 | |
EB-2009-0096 | HONI_LTR_Direct_Benefits_20101207 | Correspondence | Hydro One Networks Inc. - Electricity Distributor | 2010-12-07 | 2010-12-07 | |
EB-2009-0096 | VECC_Comments_DRO_HONI_20101207 | Comments | Hydro One Networks Inc. - Electricity Distributor | 2010-12-07 | 2010-12-07 | |
EB-2009-0096 | PO 5_Hydro One Dx _20101130 | Procedural Order | Hydro One Networks Inc. - Electricity Distributor | 2010-11-30 | 2010-11-30 | |
EB-2009-0096 | HONI_Draft_RO_20101129 | Draft Rate Order | Hydro One Networks Inc. - Electricity Distributor | 2010-11-29 | 2010-11-29 | |
EB-2009-0096 | ECAO_Cert of Destruction_HONI_20101028 | Correspondence | Hydro One Networks Inc. - Electricity Distributor | 2010-10-28 | 2010-10-28 | |
EB-2009-0096 | Supplemental_dec_order_Cost_Awards_HONI_20100721 | Decision and Order on Cost Awards | Hydro One Networks Inc. - Electricity Distributor | 2010-07-21 | 2010-07-21 | |
EB-2009-0096 | CME_LTR_Hydro One_20100618 | Correspondence | Hydro One Networks Inc. - Electricity Distributor | 2010-06-18 | 2010-06-18 | |
EB-2009-0096 | dec_order_Cost Awards_HONI_20100617 | Decision and Order on Cost Awards | Hydro One Networks Inc. - Electricity Distributor | 2010-06-17 | 2010-06-17 | |
EB-2009-0096 | CME_Comments_CostClaim_20100526 | Cost Claim Objection Reply | Hydro One Networks Inc. - Electricity Distributor | 2010-05-26 | 2010-05-26 | |
EB-2009-0096 | HONI_Ltr_Cost_Objection_REPLY_20100507 | Cost Claim Objection | Hydro One Networks Inc. - Electricity Distributor | 2010-05-07 | 2010-05-07 | |
EB-2009-0096 | Rate Order_HONI_20100429 | Rate Order | Hydro One Networks Inc. - Electricity Distributor | 2010-04-29 | 2010-04-29 | |
EB-2009-0096 | HONI_DRO_Comments_Response_20100428 | Comments | Hydro One Networks Inc. - Electricity Distributor | 2010-04-28 | 2010-04-28 | |
EB-2009-0096 | CCC_Comments_DRO_HONI_20100427 | Comments | Hydro One Networks Inc. - Electricity Distributor | 2010-04-27 | 2010-04-27 | |
EB-2009-0096 | HONI_Consolidated Rate Schedule_20100427 | Submission | Hydro One Networks Inc. - Electricity Distributor | 2010-04-27 | 2010-04-27 | |
EB-2009-0096 | HONI_DRO_Comments_Response_20100426 | Correspondence | Hydro One Networks Inc. - Electricity Distributor | 2010-04-26 | 2010-04-26 | |
EB-2009-0096 | Bdstaff_Comments_DRO_HONI_20100423 | Comments | Hydro One Networks Inc. - Electricity Distributor | 2010-04-23 | 2010-04-23 | |
EB-2009-0096 | EnergyProbe_Comments_HONI_DRO_20100423 | Comments | Hydro One Networks Inc. - Electricity Distributor | 2010-04-23 | 2010-04-23 | |
EB-2009-0096 | CME_Comments_HONI_DRO_20100422 | Comments | Hydro One Networks Inc. - Electricity Distributor | 2010-04-22 | 2010-04-22 | |
EB-2009-0096 | HONI_DRO_Exhibit 3.0 Update_20100422 | Draft Rate Order | Hydro One Networks Inc. - Electricity Distributor | 2010-04-22 | 2010-04-22 | |
EB-2009-0096 | HONI_DRO_Exhibit 2.2 Update_20100422 | Draft Rate Order | Hydro One Networks Inc. - Electricity Distributor | 2010-04-22 | 2010-04-22 | |
EB-2009-0096 | HONI_DRO_Update_Cvrltr_20100422 | Draft Rate Order | Hydro One Networks Inc. - Electricity Distributor | 2010-04-22 | 2010-04-22 | |
EB-2009-0096 | AMPCO_LTR_HONI_DRO_20100421 | Comments | Hydro One Networks Inc. - Electricity Distributor | 2010-04-22 | 2010-04-22 | |
EB-2009-0096 | vecc_comments_HONI_DRO_20100421 | Comments | Hydro One Networks Inc. - Electricity Distributor | 2010-04-21 | 2010-04-21 | |
EB-2009-0096 | HONI_Continuity Sch_20100421 | Correspondence | Hydro One Networks Inc. - Electricity Distributor | 2010-04-21 | 2010-04-21 | |
EB-2009-0096 | DRO-Exhibit 3_Acquired Rate Schedules_20100419 | Draft Rate Order | Hydro One Networks Inc. - Electricity Distributor | 2010-04-19 | 2010-04-19 | |
EB-2009-0096 | HONI_DRO_20100422 | Draft Rate Order | Hydro One Networks Inc. - Electricity Distributor | 2010-04-22 | 2010-04-22 | |
EB-2009-0096 | HONI_ltr_dec_Actions_20100416 | Correspondence | Hydro One Networks Inc. - Electricity Distributor | 2010-04-16 | 2010-04-16 | |
EB-2009-0096 | Dec_Reasons_HONI_20100409 | Decision With Reasons | Hydro One Networks Inc. - Electricity Distributor | 2010-04-09 | 2010-04-09 | |
EB-2009-0096 | Board ltr_HON1_Lockup_20100407 | Correspondence | Hydro One Networks Inc. - Electricity Distributor | 2010-04-07 | 2010-04-07 | |
EB-2009-0096 | Partial_dec_HONI_20100218 | Decision | Hydro One Networks Inc. - Electricity Distributor | 2010-02-18 | 2010-02-18 | |
EB-2009-0096 | HONI_ReplyARG_20100212 | Applicant Reply Argument | Hydro One Networks Inc. - Electricity Distributor | 2010-02-16 | 2010-02-16 | |
EB-2009-0096 | VECC_Final ARG_HONI_20100205 | Final Argument | Hydro One Networks Inc. - Electricity Distributor | 2010-02-08 | 2010-02-08 | |
EB-2009-0096 | PWU_Final ARG_HONI_20100205 | Final Argument | Hydro One Networks Inc. - Electricity Distributor | 2010-02-05 | 2010-02-05 | |
EB-2009-0096 | EnergyProbe_Final ARG_HONI_20100205 | Final Argument | Hydro One Networks Inc. - Electricity Distributor | 2010-02-05 | 2010-02-05 | |
EB-2009-0096 | CCC_Final ARG_HONI_20100208 | Final Argument | Hydro One Networks Inc. - Electricity Distributor | 2010-02-08 | 2010-02-08 | |
EB-2009-0096 | SEC_FinalARG_HONI_20100208 | Final Argument | Hydro One Networks Inc. - Electricity Distributor | 2010-02-08 | 2010-02-08 | |
EB-2009-0096 | CME_Final ARG_HONI_20100205 | Final Argument | Hydro One Networks Inc. - Electricity Distributor | 2010-02-08 | 2010-02-08 | |
EB-2009-0096 | SEP_Final ARG_HONI_20100205 | Final Argument | Hydro One Networks Inc. - Electricity Distributor | 2010-02-05 | 2010-02-05 | |
EB-2009-0096 | AMPCO_FinalARG_HONI_20100205 | Final Argument | Hydro One Networks Inc. - Electricity Distributor | 2010-02-08 | 2010-02-08 | |
EB-2009-0096 | SEP_Final ARG_HONI_20100205 | Final Argument | Hydro One Networks Inc. - Electricity Distributor | 2010-02-05 | 2010-02-05 | |
EB-2009-0096 | SEP_Final ARG_cvrltr_HONI_20100205 | Final Argument | Hydro One Networks Inc. - Electricity Distributor | 2010-02-05 | 2010-02-05 | |
EB-2009-0096 | PWU_Final ARG_HONI_20100205 | Final Argument | Hydro One Networks Inc. - Electricity Distributor | 2010-02-05 | 2010-02-05 | |
EB-2009-0096 | Hopper Foundry_Final ARG_HONI_20100205 | Final Argument | Hydro One Networks Inc. - Electricity Distributor | 2010-02-05 | 2010-02-05 | |
EB-2009-0096 | Brd_ltr_Filing Deadline_20100205 | Correspondence | Hydro One Networks Inc. - Electricity Distributor | 2010-02-05 | 2010-02-05 | |
EB-2009-0096 | Rogers_FinalARG_HONI_20100205 | Final Argument | Hydro One Networks Inc. - Electricity Distributor | 2010-02-05 | 2010-02-05 | |
EB-2009-0096 | ECAO_FinalARG_HONI_20100205 | Final Argument | Hydro One Networks Inc. - Electricity Distributor | 2010-02-05 | 2010-02-05 | |
EB-2009-0096 | HONI_SUB_ARG_extension_20100205 | Correspondence | Hydro One Networks Inc. - Electricity Distributor | 2010-02-05 | 2010-02-05 | |
