Advanced Regulatory Document Search (RDS)

 

Search Results for: Records - Case Number=EB-2021-0110 - 855 Records Found

sort icon Sorting Your Search Results
The most recent documents automatically show at the top. To sort by different categories (e.g. by Document Type) click the column header. Click it again to switch between ascending/descending order.



info iconCase Information
Click the case number to view details for that proceeding.

Filter on Search Results:
Case Number File Name Document Type Applicant Issued By OEB Received By OEB Date Issued/Received
EB-2021-0110 document icon OEBltr_Post Application Conf_Invitation_JRAP_20230228_eSigned Correspondence Hydro One Networks Inc. - Electricity Distributor 2023-02-28 2023-02-28
EB-2021-0110 document icon dec_order_cost awards_HONI JRAP_20230228_eSigned Decision and Order on Cost Awards Hydro One Networks Inc. - Electricity Distributor 2023-02-28 2023-02-28
EB-2021-0110 document icon HONI_JRAP_CostsObj_20230112 Cost Claim Objection Hydro One Networks Inc. - Electricity Distributor 2023-01-12 2023-01-12
EB-2021-0110 document icon CME_Cost Claim_revised_010520231730_20230105 Cost Claim Hydro One Networks Inc. - Electricity Distributor 2023-01-05 2023-01-05
EB-2021-0110 document icon HONI_JRAP_Density Information_20221223 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-12-23 2022-12-23
EB-2021-0110 document icon PO8_Hydro One_JRAP_20221222 Procedural Order Hydro One Networks Inc. - Electricity Distributor 2022-12-22 2022-12-22
EB-2021-0110 document icon AMPCO_Cost Claim_revised_20230110 Cost Claim Hydro One Networks Inc. - Electricity Distributor 2022-12-22 2022-12-22
EB-2021-0110 document icon QMA_Cost Claim_122120221100_20221221 Cost Claim Hydro One Networks Inc. - Electricity Distributor 2022-12-21 2022-12-21
EB-2021-0110 document icon CCC_Cost Claim_revised_122020222107_20230104 Cost Claim Hydro One Networks Inc. - Electricity Distributor 2022-12-20 2022-12-20
EB-2021-0110 document icon CC_Participant_Combined - 170 rate_20221220 Cost Claim Hydro One Networks Inc. - Electricity Distributor 2022-12-20 2022-12-20
EB-2021-0110 document icon CC_Participant_Combined - 230_20221220 Cost Claim Hydro One Networks Inc. - Electricity Distributor 2022-12-20 2022-12-20
EB-2021-0110 document icon SEC_Cost Claim_revised_ 122020221221_20230104 Cost Claim Hydro One Networks Inc. - Electricity Distributor 2022-12-20 2022-12-20
EB-2021-0110 document icon ANWAA_Cost Claim_revised_122020221144_20230119 Cost Claim Hydro One Networks Inc. - Electricity Distributor 2022-12-20 2022-12-20
EB-2021-0110 document icon OSEA_Cost Claim_revised_122020221022_20230104 Cost Claim Hydro One Networks Inc. - Electricity Distributor 2022-12-20 2022-12-20
EB-2021-0110 document icon VECC_Cost Claim 122020221219_20221220 Cost Claim Hydro One Networks Inc. - Electricity Distributor 2022-12-20 2022-12-20
EB-2021-0110 document icon ED_Cost Claim 122020221204_20221220 Cost Claim Hydro One Networks Inc. - Electricity Distributor 2022-12-20 2022-12-20
EB-2021-0110 document icon DRC_Cost Claim_revised_122020221155_20230119 Cost Claim Hydro One Networks Inc. - Electricity Distributor 2022-12-20 2022-12-20
EB-2021-0110 document icon LPMA_Cost Claim 121920220939_20221219 Cost Claim Hydro One Networks Inc. - Electricity Distributor 2022-12-19 2022-12-19
EB-2021-0110 document icon P_PRO_Cost Claim_revised_20220105 Cost Claim Hydro One Networks Inc. - Electricity Distributor 2022-12-16 2022-12-16
EB-2021-0110 document icon MFN_Cost Claim_20221208 Cost Claim Hydro One Networks Inc. - Electricity Distributor 2022-12-08 2022-12-08
EB-2021-0110 document icon E_PRO_Cost Claim_revised_20221206 Cost Claim Hydro One Networks Inc. - Electricity Distributor 2022-12-06 2022-12-06
EB-2021-0110 document icon dec_rate order_HONI JRAP_20221129_eSigned Decision and Order Hydro One Networks Inc. - Electricity Distributor 2022-11-29 2022-11-29
EB-2021-0110 document icon HONI_JRAP_Settlement Proposal_Attachment Update_Attachment 2_Schedule 6.0_20221116 Settlement Proposal Hydro One Networks Inc. - Electricity Distributor 2022-11-16 2022-11-16
EB-2021-0110 document icon HONI_JRAP_Settlement Proposal_Attachment Update_Attachment 2_Schedule 7.4_20221116 Settlement Proposal Hydro One Networks Inc. - Electricity Distributor 2022-11-16 2022-11-16
EB-2021-0110 document icon HONI_JRAP_Settlement Proposal_Attachment Update_Attachment 2_Schedule 7.3_20221116 Settlement Proposal Hydro One Networks Inc. - Electricity Distributor 2022-11-16 2022-11-16
EB-2021-0110 document icon HONI_JRAP_Settlement Proposal_Attachment Update_Attachment 2_Schedule 7.2_20221116 Settlement Proposal Hydro One Networks Inc. - Electricity Distributor 2022-11-16 2022-11-16
EB-2021-0110 document icon HONI_JRAP_Settlement Proposal_Attachment Update_Attachment 2_Schedule 6.2_20221116 Settlement Proposal Hydro One Networks Inc. - Electricity Distributor 2022-11-16 2022-11-16
EB-2021-0110 document icon HONI_JRAP_Settlement Proposal_Attachment Update_Attachment 2_Schedule 5.0_20221116 Settlement Proposal Hydro One Networks Inc. - Electricity Distributor 2022-11-16 2022-11-16
EB-2021-0110 document icon HONI_JRAP_Settlement Proposal_Attachment Update_Attachment 2_Schedule 4.4_20221116 Settlement Proposal Hydro One Networks Inc. - Electricity Distributor 2022-11-16 2022-11-16
EB-2021-0110 document icon HONI_JRAP_Settlement Proposal_Attachment Update_Attachment 2_Schedule 4.3_20221116 Settlement Proposal Hydro One Networks Inc. - Electricity Distributor 2022-11-16 2022-11-16
EB-2021-0110 document icon HONI_JRAP_Settlement Proposal_Attachment Update_Attachment 2_Schedule 4.2_20221116 Settlement Proposal Hydro One Networks Inc. - Electricity Distributor 2022-11-16 2022-11-16
EB-2021-0110 document icon HONI_JRAP_Settlement Proposal_Attachment Update_Attachment 2_Schedule 4.1_20221116 Settlement Proposal Hydro One Networks Inc. - Electricity Distributor 2022-11-16 2022-11-16
EB-2021-0110 document icon HONI_JRAP_Settlement Proposal_Attachment Update_Attachment 2_Schedule 8.2_20221116 Settlement Proposal Hydro One Networks Inc. - Electricity Distributor 2022-11-16 2022-11-16
EB-2021-0110 document icon HONI_JRAP_Settlement Proposal_Attachment Update_Attachment 2_Schedule 7.1_20221116 Settlement Proposal Hydro One Networks Inc. - Electricity Distributor 2022-11-16 2022-11-16
EB-2021-0110 document icon HONI_JRAP_Settlement Proposal_Attachment Update_Attachment 2_Schedule 6.3_20221116 Settlement Proposal Hydro One Networks Inc. - Electricity Distributor 2022-11-16 2022-11-16
EB-2021-0110 document icon HONI_JRAP_Settlement Proposal_Attachment Update_Attachment 2_Schedule 6.1_20221116 Settlement Proposal Hydro One Networks Inc. - Electricity Distributor 2022-11-16 2022-11-16
EB-2021-0110 document icon HONI_JRAP_Settlement Proposal_Attachment Update_Attachment 2_Schedule 3.1_20221116 Settlement Proposal Hydro One Networks Inc. - Electricity Distributor 2022-11-16 2022-11-16
EB-2021-0110 document icon HONI_JRAP_Settlement Proposal_Attachment Update_Attachment 2_Schedule 1.2.4_Dx_20221116 Settlement Proposal Hydro One Networks Inc. - Electricity Distributor 2022-11-16 2022-11-16
EB-2021-0110 document icon HONI_JRAP_Settlement Proposal_Attachment Update_Attachment 1_Schedule 1.2.4_Tx_20221116 Settlement Proposal Hydro One Networks Inc. - Electricity Distributor 2022-11-16 2022-11-16
EB-2021-0110 document icon HONI_JRAP_Settlement Proposal_Attachment Update_20221116 Settlement Proposal Hydro One Networks Inc. - Electricity Distributor 2022-11-16 2022-11-16
EB-2021-0110 document icon HONI_JRAP_Settlement Proposal_Attachment Update_Attachment 2_Schedule 4.0_20221116 Settlement Proposal Hydro One Networks Inc. - Electricity Distributor 2022-11-16 2022-11-16
EB-2021-0110 document icon OEB_Staff_Sub_Settlement Proposal_JRAP_20221101 Submission Hydro One Networks Inc. - Electricity Distributor 2022-11-01 2022-11-01
EB-2021-0110 document icon OEBLtr_HONI_JRAP_Presentation Day_20221028_eSigned Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-10-28 2022-10-28
EB-2021-0110 document icon PO7_Hydro One_JRAP_20221025_eSigned Procedural Order Hydro One Networks Inc. - Electricity Distributor 2022-10-25 2022-10-25
EB-2021-0110 document icon HONI_JRAP_Responses to Clarification Questions_SC-22-SEC-07-01_20221024 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-10-24 2022-10-24
EB-2021-0110 document icon HONI_JRAP_Responses to Clarification Questions_SC-22-SEC-01-01_20221024. Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-10-24 2022-10-24
EB-2021-0110 document icon HONI_JRAP_Responses to Clarification Questions_20221024 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-10-24 2022-10-24
EB-2021-0110 document icon HONI_JRAP_Settlement Proposal_Attachment 2_Schedule 7.1_20221024 Settlement Proposal Hydro One Networks Inc. - Electricity Distributor 2022-10-24 2022-10-24
EB-2021-0110 document icon HONI_JRAP_Settlement Proposal_Attachment 2_Schedule 6.2_20221024 Settlement Proposal Hydro One Networks Inc. - Electricity Distributor 2022-10-24 2022-10-24
EB-2021-0110 document icon HONI_JRAP_Settlement Proposal_Attachment 2_Schedule 6.1_20221024 Settlement Proposal Hydro One Networks Inc. - Electricity Distributor 2022-10-24 2022-10-24
EB-2021-0110 document icon HONI_JRAP_Settlement Proposal_Attachment 2_Schedule 4.1_20221024 Settlement Proposal Hydro One Networks Inc. - Electricity Distributor 2022-10-24 2022-10-24
EB-2021-0110 document icon HONI_JRAP_Settlement Proposal_Attachment 2_Schedule 4.0_20221024 Settlement Proposal Hydro One Networks Inc. - Electricity Distributor 2022-10-24 2022-10-24
EB-2021-0110 document icon HONI_JRAP_Settlement Proposal_Attachment 2_Schedule 3.1_20221024 Settlement Proposal Hydro One Networks Inc. - Electricity Distributor 2022-10-24 2022-10-24
EB-2021-0110 document icon HONI_JRAP_Settlement Proposal_Attachment 2_Schedule 1.2.4_Dx_20221024 Settlement Proposal Hydro One Networks Inc. - Electricity Distributor 2022-10-24 2022-10-24
EB-2021-0110 document icon HONI_JRAP_Settlement Proposal_Attachment 1_Schedule 1.2.4_Tx_20221024 Settlement Proposal Hydro One Networks Inc. - Electricity Distributor 2022-10-24 2022-10-24
EB-2021-0110 document icon HONI_JRAP_Settlement Proposal_Attachment 2_Schedule 7.4_20221024 Settlement Proposal Hydro One Networks Inc. - Electricity Distributor 2022-10-24 2022-10-24
EB-2021-0110 document icon HONI_JRAP_Settlement Proposal_Attachment 2_Schedule 7.2_20221024 Settlement Proposal Hydro One Networks Inc. - Electricity Distributor 2022-10-24 2022-10-24
EB-2021-0110 document icon HONI_JRAP_Settlement Proposal_Attachment 2_Schedule 6.0_20221024 Settlement Proposal Hydro One Networks Inc. - Electricity Distributor 2022-10-24 2022-10-24
EB-2021-0110 document icon HONI_JRAP_Settlement Proposal_Attachment 2_Schedule 6.3_20221024 Settlement Proposal Hydro One Networks Inc. - Electricity Distributor 2022-10-24 2022-10-24
EB-2021-0110 document icon HONI_JRAP_Settlement Proposal_Attachment 2_Schedule 7.3_20221024 Settlement Proposal Hydro One Networks Inc. - Electricity Distributor 2022-10-24 2022-10-24
EB-2021-0110 document icon HONI_JRAP_Settlement Proposal_Attachment 2_Schedule 6.0_20221024 Settlement Proposal Hydro One Networks Inc. - Electricity Distributor 2022-10-24 2022-10-24