EB-2009-0096 | CCC_delay in filing ARG_20100205 | Correspondence | Hydro One Networks Inc. - Electricity Distributor | 2010-02-05 | 2010-02-05 | |
EB-2009-0096 | David Crocker_Comments_SEC Extension_HONI_20100205 | Correspondence | Hydro One Networks Inc. - Electricity Distributor | 2010-02-05 | 2010-02-05 | |
EB-2009-0096 | Peter Thompson_Comments_SEC Extension_HONI_20100204 | Correspondence | Hydro One Networks Inc. - Electricity Distributor | 2010-02-04 | 2010-02-04 | |
EB-2009-0096 | SEP_ltr_SEC Req for Extension_HONI_20100204 | Correspondence | Hydro One Networks Inc. - Electricity Distributor | 2010-02-04 | 2010-02-04 | |
EB-2009-0096 | SEC_Req_Extension_Final Argument_HONI_20100204 | Correspondence | Hydro One Networks Inc. - Electricity Distributor | 2010-02-04 | 2010-02-04 | |
EB-2009-0096 | Pollution Probe_ARG_HONI_20100204 | Final Argument | Hydro One Networks Inc. - Electricity Distributor | 2010-02-04 | 2010-02-04 | |
EB-2009-0096 | GEC_FinalARG_HONI_20100202 | Final Argument | Hydro One Networks Inc. - Electricity Distributor | 2010-02-02 | 2010-02-02 | |
EB-2009-0096 | Brdstaff_SUB_HONI_20100201 | Submission | Hydro One Networks Inc. - Electricity Distributor | 2010-02-01 | 2010-02-01 | |
EB-2009-0096 | Board_ltr_HONI_Issue 9_3_20100120 | Correspondence | Hydro One Networks Inc. - Electricity Distributor | 2010-01-20 | 2010-01-20 | |
EB-2009-0096 | HONI_SUB_Proposal on Issue 9.3_20100118 | Submission | Hydro One Networks Inc. - Electricity Distributor | 2010-01-18 | 2010-01-18 | |
EB-2009-0096 | HONI_Undertaking Response_J2.2_2010-2011_cap Rev Gen Smart Grid_20100115 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2010-01-15 | 2010-01-15 | |
EB-2009-0096 | HONI_Undertaking Response_J2.3_Explain CAL_H-13-2_20100115 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2010-01-15 | 2010-01-15 | |
EB-2009-0096 | HONI_Undertaking Response_J9.1_Van Dusen_Transcript Comment_20100115 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2010-01-15 | 2010-01-15 | |
EB-2009-0096 | HONI_Undertaking Response_J9.2_ROE Mitigation_20100115 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2010-01-15 | 2010-01-15 | |
EB-2009-0096 | HONI_Undertaking Response_J9.3_2010 Rates_201001015 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2010-01-15 | 2010-01-15 | |
EB-2009-0096 | HONI_Undertaking Response_J9.4_Customer Rate Impact_20100115 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2010-01-15 | 2010-01-15 | |
EB-2009-0096 | HONI_Undertaking Response_J9.5_Bill Impact Mitigation Account_20100115 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2010-01-15 | 2010-01-15 | |
EB-2009-0096 | HONI_Undertaking Response_J9.6_Deferred Pension Costs_20100115 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2010-01-15 | 2010-01-15 | |
EB-2009-0096 | HONI_Undertaking Response_J9.7_OEB Cost Account_20100115 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2010-01-15 | 2010-01-15 | |
EB-2009-0096 | HONI_Undertaking Response_J10.1_H-12-2_Att_1_Table 1_20100115 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2010-01-15 | 2010-01-15 | |
EB-2009-0096 | HONI_Undertaking Response_J10.2_H-12-2_Att_1_Table B5_20100115 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2010-01-15 | 2010-01-15 | |
EB-2009-0096 | HONI_Undertaking Response_J10.3_Confidence Range_20100115 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2010-01-15 | 2010-01-15 | |
EB-2009-0096 | HONI_Undertaking Response_J10.4_Rev_Return_20100115 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2010-01-15 | 2010-01-15 | |
EB-2009-0096 | HONI_Undertaking Response_J10.6_Rate Calculation_20100115 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2010-01-15 | 2010-01-15 | |
EB-2009-0096 | HONI_Undertaking Response_J10.7_Short Term Debt Rates_20100115 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2010-01-15 | 2010-01-15 | |
EB-2009-0096 | HONI_Undertaking Response_J10.8_CIAS Increase_20100115 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2010-01-15 | 2010-01-15 | |
EB-2009-0096 | HONI_IRR_H-13-02_20100115 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2010-01-15 | 2010-01-15 | |
EB-2009-0096 | HONI_Undertaking Response_J4.4_Rerun Rable_E-1-1-1_20100115 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2010-01-15 | 2010-01-15 | |
EB-2009-0096 | HONI_Ltr_Undertaking Response_20100115 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2010-01-15 | 2010-01-15 | |
EB-2009-0096 | Transcript_HONI_Volume 11_20100114 | Transcripts | Hydro One Networks Inc. - Electricity Distributor | 2010-01-14 | 2010-01-14 | |
EB-2009-0096 | HONI_Undertaking Response_J10.5_Cost Reductions_Cost of Capital_20100111 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2010-01-14 | 2010-01-14 | |
EB-2009-0096 | Exhibit_K9.2_Hopper_HONI_Communication_20100110 | Exhibits | Hydro One Networks Inc. - Electricity Distributor | 2010-01-07 at 4:56 PM | ||
EB-2009-0096 | Transcript_HONI_Day 10_20100112 | Transcripts | Hydro One Networks Inc. - Electricity Distributor | 2010-01-12 | 2010-01-12 | |
EB-2009-0096 | HONI_Ex_K9.2_Hopper_Summary_20100111 | Exhibits | Hydro One Networks Inc. - Electricity Distributor | 2010-01-11 | 2010-01-11 | |
EB-2009-0096 | Transcript_HONI_Day 9_20100111 | Transcripts | Hydro One Networks Inc. - Electricity Distributor | 2010-01-11 | 2010-01-11 | |
EB-2009-0096 | CCC_Notice of Motion_HONI Rates_20100108 | Motion | Hydro One Networks Inc. - Electricity Distributor | 2010-01-08 | 2010-01-08 | |
EB-2009-0096 | HONI_Undertaking Response_J8.4_Increased Staffing_20100116 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2010-01-06 | 2010-01-06 | |
EB-2009-0096 | HONI_Ltr_Undertaking_Exhibits_20100106 | Correspondence | Hydro One Networks Inc. - Electricity Distributor | 2010-01-06 | 2010-01-06 | |
EB-2009-0096 | HONI_Exhibit_K9.1_Updated Rate Sch_20100111 | Exhibits | Hydro One Networks Inc. - Electricity Distributor | 2010-01-06 | 2010-01-06 | |
EB-2009-0096 | HONI_Undertaking Response_J8.7_Optimization Discussion_20091223 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2009-12-23 | 2009-12-23 | |
EB-2009-0096 | HONI_Undertaking Response_J8.6_Wholesale_Non-RPP_20091223 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2009-12-23 | 2009-12-23 | |
EB-2009-0096 | HONI_Undertaking Response_J8.5_Bimonthly to Monthly Billing_20091223 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2009-12-23 | 2009-12-23 | |
EB-2009-0096 | HONI_Undertaking Response_J8.3_Renewable Generation Forecast_20091223 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2009-12-23 | 2009-12-23 | |
EB-2009-0096 | HONI_Undertaking Response_J8.2_work Done on Assets_20091223 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2009-12-23 | 2009-12-23 | |
EB-2009-0096 | HONI_Undertaking Response_J8.1_Reduction In Services_20091223 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2009-12-23 | 2009-12-23 | |