EB-2021-0110 document icon HONI_JRAP_Settlement Proposal_Attachment 2_Schedule 8.2_20221024 Settlement Proposal Hydro One Networks Inc. - Electricity Distributor 2022-10-24 2022-10-24
EB-2021-0110 document icon HONI_JRAP_Settlement Proposal_Attachment 2_Schedule 5.0_20221024 Settlement Proposal Hydro One Networks Inc. - Electricity Distributor 2022-10-24 2022-10-24
EB-2021-0110 document icon HONI_JRAP_Settlement Proposal_Attachment 2_Schedule 4.4_20221024 Settlement Proposal Hydro One Networks Inc. - Electricity Distributor 2022-10-24 2022-10-24
EB-2021-0110 document icon HONI_JRAP_Settlement Proposal_Attachment 2_Schedule 4.3_20221024 Settlement Proposal Hydro One Networks Inc. - Electricity Distributor 2022-10-24 2022-10-24
EB-2021-0110 document icon HONI_JRAP_Settlement Proposal_Attachment 2_Schedule 4.2_20221024 Settlement Proposal Hydro One Networks Inc. - Electricity Distributor 2022-10-24 2022-10-24
EB-2021-0110 document icon HONI_JRAP_Settlement Proposal_Final_20221024 Settlement Proposal Hydro One Networks Inc. - Electricity Distributor 2022-10-24 2022-10-24
EB-2021-0110 document icon OEB Staff_Ltr_Settlement_Progress_HONI JRAP_20220902 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-09-02 2022-09-02
EB-2021-0110 document icon OEB ltr_Settlement Conference_Progress_2_Response_20220823_eSigned Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-08-23 2022-08-23
EB-2021-0110 document icon OEB Staff_Ltr_Settlement Conference_Progress_20220823 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-08-23 2022-08-23
EB-2021-0110 document icon OEBLtr_Settlement Conference_Progress_2_Response_20220822 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-08-22 2022-08-22
EB-2021-0110 document icon OEB Staff_Ltr_Settlement Conference_Progress_20220822 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-08-22 2022-08-22
EB-2021-0110 document icon OEBLtr_Settlement Conference_Progress_Response_20220818 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-08-18 2022-08-18
EB-2021-0110 document icon OEB Staff_Ltr_Settlement Conference_Progress Letter_ Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-08-18 2022-08-18
EB-2021-0110 document icon HONI_JRAP_Exhibit KSC1.1_20220815 Exhibits Hydro One Networks Inc. - Electricity Distributor 2022-08-15 2022-08-15
EB-2021-0110 document icon Transcript_HONI_Undertaking Discussion_20220815 Transcripts Hydro One Networks Inc. - Electricity Distributor 2022-08-15 2022-08-15
EB-2021-0110 document icon HONI_JRAP_Updated JTU 2.23_Storm Costs_20220812 Undertaking Responses Hydro One Networks Inc. - Electricity Distributor 2022-08-12 2022-08-12
EB-2021-0110 document icon HONI_s92 BATU_Response to OEB_20220808 Undertaking Responses Hydro One Networks Inc. - Electricity Distributor 2022-08-08 2022-08-08
EB-2021-0110 document icon OEB_Reply_ltr_HVAC Intrv REQ_JRAP_20220803 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-08-03 2022-08-03
EB-2021-0110 document icon HVAC_Resp_HONI IntrvOBJ_20220729 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-07-29 2022-07-29
EB-2021-0110 document icon HONI_Resp_Late Intrv REQ_HVAC_20220729 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-07-29 2022-07-29
EB-2021-0110 document icon HVAC_LateIntrvREQ_HONI_JRAP_20220725 Intervenor Request Letter Hydro One Networks Inc. - Electricity Distributor 2022-07-25 2022-07-25
EB-2021-0110 document icon HONI_JRAP_Joint Report_IRRs_20220721 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2022-07-21 2022-07-21
EB-2021-0110 document icon OEB_Reply ltr_HONI_20220714_eSigned Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-07-14 2022-07-14
EB-2021-0110 document icon HONI_JRAP_UT Update_20220711 Undertaking Responses Hydro One Networks Inc. - Electricity Distributor 2022-07-11 2022-07-11
EB-2021-0110 document icon dec_order_interim_cost awards_HONI_JRAP_20220711_eSigned Decision and Order on Cost Awards Hydro One Networks Inc. - Electricity Distributor 2022-07-11 2022-07-11
EB-2021-0110 document icon CME_IR_Joint Report_20220707 Interrogatories to Applicant Hydro One Networks Inc. - Electricity Distributor 2022-07-07 2022-07-07
EB-2021-0110 document icon OEB Staff_IR_Joint Report_20220706 Interrogatories to Applicant Hydro One Networks Inc. - Electricity Distributor 2022-07-06 2022-07-06
EB-2021-0110 document icon CCC_CostClaim_Interim_20220623 Cost Claim Hydro One Networks Inc. - Electricity Distributor 2022-06-24 2022-06-24
EB-2021-0110 document icon dec_conf_TC Undertakings_20220621_eSigned Decision Hydro One Networks Inc. - Electricity Distributor 2022-06-21 2022-06-21
EB-2021-0110 document icon HONI_LTR_Application Update_TC UTs_Confidentiality Request_20220617 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-06-17 2022-06-17
EB-2021-0110 document icon VECC_Cost Claim_Interim_20220616 Cost Claim Hydro One Networks Inc. - Electricity Distributor 2022-06-16 2022-06-16
EB-2021-0110 document icon AMPCO_Cost Claim_Interim_revised_20220623 Cost Claim Hydro One Networks Inc. - Electricity Distributor 2022-06-16 2022-06-16
EB-2021-0110 document icon CME_Cost Claim_Interim_20220616 Cost Claim Hydro One Networks Inc. - Electricity Distributor 2022-06-16 2022-06-16
EB-2021-0110 document icon SEC_Cost Claim_Interim_20220616 Cost Claim Hydro One Networks Inc. - Electricity Distributor 2022-06-16 2022-06-16
EB-2021-0110 document icon HONI_JTU-2.24_01_20220616 Undertaking Responses Hydro One Networks Inc. - Electricity Distributor 2022-06-16 2022-06-16
EB-2021-0110 document icon HONI_JTU-2.16_01_20220616 Undertaking Responses Hydro One Networks Inc. - Electricity Distributor 2022-06-16 2022-06-16
EB-2021-0110 document icon HONI_JTU-1.24_01_20220616 Undertaking Responses Hydro One Networks Inc. - Electricity Distributor 2022-06-16 2022-06-16
EB-2021-0110 document icon HONI_JRAP_UTs_20220616 Undertaking Responses Hydro One Networks Inc. - Electricity Distributor 2022-06-16 2022-06-16
EB-2021-0110 document icon P PRO_Cost Claim_Interim_20220616 Cost Claim Hydro One Networks Inc. - Electricity Distributor 2022-06-16 2022-06-16
EB-2021-0110 document icon OSEA_Cost Claim_Interim_20220616 Cost Claim Hydro One Networks Inc. - Electricity Distributor 2022-06-16 2022-06-16
EB-2021-0110 document icon ANWAA_Cost Claim_Interim_20220616 Cost Claim Hydro One Networks Inc. - Electricity Distributor 2022-06-16 2022-06-16
EB-2021-0110 document icon DRC_cost claim_Interim_20220615 Cost Claim Hydro One Networks Inc. - Electricity Distributor 2022-06-15 2022-06-15
EB-2021-0110 document icon OEB ltr_Cost Claims Extension_20220616_eSigned Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-06-16 2022-06-16
EB-2021-0110 document icon CCC_Req for Extn_Cost Claim_HONI.JRAP_20220615 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-06-15 2022-06-15
EB-2021-0110 document icon Dec_Conf_HONI_JRAP_20220614_eSigned Decision Hydro One Networks Inc. - Electricity Distributor 2022-06-14 2022-06-14
EB-2021-0110 document icon SEC_ConfSubRedacted_HONI_JRAP_20220613 Submission Hydro One Networks Inc. - Electricity Distributor 2022-06-14 2022-06-14
EB-2021-0110 document icon E_PRO_Cost Claim_Interim_20220613 Cost Claim Hydro One Networks Inc. - Electricity Distributor 2022-06-13 2022-06-13
EB-2021-0110 document icon Clearspring and PEG_JRAP_Joint Report_20220613 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-06-13 2022-06-13
EB-2021-0110 document icon OEB Ltr_Cost Awards_HONI JRAP_20220613_eSigned Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-06-13 2022-06-13
EB-2021-0110 document icon LPMA_Cost Claim_Interim_20220613 Cost Claim Hydro One Networks Inc. - Electricity Distributor 2022-06-13 2022-06-13
EB-2021-0110 document icon DRC_Letter_Tech Conference_20220601 Intervenor Evidence Hydro One Networks Inc. - Electricity Distributor 2022-06-01 2022-06-01
EB-2021-0110 document icon PO6_HONI JRAP_Interim Cost Awards_20220602_eSigned Procedural Order Hydro One Networks Inc. - Electricity Distributor 2022-06-02 2022-06-02
EB-2021-0110 document icon Transcript_HONI_JRAP_TC 2_20220601 Transcripts Hydro One Networks Inc. - Electricity Distributor 2022-06-01 2022-06-01
EB-2021-0110 document icon Exhibit 1_OEB Staff_Compendium_20220531 Exhibits Hydro One Networks Inc. - Electricity Distributor 2022-05-31 2022-05-31
EB-2021-0110 document icon Transcript_HONI_JRAP_TC 1_20220531 Transcripts Hydro One Networks Inc. - Electricity Distributor 2022-05-31 2022-05-31
EB-2021-0110 document icon Anwaatin_HydroOne_JRAP_declaration_undertaking_20220531 Declaration and Undertakings Hydro One Networks Inc. - Electricity Distributor 2022-05-31 2022-05-31
EB-2021-0110 document icon OEB Staff_Compendium_20220530 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-05-30 2022-05-30
EB-2021-0110 document icon CCC_letter_Tech Conference_20220524 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-05-24 2022-05-24
EB-2021-0110 document icon SEC_ConfSubRev_HONI_JRAP_20220524 Submission Hydro One Networks Inc. - Electricity Distributor 2022-05-25 2022-05-25
EB-2021-0110 document icon HONI_JRAP_Reply Submission_Relevance_Confidentiality_20220524 Submission Hydro One Networks Inc. - Electricity Distributor 2022-05-24 2022-05-24
EB-2021-0110 document icon AMPCO_Letter_Tech Conference_20220524 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-05-24 2022-05-24
EB-2021-0110 document icon HONI_JRAP_IRRS_LPMA-037_20220524 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2022-05-24 2022-05-24
EB-2021-0110 document icon ED_Letter_Tech Conference_20220524 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-05-24 2022-05-24
EB-2021-0110 document icon SEC_Letter_Tech_Conferecnce_20220524 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-05-24 2022-05-24
EB-2021-0110 document icon LPMA_Letter_Tech_Conferecnce_20220524 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-05-24 2022-05-24
EB-2021-0110 document icon QMA_Letter_Tech Conference_20220524 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-05-24 2022-05-24
EB-2021-0110 document icon EP_Letter_Technical Conference_20220524 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-05-24 2022-05-24
EB-2021-0110 document icon Anwaatin_Ltr_Technical Conference_20220524 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-05-24 2022-05-24
EB-2021-0110 document icon DRC_Ltr_Technical Conference_20220524 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-05-24 2022-05-24
EB-2021-0110 document icon PWU_Ltr_Technical Conference_20220524 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-05-24 2022-05-24
EB-2021-0110 document icon VECC_Topics_Tech Conference_20220524 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-05-24 2022-05-24
EB-2021-0110 document icon CME_HONI_Tech Conference_20220524 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-05-24 2022-05-24
EB-2021-0110 document icon OEB Staff_Letter_Tech Conference_20220524 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-05-24 2022-05-24
EB-2021-0110 document icon OSEA_LtrParticipation_TechnicalConference_20220524 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-05-24 2022-05-24
EB-2021-0110 document icon PollutionProbe_Ltr_TechnicalConference_20220520 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-05-20 2022-05-20