EB-2009-0096 | HONI_Undertaking Response_J7.7_Breakdown of Increased Costs in HR_20091223 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2009-12-23 | 2009-12-23 | |
EB-2009-0096 | HONI_Undertaking Response_J7.5_Eight Year Cycle to Seven Year Cycle_20091223 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2009-12-23 | 2009-12-23 | |
EB-2009-0096 | HONI_Undertaking Response_J7.4_Increase Expenditures_20091223 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2009-12-23 | 2009-12-23 | |
EB-2009-0096 | HONI_Undertaking Response_J7.2_Recalculate EP IR 23_20091223 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2009-12-23 | 2009-12-23 | |
EB-2009-0096 | HONI_Undertaking Response_J7.1_Update EP IR 23 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2009-12-23 | 2009-12-23 | |
EB-2009-0096 | HONI_Undertaking Response_J6.5_Labelled Enhancements_20091223 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2009-12-23 | 2009-12-23 | |
EB-2009-0096 | HONI_Ltr_Undertaking Responses_20091223 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2009-12-23 | 2009-12-23 | |
EB-2009-0096 | HONI_Undertaking Response_J7.6_EB2-009-0272_Exhibit I_Tab_1_Schedule 41_20091218 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2009-12-21 | 2009-12-21 | |
EB-2009-0096 | HONI_Undertaking Response_J7.3_Reduction in Compensation_20091218 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2009-12-21 | 2009-12-21 | |
EB-2009-0096 | HONI_Undertaking Response_J6.7_Budget System Innovation Program_20091218 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2009-12-21 | 2009-12-21 | |
EB-2009-0096 | HONI_Undertaking Response_J6.6 Poles Replaced_20091218 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2009-12-21 | 2009-12-21 | |
EB-2009-0096 | HONI_Undertaking Response_J6.4_DX System Innovation Program_20091218 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2009-12-21 | 2009-12-21 | |
EB-2009-0096 | HONI_Undertaking Response_K6.3_Backlog_20091218 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2009-12-21 | 2009-12-21 | |
EB-2009-0096 | HONI_Undertaking Response_J6.2_Number of Cost of Defects_20091218 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2009-12-21 | 2009-12-21 | |
EB-2009-0096 | HONI_Undertaking Response_J6.1_Spending levels-20091221 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2009-12-21 | 2009-12-21 | |
EB-2009-0096 | Transcript_HONI_20091218 | Transcripts | Hydro One Networks Inc. - Electricity Distributor | 2009-12-18 | 2009-12-18 | |
EB-2009-0096 | HONI_Undertaking Response_J6.9_Overtime and Labour_Dollars_20091217 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2009-12-18 | 2009-12-18 | |
EB-2009-0096 | HONI_Undertaking Response_J6.8_Benchmark Performance_20091217 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2009-12-18 | 2009-12-18 | |
EB-2009-0096 | HONI_Undertaking Response_J5.1_Number Employed in Control Room_20091217 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2009-12-18 | 2009-12-18 | |
EB-2009-0096 | HONI_Undertaking Response_J4.8_Performance Rankings_20091217 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2009-12-18 | 2009-12-18 | |
EB-2009-0096 | HONI_Undertaking Response_J3.2_Risks in GEP_20091217 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2009-12-18 | 2009-12-18 | |
EB-2009-0096 | HONI_Undertaking Response_J3.1_GEP in DX System Assess_20091217 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2009-12-18 | 2009-12-18 | |
EB-2009-0096 | HONI_Undertaking Response_J1.6_OPA_Takeup for FIT_20091217 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2009-12-18 | 2009-12-18 | |
EB-2009-0096 | Transcript_HONI_20091217 | Transcripts | Hydro One Networks Inc. - Electricity Distributor | 2009-12-17 | 2009-12-17 | |
EB-2009-0096 | HONI_Undertaking Response_J4.5_Memorandum of Agreement_20091215 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2009-12-15 | 2009-12-15 | |
EB-2009-0096 | HONI_Undertaking Response_J4.6_Impact of Updating Interest Rates_20091215 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2009-12-15 | 2009-12-15 | |
EB-2009-0096 | HONI_Undertaking Response_J4.2_Rev Req Change_J4.3_E-1-1_Tables_20091215 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2009-12-15 | 2009-12-15 | |
EB-2009-0096 | HONI_Undertaking Response_J4.7_Plan Assets Value_20091215 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2009-12-15 | 2009-12-15 | |
EB-2009-0096 | Transcript_HONI_20091215 | Transcripts | Hydro One Networks Inc. - Electricity Distributor | 2009-12-15 | 2009-12-15 | |
EB-2009-0096 | SEC_SUB_HONI_20091215 | Submission | Hydro One Networks Inc. - Electricity Distributor | 2009-12-15 | 2009-12-15 | |
EB-2009-0096 | HONI_EX_J4.4_rerun_tables_E1-1-1_20091214 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2009-12-14 | 2009-12-14 | |
EB-2009-0096 | Transcript_HONI_20091214 | Transcripts | Hydro One Networks Inc. - Electricity Distributor | 2009-12-14 | 2009-12-14 | |
EB-2009-0096 | HONI_Ex_K4.4_Excerpts_from_EB-2007-0681_G2-1-1_20091211 | Exhibits | Hydro One Networks Inc. - Electricity Distributor | 2009-12-11 | 2009-12-11 | |
EB-2009-0096 | HONI_Ex_K4.2_Risk_Instructions_Presentation_20091211 | Exhibits | Hydro One Networks Inc. - Electricity Distributor | 2009-12-11 | 2009-12-11 | |
EB-2009-0096 | Transcript_REDACTED_HONI_20091211 | Transcripts | Hydro One Networks Inc. - Electricity Distributor | 2009-12-11 | 2009-12-11 | |
EB-2009-0096 | HONI_EX_K3.1_Summary of Confidential Documents_20091210 | Exhibits | Hydro One Networks Inc. - Electricity Distributor | 2009-12-11 | 2009-12-11 | |
EB-2009-0096 | HONI_EX_K2.5_Excerpts_H-9-44_Att1_20091208 | Exhibits | Hydro One Networks Inc. - Electricity Distributor | 2009-12-11 | 2009-12-11 | |
EB-2009-0096 | HONI_EX_K2.4_Excerpts_H-13-1_Att2_20091208 | Exhibits | Hydro One Networks Inc. - Electricity Distributor | 2009-12-11 | 2009-12-11 | |
EB-2009-0096 | HONI_EX_K2.3_Excerpts_H-13-1_Att1_20091207 | Exhibits | Hydro One Networks Inc. - Electricity Distributor | 2009-12-11 | 2009-12-11 | |
EB-2009-0096 | HONI_EX_K2.2_Excerpt from_EB-2007-0681_20091207 | Exhibits | Hydro One Networks Inc. - Electricity Distributor | 2009-12-11 | 2009-12-11 | |
EB-2009-0096 | HONI_EX_K2.1_Summary of Confidential Document_20091207 | Exhibits | Hydro One Networks Inc. - Electricity Distributor | 2009-12-11 | 2009-12-11 | |
EB-2009-0096 | GEC_K1.3_Exhibit_Day 1_20091208 | Exhibits | Hydro One Networks Inc. - Electricity Distributor | 2009-12-11 | 2009-12-11 | |
EB-2009-0096 | HONI_Ex_J2.2_2010-2011_cap_rev_gen_smart_grid_20091210 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2009-12-11 | 2009-12-11 | |
EB-2009-0096 | HONI_Ex_J2.1_explain_H-1-146_20091210 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2009-12-11 | 2009-12-11 | |
EB-2009-0096 | HONI_Ex_J1.5_FIT_contract_assumptions_20091210 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2009-12-11 | 2009-12-11 | |
EB-2009-0096 | HONI_Ex_J1.4_time_btw_CCA_and_in-service_20091210 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2009-12-11 | 2009-12-11 | |
EB-2009-0096 | HONI_Ex_J1.3_Breakdown_RESOP_Projects_20091210 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2009-12-11 | 2009-12-11 | |
EB-2009-0096 | HONI_Ex_J2.3_explain_cal_H-13-2_20091210 | Undertaking Responses | Hydro One Networks Inc. - Electricity Distributor | 2009-12-11 | 2009-12-11 | |
EB-2009-0096 | Transcript_Day 3_HONI_20091210 | Transcripts | Hydro One Networks Inc. - Electricity Distributor | 2009-12-10 | 2009-12-10 | |
EB-2009-0096 | Transcript_HONI_20091208 | Transcripts | Hydro One Networks Inc. - Electricity Distributor | 2009-12-08 | 2009-12-08 | |
EB-2009-0096 | Transcript_HONI_20091207 | Transcripts | Hydro One Networks Inc. - Electricity Distributor | 2009-12-07 | 2009-12-07 | |
EB-2009-0096 | Brd ltr_Conf_IRR_Hydro One_20091204 | Correspondence | Hydro One Networks Inc. - Electricity Distributor | 2009-12-04 | 2009-12-04 | |
EB-2009-0096 | HONI_CONSOLIDATED_20091202 | Application and Evidence | Hydro One Networks Inc. - Electricity Distributor | 2009-12-02 at 6:06 PM | ||
EB-2009-0096 | SEC_IRR_HONI_20091130 | Interrogatory Response from Intervenor | Hydro One Networks Inc. - Electricity Distributor | 2009-11-30 | 2009-11-30 | |
EB-2009-0096 | HONI_IRR_20091130 | Interrogatory Response from Applicant | Hydro One Networks Inc. - Electricity Distributor | 2009-11-30 | 2009-11-30 | |
EB-2009-0096 | OFA_Intervention_ltr_20091126 | Intervenor Request Objection | Hydro One Networks Inc. - Electricity Distributor | 2009-11-26 | 2009-11-26 | |
EB-2009-0096 | OFA_Intervention_REQ_HONI_20091109 | Intervenor Request Letter | Hydro One Networks Inc. - Electricity Distributor | 2009-11-25 | 2009-11-25 | |
EB-2009-0096 | SEC_IRR_HONI_Brdstaff_VECC_20091126 | Interrogatory Response from Intervenor | Hydro One Networks Inc. - Electricity Distributor | 2009-11-26 | 2009-11-26 | |
EB-2009-0096 | SEC_IRR_HONI_Brdstaff_VECC_20091126 | Interrogatory Response from Intervenor | Hydro One Networks Inc. - Electricity Distributor | 2009-11-26 | 2009-11-26 | |
EB-2009-0096 | PO#4_HONI_APX_20091125 | Procedural Order | Hydro One Networks Inc. - Electricity Distributor | 2009-11-25 | 2009-11-25 | |
EB-2009-0096 | HONI_Settlement_Proposal_20091123 | Settlement Proposal | Hydro One Networks Inc. - Electricity Distributor | 2009-11-23 | 2009-11-23 | |
EB-2009-0096 | Hopper Foundry_Ltr_20091113 | Correspondence | Hydro One Networks Inc. - Electricity Distributor | 2009-11-13 | 2009-11-13 | |
EB-2009-0096 | HONI_IRR_20091111 | Interrogatory Response from Applicant | Hydro One Networks Inc. - Electricity Distributor | 2009-11-11 | 2009-11-11 | |
EB-2009-0096 | Brdstaff_IR_SEC_EVD_HONI_20091110 | Interrogatories to Intervenor | Hydro One Networks Inc. - Electricity Distributor | 2009-11-10 | 2009-11-10 | |
EB-2009-0096 | HONI_IR_EVD_SEC_20091105 | Interrogatories to Intervenor | Hydro One Networks Inc. - Electricity Distributor | 2009-11-09 at 3:26 PM | ||
EB-2009-0096 | VECC_IR_SEC_HONI_20091109 | Interrogatories to Intervenor | Hydro One Networks Inc. - Electricity Distributor | 2009-11-09 at 12:55 PM | ||
EB-2009-0096 | VECC_IR_SEC_HONI_20091109 | Interrogatories to Intervenor | Hydro One Networks Inc. - Electricity Distributor | 2009-11-09 | 2009-11-09 | |
EB-2009-0096 | HONI_IR_EVD_SEC_20091105 | Interrogatories to Intervenor | Hydro One Networks Inc. - Electricity Distributor | 2009-11-05 | 2009-11-05 | |
EB-2009-0096 | SEP_ltr_Hearing Dates_20091030 | Correspondence | Hydro One Networks Inc. - Electricity Distributor | 2009-11-04 at 12:45 PM | ||
EB-2009-0096 | po_3_HONI_20091103 | Procedural Order | Hydro One Networks Inc. - Electricity Distributor | 2009-11-03 | 2009-11-03 | |
EB-2009-0096 | HONI_IRR_ltr_20091030 | Correspondence | Hydro One Networks Inc. - Electricity Distributor | 2009-10-30 at 3:20 PM | ||
EB-2009-0096 | HONI_IRR_20091019 | Interrogatory Response from Applicant | Hydro One Networks Inc. - Electricity Distributor | 2009-10-30 at 8:56 AM | ||
EB-2009-0096 | SEC_EVD_HONI_20091028 | Intervenor Evidence | Hydro One Networks Inc. - Electricity Distributor | 2009-10-28 at 4:11 PM | ||
EB-2009-0096 | HONI_IRR_20091027 | Interrogatory Response from Applicant | Hydro One Networks Inc. - Electricity Distributor | 2009-10-27 at 4:29 PM | ||
EB-2009-0096 | HONI_IRR_20091027 | Interrogatory Response from Applicant | Hydro One Networks Inc. - Electricity Distributor | 2009-10-27 at 12:51 PM | ||
EB-2009-0096 | Todd Plant_Comment_HONI_20091026 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-10-27 at 9:11 AM | ||
EB-2009-0096 | Tammy Hughes_Comments_HONI_20091026 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-10-27 at 9:10 AM | ||
EB-2009-0096 | SEC_ltr_Hearing Dates_HONI_20091026 | Correspondence | Hydro One Networks Inc. - Electricity Distributor | 2009-10-26 | 2009-10-26 | |
EB-2009-0096 | HONI_ltr_Hearing Schedule_20091026 | Correspondence | Hydro One Networks Inc. - Electricity Distributor | 2009-10-27 at 9:02 AM | ||
EB-2009-0096 | HONI_LTR_Confidential_Filing_20091022 | Correspondence | Hydro One Networks Inc. - Electricity Distributor | 2009-10-22 | 2009-10-22 | |
EB-2009-0096 | SEC_ltr_Filing_evidence_20091020 | Correspondence | Hydro One Networks Inc. - Electricity Distributor | 2009-10-20 at 5:14 PM | ||
EB-2009-0096 | SEC_ltr_Filing_evidence_20091020 | Correspondence | Hydro One Networks Inc. - Electricity Distributor | 2009-10-20 | 2009-10-20 | |
EB-2009-0096 | HONI_IRR_20091019 | Interrogatory Response from Applicant | Hydro One Networks Inc. - Electricity Distributor | 2009-10-20 at 10:35 AM | ||
EB-2009-0096 | North Western Ontario Tourism Assn_Comments_HONI_20091008 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-10-08 at 4:28 PM | ||
EB-2009-0096 | David Lengyel_Comments_HONI_20090827 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-10-05 at 12:12 PM | ||
EB-2009-0096 | Glenna Penner_Comments_HONI_20091006 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-10-05 at 2:54 PM | ||
EB-2009-0096 | A Proudfoot_Comments_HONI_20091006 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-10-05 at 2:41 PM | ||
EB-2009-0096 | MDowns_Comments_HONI_20091007 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-10-05 at 2:42 PM | ||
EB-2009-0096 | Lorne G Crawford_Comments_HONI_20091007 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-10-05 at 12:11 PM | ||
EB-2009-0096 | J London_Comments_HONI_20091007 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-10-05 at 11:56 AM | ||
EB-2009-0096 | Gwen Perkins_Comments_HONI_20091008 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-10-07 | 2009-10-07 | |
EB-2009-0096 | Elaine Trotter_Comments_HONI_20090927 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-10-08 at 11:13 AM | ||