EB-2021-0110 document icon HONI_Ltr_Application Update_IRRs Confidentiality Request_20220518 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-05-18 2022-05-18
EB-2021-0110 document icon HONI_I-14-O-LPMA-034-02_20220516 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2022-05-16 2022-05-16
EB-2021-0110 document icon HONI_I-14-O-LPMA-034-01_20220516 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2022-05-16 2022-05-16
EB-2021-0110 document icon HONI_I-08-O-EnergyProbe-085-01_20220516 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2022-05-16 2022-05-16
EB-2021-0110 document icon HONI_I-08-O-EnergyProbe-083-01_20220516 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2022-05-16 2022-05-16
EB-2021-0110 document icon HONI_I-03-O-AMPCO-139-01_20220516 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2022-05-16 2022-05-16
EB-2021-0110 document icon HONI_I-03-O-AMPCO-137-01_20220516 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2022-05-16 2022-05-16
EB-2021-0110 document icon HONI_I-03-O-AMPCO-136-01_20220516 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2022-05-16 2022-05-16
EB-2021-0110 document icon HONI_I-01-O-Staff-392-01_20220516 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2022-05-16 2022-05-16
EB-2021-0110 document icon HONI_I-03-O-AMPCO-120-02_20220516 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2022-05-16 2022-05-16
EB-2021-0110 document icon HONI_I-03-O-AMPCO-120-01_20220516 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2022-05-16 2022-05-16
EB-2021-0110 document icon HONI_I-03-O-AMPCO-118-01_20220516 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2022-05-16 2022-05-16
EB-2021-0110 document icon HONI_I-01-O-Staff-397-01_20220516 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2022-05-16 2022-05-16
EB-2021-0110 document icon HONI_I-22-O-SEC-265-05_20220516 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2022-05-16 2022-05-16
EB-2021-0110 document icon HONI_I-22-O-SEC-257-02_20220516 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2022-05-16 2022-05-16
EB-2021-0110 document icon HONI_I-22-O-SEC-257-01_20220516 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2022-05-16 2022-05-16
EB-2021-0110 document icon HONI_I-22-O-SEC-252-08_20220516 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2022-05-16 2022-05-16
EB-2021-0110 document icon HONI_I-24-O-VECC-161-01_20220516 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2022-05-16 2022-05-16
EB-2021-0110 document icon HONI_I-22-O-SEC-253-01_20220516 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2022-05-16 2022-05-16
EB-2021-0110 document icon HONI_I-22-O-SEC-252-07_20220516 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2022-05-16 2022-05-16
EB-2021-0110 document icon HONI_I-22-O-SEC-252-06_20220516 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2022-05-16 2022-05-16
EB-2021-0110 document icon HONI_I-22-O-SEC-252-05_20220516 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2022-05-16 2022-05-16
EB-2021-0110 document icon HONI_I-22-O-SEC-252-02_20220516 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2022-05-16 2022-05-16
EB-2021-0110 document icon HONI_I-22-O-SEC-252-01_20220516 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2022-05-16 2022-05-16
EB-2021-0110 document icon HONI_I-22-O-SEC-252-04_20220516 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2022-05-16 2022-05-16
EB-2021-0110 document icon HONI_I-22-O-SEC-252-03_20220516 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2022-05-16 2022-05-16
EB-2021-0110 document icon HONI_JRAP_Inflation_IRR_20220516 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2022-05-16 2022-05-16
EB-2021-0110 document icon dec_HONI_Request_Withdraw Information_20220509_eSigned Decision Hydro One Networks Inc. - Electricity Distributor 2022-05-09 2022-05-09
EB-2021-0110 document icon HONI_LTR_Withdrawal of Information_20220429 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-04-29 2022-04-29
EB-2021-0110 document icon OEB_Staff_Sub_Conf_JRAP_20220509 Submission Hydro One Networks Inc. - Electricity Distributor 2022-05-09 2022-05-09
EB-2021-0110 document icon SUP_IR_Sup_HONI_20220502 Interrogatories to Applicant Hydro One Networks Inc. - Electricity Distributor 2022-05-02 2022-05-02
EB-2021-0110 document icon AMPCO_IR_HONI_20220502 Interrogatories to Applicant Hydro One Networks Inc. - Electricity Distributor 2022-05-03 2022-05-03
EB-2021-0110 document icon CME_IR_HONI_20220502 Interrogatories to Applicant Hydro One Networks Inc. - Electricity Distributor 2022-05-02 2022-05-02
EB-2021-0110 document icon VECC_IRQ2_JRAP_20220502 Interrogatories to Applicant Hydro One Networks Inc. - Electricity Distributor 2022-05-03 2022-05-03
EB-2021-0110 document icon ED_IR_HONI_20220502 Interrogatories to Applicant Hydro One Networks Inc. - Electricity Distributor 2022-05-02 2022-05-02
EB-2021-0110 document icon SEC_SupIR_HydroOne_JRAP_20220502 Interrogatories to Applicant Hydro One Networks Inc. - Electricity Distributor 2022-05-02 2022-05-02
EB-2021-0110 document icon Anwaatin_IR_HONI_20220502 Interrogatories to Applicant Hydro One Networks Inc. - Electricity Distributor 2022-05-02 2022-05-02
EB-2021-0110 document icon DRC_IR_HONI_20220502 Interrogatories to Applicant Hydro One Networks Inc. - Electricity Distributor 2022-05-02 2022-05-02
EB-2021-0110 document icon CCC_IR_HONI_20220502 Interrogatories to Applicant Hydro One Networks Inc. - Electricity Distributor 2022-05-02 2022-05-02