EB-2009-0096 | Brenda Honan_Comment_HONI_20090831 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-10-06 at 1:35 PM | ||
EB-2009-0096 | Town of Rainy River_Comment_HONI_20090902 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-10-06 at 1:28 PM | ||
EB-2009-0096 | Helen Roy_Comment_HONI_20091006 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-10-06 at 1:33 PM | ||
EB-2009-0096 | G Cappolo_Comment_HONI_20090827 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-10-06 at 1:36 PM | ||
EB-2009-0096 | E Hansen_Comment_HONI_20090902 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-10-06 at 1:30 PM | ||
EB-2009-0096 | E Carson_Comment_HONI_20090827 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-10-06 at 1:34 PM | ||
EB-2009-0096 | Energy Probe_IR_Part Two_HONI_20091002 | Interrogatories to Applicant | Hydro One Networks Inc. - Electricity Distributor | 2009-10-05 at 1:20 PM | ||
EB-2009-0096 | Energy Probe_IR_Part Two_HONI_20091002 | Interrogatories to Applicant | Hydro One Networks Inc. - Electricity Distributor | 2009-10-03 | 2009-10-03 | |
EB-2009-0096 | SEC_IR_HONI_20091002 | Interrogatories to Applicant | Hydro One Networks Inc. - Electricity Distributor | 2009-10-02 at 4:33 PM | ||
EB-2009-0096 | SEC_IR_HONI_20091002 | Interrogatories to Applicant | Hydro One Networks Inc. - Electricity Distributor | 2009-10-02 | 2009-10-02 | |
EB-2009-0096 | CCC_IR_HONI_20091002 | Interrogatories to Applicant | Hydro One Networks Inc. - Electricity Distributor | 2009-10-02 | 2009-10-02 | |
EB-2009-0096 | ECAO_IR_HONI_20091002 | Interrogatories to Applicant | Hydro One Networks Inc. - Electricity Distributor | 2009-10-02 | 2009-10-02 | |
EB-2009-0096 | Rogers_IR_HONI_20091002 | Interrogatories to Applicant | Hydro One Networks Inc. - Electricity Distributor | 2009-10-02 | 2009-10-02 | |
EB-2009-0096 | AMPCO_IR_HONI_20091002 | Interrogatories to Applicant | Hydro One Networks Inc. - Electricity Distributor | 2009-10-02 | 2009-10-02 | |
EB-2009-0096 | CME_IR_HONI_20091002 | Interrogatories to Applicant | Hydro One Networks Inc. - Electricity Distributor | 2009-10-02 | 2009-10-02 | |
EB-2009-0096 | VECC_IR_HONI_20091002 | Interrogatories to Applicant | Hydro One Networks Inc. - Electricity Distributor | 2009-10-02 at 1:36 PM | ||
EB-2009-0096 | VECC_IR_HONI_20091002 | Interrogatories to Applicant | Hydro One Networks Inc. - Electricity Distributor | 2009-10-02 | 2009-10-02 | |
EB-2009-0096 | PWU_IR_HONI_20091002 | Interrogatories to Applicant | Hydro One Networks Inc. - Electricity Distributor | 2009-10-02 | 2009-10-02 | |
EB-2009-0096 | EnviroCentre_IR_HONI_20091001 | Interrogatories to Applicant | Hydro One Networks Inc. - Electricity Distributor | 2009-10-01 | 2009-10-01 | |
EB-2009-0096 | Brdstaff_IR_List 2_HONI_200901001 | Interrogatories to Applicant | Hydro One Networks Inc. - Electricity Distributor | 2009-10-01 | 2009-10-01 | |
EB-2009-0096 | Pollution Probe_IR_HONI_20091001 | Interrogatories to Applicant | Hydro One Networks Inc. - Electricity Distributor | 2009-10-01 | 2009-10-01 | |
EB-2009-0096 | Energy Probe_IRs Part One_HONI Dx_20090930 | Interrogatories to Applicant | Hydro One Networks Inc. - Electricity Distributor | 2009-10-01 at 11:39 AM | ||
EB-2009-0096 | GEC_IR_HONI_20090930 | Interrogatories to Applicant | Hydro One Networks Inc. - Electricity Distributor | 2009-09-30 | 2009-09-30 | |
EB-2009-0096 | ECAO_Intervention_REQ_20090930 | Intervenor Request Letter | Hydro One Networks Inc. - Electricity Distributor | 2009-09-30 | 2009-09-30 | |
EB-2009-0096 | Brdstaff_IR_List 1_HONI_20090929 | Interrogatories to Applicant | Hydro One Networks Inc. - Electricity Distributor | 2009-09-29 | 2009-09-29 | |
EB-2009-0096 | Dawn and Eric Flickinger_Comments_HONI_20090929 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-29 at 1:30 PM | ||
EB-2009-0096 | HONI_APPL_Model_20090926 | Application and Evidence | Hydro One Networks Inc. - Electricity Distributor | 2009-09-28 | 2009-09-28 | |
EB-2009-0096 | PO2_dec Issues List_HONI_20090925 | Procedural Order | Hydro One Networks Inc. - Electricity Distributor | 2009-09-25 | 2009-09-25 | |
EB-2009-0096 | C. M. Bauch_Comments_HONI_20090911 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-21 | 2009-09-21 | |
EB-2009-0096 | HONI_Reply_SUB_Draft Issues_20090918 | Submission | Hydro One Networks Inc. - Electricity Distributor | 2009-09-18 | 2009-09-18 | |
EB-2009-0096 | R Small_Comments_HONI_20090922 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-22 at 10:20 AM | ||
EB-2009-0096 | Hopper Foundry_ HONI_ Request for late intervention_20090921 | Intervenor Request Letter | Hydro One Networks Inc. - Electricity Distributor | 2009-09-21 | 2009-09-21 | |
EB-2009-0096 | EP_ Reply Submissions_ HONI_20090921 | Submission | Hydro One Networks Inc. - Electricity Distributor | 2009-09-21 | 2009-09-21 | |
EB-2009-0096 | VECC_SUB Part 2_HONI_20090918 | Submission | Hydro One Networks Inc. - Electricity Distributor | 2009-09-18 | 2009-09-18 | |
EB-2009-0096 | Robert Warren_Ltr_HONI_20090918 | Correspondence | Hydro One Networks Inc. - Electricity Distributor | 2009-09-18 | 2009-09-18 | |
EB-2009-0096 | Robin Stewart_Observor_REQ_20090917 | Observer Request Letter | Hydro One Networks Inc. - Electricity Distributor | 2009-09-17 | 2009-09-17 | |
EB-2009-0096 | Russell Armstrong_Comments_HONI_20090917 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-17 | 2009-09-17 | |
EB-2009-0096 | Upper Falls Baptish Church_Comments_HONI_20090916 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-16 | 2009-09-16 | |
EB-2009-0096 | Grant Church_Comments_HONI_20090916 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-16 | 2009-09-16 | |
EB-2009-0096 | Kevin & Andrea Szachury_Comments_HONI_20090915 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-15 | 2009-09-15 | |
EB-2009-0096 | Randy and Carole Wilde_Comments_HONI_20090916 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-16 | 2009-09-16 | |
EB-2009-0096 | Rohan Hasfal_Comments_HONI_20090916 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-16 | 2009-09-16 | |
EB-2009-0096 | SEC_SUB_HONI Draft Issues List_20090916 | Submission | Hydro One Networks Inc. - Electricity Distributor | 2009-09-16 | 2009-09-16 | |
EB-2009-0096 | GEC_Intervenor_REQ_20090916 | Intervenor Request Letter | Hydro One Networks Inc. - Electricity Distributor | 2009-09-16 | 2009-09-16 | |
EB-2009-0096 | AMPCO_SUB_HONI_Draft Issues list_20091015 | Submission | Hydro One Networks Inc. - Electricity Distributor | 2009-09-15 | 2009-09-15 | |
EB-2009-0096 | HONI_SUB_Draft Issues_20090915 | Submission | Hydro One Networks Inc. - Electricity Distributor | 2009-09-15 | 2009-09-15 | |
EB-2009-0096 | CME_SUB_HONI_20090915 | Submission | Hydro One Networks Inc. - Electricity Distributor | 2009-09-15 | 2009-09-15 | |
EB-2009-0096 | Darrell & Evadnie Taylor_Comments_HONI_20090915 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-15 at 4:03 PM | ||
EB-2009-0096 | VECC_SUB_HONI_20090915 | Submission | Hydro One Networks Inc. - Electricity Distributor | 2009-09-15 at 3:27 PM | ||
EB-2009-0096 | CCC_SUB_HONI_20090915 | Submission | Hydro One Networks Inc. - Electricity Distributor | 2009-09-15 at 3:26 PM | ||
EB-2009-0096 | R. W. Butler_Comments_HONI_20090913 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-15 at 3:14 PM | ||
EB-2009-0096 | Gordon & Shirley Hanson_Comments_HONI_20090914 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-15 at 3:04 PM | ||
EB-2009-0096 | EnvirCentre_Rationale_Intervention_REQ_20090914 | Correspondence | Hydro One Networks Inc. - Electricity Distributor | 2009-09-15 at 2:49 PM | ||
EB-2009-0096 | EnviroCentre_Board Members_20090914 | Correspondence | Hydro One Networks Inc. - Electricity Distributor | 2009-09-15 at 2:49 PM | ||
EB-2009-0096 | Randy Ponton_Comments_HONI_20090915 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-15 at 2:50 PM | ||
EB-2009-0096 | Janice Storozuk_Comments_HONI_20090915 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-15 at 2:35 PM | ||
EB-2009-0096 | Dianne McCormack_Comments_HONI_20090915 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-15 at 2:34 PM | ||
EB-2009-0096 | Pollution Probe_SUB_HONI_20090915 | Submission | Hydro One Networks Inc. - Electricity Distributor | 2009-09-15 at 1:13 PM | ||
EB-2009-0096 | Darlene La Belle_Comments_HONI_20090915 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-15 at 2:05 PM | ||
EB-2009-0096 | Barry & Eileen Hunter_Comments_HONI_20090915 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-15 at 2:04 PM | ||
EB-2009-0096 | Rick & Marlene Crago_Comments_HONI_20090915 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-15 at 2:03 PM | ||
EB-2009-0096 | Debbie McDonald_Comments_HONI_20090915 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-15 at 2:02 PM | ||
EB-2009-0096 | Debbie M_Comments_HONI_20090915 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-15 at 2:01 PM | ||
EB-2009-0096 | Allen Welke_Comment_HONI_20090915 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-15 at 2:00 PM | ||
EB-2009-0096 | Laura Wigle_Comments_HONI_20090915 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-15 at 1:59 PM | ||
EB-2009-0096 | Ray & Marion Lowes_Comment_HONI_20090915 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-15 at 1:58 PM | ||
EB-2009-0096 | Nowell Sleep_Comments_HONI_20090914 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-15 at 11:09 AM | ||
EB-2009-0096 | Debra McDonald_Comments_HONI_20090914 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-15 at 11:08 AM | ||
EB-2009-0096 | Norman Ames_Comments_HONI_20090914 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-15 at 11:07 AM | ||
EB-2009-0096 | Hylas & Esther Larocque_Comments_HONI_20090914 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-15 at 11:06 AM | ||
EB-2009-0096 | Peter Venturi_Comments_HONI_20090914 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-15 at 11:06 AM | ||
EB-2009-0096 | Paulette_Comments_HONI_20090914 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-15 at 10:42 AM | ||
EB-2009-0096 | Carol Larocque_Comments_HONI_20090914 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-15 at 10:37 AM | ||
EB-2009-0096 | Richard Rankin_Comments_HONI_20090914 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-14 at 2:18 PM | ||
EB-2009-0096 | Steven Fossey_Comments_HONI_20090914 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-14 at 12:26 PM | ||
EB-2009-0096 | Bruce Petsnick_Comments_HONI_20090912 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-14 at 12:25 PM | ||
EB-2009-0096 | Don Heather Compardo_Comments_HONI_20090912 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-14 at 12:24 PM | ||
EB-2009-0096 | The Tarrants_Comments_HONI_20090912 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-14 at 12:23 PM | ||
EB-2009-0096 | Evelyn Olson_Comments_HONI_20090912 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-14 at 12:22 PM | ||
EB-2009-0096 | Mike Furlong_Comments_HONI_20090914 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-14 at 12:21 PM | ||
EB-2009-0096 | Energy Probe_SUB_HONI_20090914 | Submission | Hydro One Networks Inc. - Electricity Distributor | 2009-09-14 | 2009-09-14 | |
EB-2009-0096 | K.Hampe_Comments_HONI_20090913 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-14 at 12:18 PM | ||
EB-2009-0096 | Carmene and Bob Hampe_Comments_HONI_20090913 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-14 at 12:17 PM | ||
EB-2009-0096 | Ray Gionet_Comments_HONI_20090913 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-14 at 12:16 PM | ||
EB-2009-0096 | Gene Chu_Comments_HONI_20090913 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-14 at 12:15 PM | ||
EB-2009-0096 | Doug Colbob_Comments_HONI_20090913 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-14 at 12:14 PM | ||
EB-2009-0096 | Sara Campbell_Comments_HONI_20090913 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-14 at 12:13 PM | ||
EB-2009-0096 | Barry Scherban_Comments_HONI_20090913 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-14 at 12:12 PM | ||
EB-2009-0096 | Murray Hyatt_Comments_HONI_20090913 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-14 at 12:11 PM | ||
EB-2009-0096 | Dennis McParland_Comments_HONI_20090912 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-14 at 12:10 PM | ||
EB-2009-0096 | Linda Hutchinson_Comments_HONI_20090912 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-14 at 12:10 PM | ||
EB-2009-0096 | Chad Frenette_Comments_HONI_20090912 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-14 at 12:09 PM | ||
EB-2009-0096 | Fay Besselt_Comments_HONI_20090912 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-14 at 12:08 PM | ||
EB-2009-0096 | Roger and Carol Peters_Comments_HONI_20090912 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-14 at 12:04 PM | ||
EB-2009-0096 | Christine Hampton_Comments_HONI-20090912 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-14 at 12:01 PM | ||
EB-2009-0096 | Ken Kozmenski_Comments_HONI_20090912 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-14 at 11:59 AM | ||
EB-2009-0096 | Dale MacKenzie_Comments_HONI-20090912 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-14 at 11:55 AM | ||
EB-2009-0096 | Gord Rankin_Comments_HONI_20090912 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-14 at 11:55 AM | ||
EB-2009-0096 | Arnold & Glenna Odell_Comments_HONI_20090911 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-14 at 11:53 AM | ||
EB-2009-0096 | Pat & Gerry Olipahants_Comments_HONI_20090911 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-14 at 11:52 AM | ||
EB-2009-0096 | Brd_ltr_EnviroCentre_Intervention_REQ_20090914 | Intervenor Request Objection | Hydro One Networks Inc. - Electricity Distributor | 2009-09-14 | 2009-09-14 | |