EB-2021-0110 document icon CME_IR_HONI_20220502 Interrogatories to Applicant Hydro One Networks Inc. - Electricity Distributor 2022-05-02 2022-05-02
EB-2021-0110 document icon  OSEA_IR_HONI_20220502 Interrogatory Response from Intervenor Hydro One Networks Inc. - Electricity Distributor 2022-05-02 2022-05-02
EB-2021-0110 document icon OEB Staff_IR HONI_20220502 Interrogatories to Applicant Hydro One Networks Inc. - Electricity Distributor 2022-05-02 2022-05-02
EB-2021-0110 document icon LPMA_IR_HONI_20220502 Interrogatories to Applicant Hydro One Networks Inc. - Electricity Distributor 2022-05-02 2022-05-02
EB-2021-0110 document icon PollutionProbe_IR_HONI_20220502 Interrogatories to Applicant Hydro One Networks Inc. - Electricity Distributor 2022-05-02 2022-05-02
EB-2021-0110 document icon Energy Probe_IR_HONI_20220502 Interrogatories to Applicant Hydro One Networks Inc. - Electricity Distributor 2022-05-02 2022-05-02
EB-2021-0110 document icon OEB ltr_Response_HONI_po 5 Letter_20220428_eSigned Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-04-28 2022-04-28
EB-2021-0110 document icon HONI_Updated_I-22-B4-SEC-161_03_20220422 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-04-22 2022-04-22
EB-2021-0110 document icon HONI_JRAP_Decision on Confidentiality Requests_20220422 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-04-22 2022-04-22
EB-2021-0110 document icon HONI_JRAP_Decision on Confidentiality Ltr_20220421 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-04-21 2022-04-21
EB-2021-0110 document icon HONI_PDT_ChangeNoticeResponse_20220421 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-04-21 2022-04-21
EB-2021-0110 document icon HONI_JRAP_PO5 Timelines Ltr_20220421 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-04-21 2022-04-21
EB-2021-0110 document icon HONI_JRAP_Clearspring Report_20220419 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-04-19 2022-04-19
EB-2021-0110 document icon PO5_dec_conf_HONI JRAP_20220414 Procedural Order Hydro One Networks Inc. - Electricity Distributor 2022-04-14 2022-04-14
EB-2021-0110 document icon PO5_dec_conf_HONI JRAP_20220414 Decision Hydro One Networks Inc. - Electricity Distributor 2022-04-14 2022-04-14
EB-2021-0110 document icon HONI_O-02-01-07_20220408 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-04-08 2022-04-08
EB-2021-0110 document icon HONI_O-02-01-05_20220408 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-04-08 2022-04-08
EB-2021-0110 document icon HONI_O-02-01-03_20220408 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-04-08 2022-04-08
EB-2021-0110 document icon HONI_O-02-01-01_20220408 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-04-08 2022-04-08
EB-2021-0110 document icon HONI_O-02-01-11_20220408 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-04-08 2022-04-08
EB-2021-0110 document icon HONI_O-02-01-10_20220408 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-04-08 2022-04-08
EB-2021-0110 document icon HONI_O-02-01-08_20220408 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-04-08 2022-04-08
EB-2021-0110 document icon HONI_O-02-01-09_20220408 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-04-08 2022-04-08
EB-2021-0110 document icon HONI_O-02-01-06_20220408 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-04-08 2022-04-08
EB-2021-0110 document icon HONI_O-02-01-04_20220408 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-04-08 2022-04-08
EB-2021-0110 document icon HONI_O-02-01-02_20220408 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-04-08 2022-04-08
EB-2021-0110 document icon HONI_JRAP_Evidence Update 2021 Actuals Report_20220408 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-04-08 2022-04-08
EB-2021-0110 document icon HONI_O-02-01-10_20220408 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-04-08 2022-04-08
EB-2021-0110 document icon HONI_O-02-01-09_20220408 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-04-08 2022-04-08
EB-2021-0110 document icon HONI_O-02-01-08_20220408 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-04-08 2022-04-08
EB-2021-0110 document icon HONI_O-02-01-11_20220408 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-04-08 2022-04-08
EB-2021-0110 document icon HONI_O-02-01-07_20220408 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-04-08 2022-04-08
EB-2021-0110 document icon HONI_O-02-01-06_20220408 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-04-08 2022-04-08
EB-2021-0110 document icon HONI_O-02-01-05_20220408 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-04-08 2022-04-08
EB-2021-0110 document icon HONI_O-02-01-03_20220408 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-04-08 2022-04-08
EB-2021-0110 document icon HONI_O-02-01-02_20220408 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-04-08 2022-04-08
EB-2021-0110 document icon HONI_O-02-01-04_20220408 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-04-08 2022-04-08
EB-2021-0110 document icon HONI_O-02-01-01_20220408 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-04-08 2022-04-08
EB-2021-0110 document icon HONI_JRAP_Evidence Update 2021 Actuals Report_20220408 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-04-08 2022-04-08
EB-2021-0110 document icon HONI_JRAP_Evidence Update 2021 Actuals Report_20220408 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-04-08 2022-04-08
EB-2021-0110 document icon HONI_JRAP_Evidence and IRR UT_Update_20220331_20220406 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-04-05 2022-04-05
EB-2021-0110 document icon SUP_Contact Name Change_20220404 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-04-04 2022-04-04