EB-2009-0096 | Debby Ewald_Comments_HONI_20090907 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-11 at 5:01 PM | ||
EB-2009-0096 | Lorne Bent_Comments_HONI_20090911 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-14 at 8:36 AM | ||
EB-2009-0096 | Barry Trute_Comments_HONI_20090911 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-11 at 4:17 PM | ||
EB-2009-0096 | Al & Cheryl_Comments_HONI_20090911 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-11 at 4:15 PM | ||
EB-2009-0096 | Rhona Karschti_Comments_HONI_20090911 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-11 at 4:14 PM | ||
EB-2009-0096 | Bill & Helen_Oshynko_Comments_HONI_20090911 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-11 at 4:10 PM | ||
EB-2009-0096 | Thomas G. Weir_Comments_HONI_20090903 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-11 at 8:51 AM | ||
EB-2009-0096 | Amy Girvin_Comment_HONI_20090911 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-11 at 8:27 AM | ||
EB-2009-0096 | Ken Blackwood_Comments_HONI_20090910 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-10 at 4:22 PM | ||
EB-2009-0096 | Geoff Hartley_Comments_HONI_20090910 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-10 | 2009-09-10 | |
EB-2009-0096 | PO1_HONI_20090909 | Procedural Order | Hydro One Networks Inc. - Electricity Distributor | 2009-09-09 | 2009-09-09 | |
EB-2009-0096 | Andrew Bartlett_Comments_HONI_20090909 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-09 at 2:44 PM | ||
EB-2009-0096 | Leigh Howell_Comments_HONI_20090909 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-09 at 12:19 PM | ||
EB-2009-0096 | Larry Perkins_Comments_HONI_20090909 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-09 at 12:17 PM | ||
EB-2009-0096 | Jo-Dee Kamm_Comments_HONI_20090909 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-09 at 12:16 PM | ||
EB-2009-0096 | Sharon Perkins_Comments_HONI_20090909 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-09 at 12:15 PM | ||
EB-2009-0096 | Tom Blanchard_Comments_HONI_20090908 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-08 at 3:58 PM | ||
EB-2009-0096 | Lucille Berg_Comments_HONI_20090908 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-08 at 3:50 PM | ||
EB-2009-0096 | Cathy Presta_Comments_HONI_20090908 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-08 at 3:32 PM | ||
EB-2009-0096 | Chris Campbell_Comments_HONI_20090905 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-08 at 11:10 AM | ||
EB-2009-0096 | Wayne Clarkson_Comments_HONI_20090905 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-08 at 11:08 AM | ||
EB-2009-0096 | Linda & Richard Harder_Comments_HONI_20090908 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-08 at 11:06 AM | ||
EB-2009-0096 | Kim_Magee_Comments_HONI_20090907 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-08 at 10:46 AM | ||
EB-2009-0096 | Sharon_Barton_Comments_HONI_20090902 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-04 at 11:08 AM | ||
EB-2009-0096 | Mayor_Twnshp Ear Falls_HONI_20090826 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-04 at 9:50 AM | ||
EB-2009-0096 | Marilyn_Braden_Comments_HONI_20090902 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-04 at 9:49 AM | ||
EB-2009-0096 | Gilles_Comments_HONI_20090902 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-04 at 9:48 AM | ||
EB-2009-0096 | David_Whitney_Comments_HONI_20090902 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-04 at 9:45 AM | ||
EB-2009-0096 | Trudy_Sachowski_Comments_HONI_20090902 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-03 | 2009-09-03 | |
EB-2009-0096 | Line_Perras_Comment_HONI_EN_20090827 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-03 at 10:36 AM | ||
EB-2009-0096 | Theresa_Ball_Comments_HONI_20090828 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-02 at 9:25 AM | ||
EB-2009-0096 | mark_Jodoin_Comments_HONI_20090901 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-09-01 | 2009-09-01 | |
EB-2009-0096 | Line_Perras_Comment_HONI_FR_20090827 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-08-28 | 2009-08-28 | |
EB-2009-0096 | Strathcona_Paper_Comments_HONI_20090831 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-08-31 | 2009-08-31 | |
EB-2009-0096 | Aisha_Badran_Comments_HONI_20090830 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-08-31 | 2009-08-31 | |
EB-2009-0096 | Renelle_Gauthier_Comments_HONI_20090831 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-08-31 | 2009-08-31 | |
EB-2009-0096 | Pender_Comments_HONI_20090828 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-08-31 at 11:44 AM | ||
EB-2009-0096 | J_LaFlair_Comments_HONI_20090828 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-08-28 | 2009-08-28 | |
EB-2009-0096 | Mineau_Comments_HONI_20090828 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-08-28 at 3:34 PM | ||
EB-2009-0096 | Jan_Ian_Franworth_Comments_HONI_20090828 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-08-28 | 2009-08-28 | |
EB-2009-0096 | Paul_G_Martin_Comments_HONI_20090828 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-08-28 | 2009-08-28 | |
EB-2009-0096 | Margaret_Simms_Comments_HONI_20090827 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-08-27 | 2009-08-27 | |
EB-2009-0096 | Claudette_Onnis_Comments_HONI_20090827 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-08-27 | 2009-08-27 | |
EB-2009-0096 | Ethyl_Comments_HONI_20090826 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-08-26 | 2009-08-26 | |
EB-2009-0096 | OPG_HONI_Intervenor_REQ_20090825 | Intervenor Request Letter | Hydro One Networks Inc. - Electricity Distributor | 2009-08-26 | 2009-08-26 | |
EB-2009-0096 | Judy_Somerville_Comments_HONI_20090826 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-08-26 | 2009-08-26 | |
EB-2009-0096 | Richard_Dianne_Short_Comments_HONI_20090826 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-08-26 | 2009-08-26 | |
EB-2009-0096 | John_Stephens_Comments_HONI_20090824 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-08-25 at 2:32 PM | ||
EB-2009-0096 | Everett_Brown_Comments_HONI_20090824 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-08-25 at 2:31 PM | ||
EB-2009-0096 | Noel_Pinto_Comments_HONI_20090825 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-08-25 at 2:32 PM | ||
EB-2009-0096 | Judy_Neill_Comments_HONI_20090825 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-08-25 | 2009-08-25 | |
EB-2009-0096 | Brenda_Okeefe_Comments_HONI_20090825 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-08-25 at 10:57 AM | ||
EB-2009-0096 | Charles_Hooker_Comments_HONI_20090821 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-08-25 at 10:08 AM | ||
EB-2009-0096 | Louise_Fisher_Comments_HONI_20090822 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-08-25 at 10:07 AM | ||
EB-2009-0096 | David_Granger_Comments_HONI_20090821 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-08-25 at 10:06 AM | ||
EB-2009-0096 | John_Ficner_Comments_HONI_20090822 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-08-24 at 1:20 PM | ||
EB-2009-0096 | Daniel_Bradbury_Comments_HONI_20090821 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-08-25 at 10:02 AM | ||
EB-2009-0096 | Laura_Buker_Comments_HONI_20090822 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-08-25 at 10:01 AM | ||
EB-2009-0096 | Dona_Digby_Comments_HONI_20090822 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-08-25 at 10:00 AM | ||
EB-2009-0096 | James_Hutton_Comments_HONI_20090823 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-08-25 at 9:59 AM | ||
EB-2009-0096 | BillWInterburn_Comments_HONI_20090823 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-08-25 at 9:57 AM | ||
EB-2009-0096 | EnviroCentre_Intervenor_REQ_HONI_20090824 | Intervenor Request Letter | Hydro One Networks Inc. - Electricity Distributor | 2009-08-24 at 1:23 PM | ||
EB-2009-0096 | EvelynMarcon_Comments_HONI_20090822 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-08-24 at 1:23 PM | ||
EB-2009-0096 | Gege_Crys_Comments_HONI_20090824 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-08-25 at 9:50 AM | ||
EB-2009-0096 | GregNicol_Comments_HONI_20090824 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-08-24 | 2009-08-24 | |
EB-2009-0096 | AlisonLong_Comments_HONI_20090820 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-08-21 at 2:00 PM | ||
EB-2009-0096 | VerneCraven_Comments_HONI_20090820 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-08-21 at 1:58 PM | ||
EB-2009-0096 | JoeMota_Comments_HONI_20090820 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-08-21 at 11:02 AM | ||
EB-2009-0096 | Bonin_Comments_HONI_20090820 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-08-21 at 9:33 AM | ||
EB-2009-0096 | SheilaClark_Comments_HONI_20090819 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-08-21 at 9:33 AM | ||
EB-2009-0096 | CommonVoice_Intervenor_REQ_HONI_20090820 | Intervenor Request Letter | Hydro One Networks Inc. - Electricity Distributor | 2009-08-20 | 2009-08-20 | |
EB-2009-0096 | CCC_Intervenor_REQ_HONI_20090819 | Intervenor Request Letter | Hydro One Networks Inc. - Electricity Distributor | 2009-08-19 | 2009-08-19 | |
EB-2009-0096 | GlenMorrison_Comment_HONI Rates_20090818 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-08-18 | 2009-08-18 | |
EB-2009-0096 | Horizon_Intervenor_REQ_HONI_20090813 | Intervenor Request Letter | Hydro One Networks Inc. - Electricity Distributor | 2009-08-17 | 2009-08-17 | |
EB-2009-0096 | Rogers_HONI_Intervenor_REQ_20090817 | Intervenor Request Letter | Hydro One Networks Inc. - Electricity Distributor | 2009-08-17 | 2009-08-17 | |
EB-2009-0096 | RuthGallop_Comments_HONI_20090818 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-08-18 | 2009-08-18 | |
EB-2009-0096 | Schonhoffer_Comments_HONI_20090818 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-08-18 | 2009-08-18 | |
EB-2009-0096 | KenPaulusma_Comment_HONI_20090818 | Letter of Comment | Hydro One Networks Inc. - Electricity Distributor | 2009-08-18 | 2009-08-18 | |
EB-2009-0096 | AMPCO_Intervention_REQ_HONI_20090817 | Intervenor Request Letter | Hydro One Networks Inc. - Electricity Distributor | 2009-08-17 | 2009-08-17 | |
EB-2009-0096 | Horizon_Intervenor_REQ_HONI_20090813 | Intervenor Request Letter | Hydro One Networks Inc. - Electricity Distributor | 2009-08-13 | 2009-08-13 | |
EB-2009-0096 | SEP_Intervention_REQ_HONI_20090807 | Intervenor Request Letter | Hydro One Networks Inc. - Electricity Distributor | 2009-08-11 | 2009-08-11 | |
EB-2009-0096 | IESO_HONI_Intervenor_REQ_20090813 | Intervenor Request Letter | Hydro One Networks Inc. - Electricity Distributor | 2009-08-13 | 2009-08-13 | |
EB-2009-0096 | Union_Intervenor_REQ_HONI_20090811 | Intervenor Request Letter | Hydro One Networks Inc. - Electricity Distributor | 2009-08-12 | 2009-08-12 | |
EB-2009-0096 | VECC_INTERVENTION_HONI_20090812 | Intervenor Request Letter | Hydro One Networks Inc. - Electricity Distributor | 2009-08-12 | 2009-08-12 | |
EB-2009-0096 | PollutionProbe_Intervention_REQ_HONI_20090811 | Intervenor Request Letter | Hydro One Networks Inc. - Electricity Distributor | 2009-08-11 | 2009-08-11 | |
EB-2009-0096 | CME_Intervenor_REQ_HONI_20090810 | Intervenor Request Letter | Hydro One Networks Inc. - Electricity Distributor | 2009-08-10 | 2009-08-10 | |
EB-2009-0096 | PowerWorkers_Intervention_REQ_HONI_20090810 | Intervenor Request Letter | Hydro One Networks Inc. - Electricity Distributor | 2009-08-10 | 2009-08-10 | |
EB-2009-0096 | Energy Probe_Intervention_REQ_HONI_20090811 | Intervenor Request Letter | Hydro One Networks Inc. - Electricity Distributor | 2009-08-11 | 2009-08-11 | |
EB-2009-0096 | Powerstream_HONI_Intervenor_REQ_20090810 | Intervenor Request Letter | Hydro One Networks Inc. - Electricity Distributor | 2009-08-10 | 2009-08-10 | |
EB-2009-0096 | Hydro Ottawa_HONI_Intervenor_REQ_20090810 | Intervenor Request Letter | Hydro One Networks Inc. - Electricity Distributor | 2009-08-10 | 2009-08-10 | |
EB-2009-0096 | SEC_Intervention_REQ_HONI_20090806 | Intervenor Request Letter | Hydro One Networks Inc. - Electricity Distributor | 2009-08-06 | 2009-08-06 | |
EB-2009-0096 | LoD_NOAH_HydroOne_20090804 | Notice of Application and Notice of Hearing | Hydro One Networks Inc. - Electricity Distributor | 2009-08-04 | 2009-08-04 | |
EB-2009-0096 | NoAH_HydroOne_20090804 | Notice of Application and Notice of Hearing | Hydro One Networks Inc. - Electricity Distributor | 2009-08-04 | 2009-08-04 | |
EB-2009-0096 | NoAH_HydroOne_FR_20090804 | Notice of Application and Notice of Hearing | Hydro One Networks Inc. - Electricity Distributor | 2009-08-04 | 2009-08-04 | |
EB-2009-0096 | LoD_HydroOne_20090804 | Letter of Direction | Hydro One Networks Inc. - Electricity Distributor | 2009-08-04 | 2009-08-04 | |
EB-2009-0096 | OPA_Intervenor_REQ_HONI_20090729 | Intervenor Request Letter | Hydro One Networks Inc. - Electricity Distributor | 2009-07-29 | 2009-07-29 | |
EB-2009-0096 | ack_ltr_complete_Hydro One_20090717 | Acknowledgement Letter | Hydro One Networks Inc. - Electricity Distributor | 2009-07-17 | 2009-07-17 | |
EB-2009-0096 | HONI_APPL_20090925 | Application and Evidence | Hydro One Networks Inc. - Electricity Distributor | 2009-09-25 | 2009-09-25 | |
EB-2009-0096 | HONI_ltr_20090420 | Correspondence | Hydro One Networks Inc. - Electricity Distributor | 2009-04-20 | 2009-04-20 | |
EB-2009-0096 | HONI_Sub_20090417 | Correspondence | Hydro One Networks Inc. - Electricity Distributor | 2009-04-17 | 2009-04-17 | |
Case Number | File Name | Document Type | Applicant | Issued By OEB | Received By OEB | Date Issued/Received |