EB-2021-0110 document icon HONI_JRAP_Clearspring and PEG Expert Evidence_20220401 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-04-01 2022-04-01
EB-2021-0110 document icon HONI_O-01-02-04H_20220331 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-03-31 2022-03-31
EB-2021-0110 document icon HONI_O-01-02-04G_20220331 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-03-31 2022-03-31
EB-2021-0110 document icon HONI_O-01-02-04F_20220331 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-03-31 2022-03-31
EB-2021-0110 document icon HONI_O-01-02-04E_20220331 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-03-31 2022-03-31
EB-2021-0110 document icon HONI_O-01-02-04D_20220331 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-03-31 2022-03-31
EB-2021-0110 document icon HONI_O-01-02-04C_20220331 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-03-31 2022-03-31
EB-2021-0110 document icon HONI_O-01-02-04B_20220331 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-03-31 2022-03-31
EB-2021-0110 document icon HONI_O-01-02-04A_20220331 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-03-31 2022-03-31
EB-2021-0110 document icon HONI_O-01-02-03B_20220331 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-03-31 2022-03-31
EB-2021-0110 document icon HONI_O-01-02-03A_20220331 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-03-31 2022-03-31
EB-2021-0110 document icon HONI_Updated_I-22-B4-SEC-167-01_20220331 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-03-31 2022-03-31
EB-2021-0110 document icon HONI_Updated_I-22-B2-SEC-095-01_20220331 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-03-31 2022-03-31
EB-2021-0110 document icon HONI_Updated_I-22-C-SEC-175-01_20220331 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-03-31 2022-03-31
EB-2021-0110 document icon HONI_Updated_I-22-B2-SEC-107-01_20220331 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-03-31 2022-03-31
EB-2021-0110 document icon HONI_Updated_I-22-B2-SEC-094-01_20220331 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-03-31 2022-03-31
EB-2021-0110 document icon HONI_Updated_I-22-B2-SEC-092-01_20220331 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-03-31 2022-03-31
EB-2021-0110 document icon HONI_Updated_I-03-B2-AMPCO-030-01_20220331 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-03-31 2022-03-31
EB-2021-0110 document icon HONI_Updated_I-03-B2-AMPCO-025-01_20220331 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-03-31 2022-03-31
EB-2021-0110 document icon HONI_O-01-03-01_20220331 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-03-31 2022-03-31
EB-2021-0110 document icon HONI_O-01-02-07_20220331 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-03-31 2022-03-31
EB-2021-0110 document icon HONI_O-01-02-05J_20220331 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-03-31 2022-03-31
EB-2021-0110 document icon HONI_O-01-02-05I_20220331 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-03-31 2022-03-31
EB-2021-0110 document icon HONI_O-01-05-01_20220331 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-03-31 2022-03-31
EB-2021-0110 document icon HONI_O-01-02-09_20220331 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-03-31 2022-03-31
EB-2021-0110 document icon HONI_O-01-02-05H_20220331 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-03-31 2022-03-31
EB-2021-0110 document icon HONI_O-01-02-05G_20220331 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-03-31 2022-03-31
EB-2021-0110 document icon HONI_O-01-02-05D_20220331 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-03-31 2022-03-31
EB-2021-0110 document icon HONI_O-01-02-05C_20220331 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-03-31 2022-03-31
EB-2021-0110 document icon HONI_O-01-02-05F_20220331 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-03-31 2022-03-31
EB-2021-0110 document icon HONI_O-01-02-05E_20220331 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-03-31 2022-03-31
EB-2021-0110 document icon HONI_O-01-02-05B_20220331 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-03-31 2022-03-31
EB-2021-0110 document icon HONI_O-01-02-05A_20220331 Application and Evidence Hydro One Networks Inc. - Electricity Distributor 2022-03-31 2022-03-31
EB-2021-0110 document icon HONI_JRAP_Update to Evidence Ltr_20220322 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-03-22 2022-03-22
EB-2021-0110 document icon dec_po4_HONI_Settlement Conference_20220218_signed Procedural Order Hydro One Networks Inc. - Electricity Distributor 2022-02-18 2022-02-18
EB-2021-0110 document icon dec_po4_HONI_Settlement Conference_20220218_signed Decision Hydro One Networks Inc. - Electricity Distributor 2022-02-18 2022-02-18
EB-2021-0110 document icon HONI_JRAP_Updated UT_JT-4.27_20220215 Undertaking Responses Hydro One Networks Inc. - Electricity Distributor 2022-02-15 2022-02-15
EB-2021-0110 document icon HONI_Ltr_JRAP_EvidenceUpdate_Schedule_20220211 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-02-11 2022-02-11
EB-2021-0110 document icon OSEA_LTRSettlementConf_20220210 Settlement Proposal Hydro One Networks Inc. - Electricity Distributor 2022-02-10 2022-02-10
EB-2021-0110 document icon PollutionProbe_Ltr_EvidenceUpdate_20220210 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-02-10 2022-02-10
EB-2021-0110 document icon VECC_SUB_HONI_JRAP_Update_20220209 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-02-09 2022-02-09
EB-2021-0110 document icon AMPCO_corr_HONI_JRAP_20220209 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-02-09 2022-02-09
EB-2021-0110 document icon CME_corr_HONI_JRAP_20220208 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-02-08 2022-02-08
EB-2021-0110 document icon LPMA_Corr_HydroOne_20220208 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-02-08 2022-02-08
EB-2021-0110 document icon SEC_Corr_HydroOne_JRAP_20220208 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-02-08 2022-02-08
EB-2021-0110 document icon CCC_HONI_UpdateRequest_submissions_20220208 Submission Hydro One Networks Inc. - Electricity Distributor 2022-02-08 2022-02-08
EB-2021-0110 document icon  Energy Probe_HONI_JRAP_Application_Ltr Comment_20220208 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-02-08 2022-02-08
EB-2021-0110 document icon HONI_CvrLtr_JRAP_Request Adjournment_20220207 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-02-07 2022-02-07
EB-2021-0110 document icon [PUBLIC] HydroOne_LTR_Updated TC UTs_Confidentiality Request_20220207 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-02-07 2022-02-07
EB-2021-0110 document icon HONI_JM-1.1-02_KT1.2_20220204 Undertaking Responses Hydro One Networks Inc. - Electricity Distributor 2022-02-04 2022-02-04
EB-2021-0110 document icon HONI_JM-1.1-01_KT1.1_20220204 Undertaking Responses Hydro One Networks Inc. - Electricity Distributor 2022-02-04 2022-02-04
EB-2021-0110 document icon HONI_JRAP_Updated UTs_20220204 Undertaking Responses Hydro One Networks Inc. - Electricity Distributor 2022-02-04 2022-02-04
EB-2021-0110 document icon HONI_JRAP_Settlement_Conf_Adj_Ltr_JRAP_20220204 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-02-04 2022-02-04
EB-2021-0110 document icon REVISED_PEG_IRRs_HONI_to OEB_20220204 Interrogatory Response from Intervenor Hydro One Networks Inc. - Electricity Distributor 2022-02-04 2022-02-04
EB-2021-0110 document icon Staff_Ltr_PEG_IRRs_Revised_20220204_esign Interrogatory Response from Intervenor Hydro One Networks Inc. - Electricity Distributor 2022-02-04 2022-02-04
EB-2021-0110 document icon N Copes_Letter of Comment_20220203_Redacted Letter of Comment Hydro One Networks Inc. - Electricity Distributor 2022-02-03 2022-02-03
EB-2021-0110 document icon PEG_Exhibit N_Tab 5_Schedule 15_Attachment 1_20220202 Interrogatory Response from Intervenor Hydro One Networks Inc. - Electricity Distributor 2022-02-02 2022-02-02
EB-2021-0110 document icon PEG_Exhibit N_Tab 3_Schedule 2_Attachment 1_Berkeley Study_20220202 Interrogatory Response from Intervenor Hydro One Networks Inc. - Electricity Distributor 2022-02-02 2022-02-02
EB-2021-0110 document icon PEG_Response_DRC_20220202 Interrogatory Response from Intervenor Hydro One Networks Inc. - Electricity Distributor 2022-02-02 2022-02-02
EB-2021-0110 document icon PEG_Exhibit N_Tab 1_Schedule 13c_Attachment 1_20220202 Interrogatory Response from Intervenor Hydro One Networks Inc. - Electricity Distributor 2022-02-02 2022-02-02
EB-2021-0110 document icon Exhibit N_Tab 1_Schedule 5c_Attachment 1_20220202 Interrogatory Response from Intervenor Hydro One Networks Inc. - Electricity Distributor 2022-02-02 2022-02-02
EB-2021-0110 document icon PEG_Exhibit N_Tab 1_Schedule 1_Attachment 1_20220202 Interrogatory Response from Intervenor Hydro One Networks Inc. - Electricity Distributor 2022-02-02 2022-02-02
EB-2021-0110 document icon PEG_Exhibit N_Tab 2_Schedule 2_Attachment 1_20220202 Interrogatory Response from Intervenor Hydro One Networks Inc. - Electricity Distributor 2022-02-02 2022-02-02
EB-2021-0110 document icon PEG_IRRs_SEC_to OEB_20220202 Interrogatory Response from Intervenor Hydro One Networks Inc. - Electricity Distributor 2022-02-02 2022-02-02
EB-2021-0110 document icon PEG_IRRs_HONI_to OEB_20220202 Interrogatory Response from Intervenor Hydro One Networks Inc. - Electricity Distributor 2022-02-02 2022-02-02
EB-2021-0110 document icon PEG_IRRs_EP_to OEB_20220202 Interrogatory Response from Intervenor Hydro One Networks Inc. - Electricity Distributor 2022-02-02 2022-02-02
EB-2021-0110 document icon PEG_IRRs_CME_to OEB_20220202 Interrogatory Response from Intervenor Hydro One Networks Inc. - Electricity Distributor 2022-02-02 2022-02-02
EB-2021-0110 document icon OEB_Staff_Ltr_PEG_IRRs_20220202_final_esign_20220202 Interrogatory Response from Intervenor Hydro One Networks Inc. - Electricity Distributor 2022-02-02 2022-02-02
EB-2021-0110 document icon HONI_JRAP_Updated IR and UT_20220128 Undertaking Responses Hydro One Networks Inc. - Electricity Distributor 2022-01-28 2022-01-28
EB-2021-0110 document icon HONI_I-03-B2-AMPCO-18-01_20220128 Undertaking Responses Hydro One Networks Inc. - Electricity Distributor 2022-01-28 2022-01-28
EB-2021-0110 document icon HONI_JRAP_Seasonal_Class_Decision_20220126 Submission Hydro One Networks Inc. - Electricity Distributor 2022-01-26 2022-01-26
EB-2021-0110 document icon CME_IRs_PEG_20220125 Interrogatories to Intervenor Hydro One Networks Inc. - Electricity Distributor 2022-01-25 2022-01-25
EB-2021-0110 document icon SEC_IR_HydroOne_JRA_PEG_20220124 Interrogatories to Intervenor Hydro One Networks Inc. - Electricity Distributor 2022-01-24 2022-01-24
EB-2021-0110 document icon HONI_IR_EVD_STAFF_PEG_20220124 Interrogatories to Intervenor Hydro One Networks Inc. - Electricity Distributor 2022-01-24 2022-01-24
EB-2021-0110 document icon DRC_IR_Board Staff_PEG_Evid_20220124 Interrogatories to Intervenor Hydro One Networks Inc. - Electricity Distributor 2022-01-24 2022-01-24
EB-2021-0110 document icon Energy Probe_IRs_Board Staff- PEG Evidence_20220120 Interrogatories to Intervenor Hydro One Networks Inc. - Electricity Distributor 2022-01-20 2022-01-20
EB-2021-0110 document icon TRANSCRIPT_HONI_Motions Hearing_20220119 Transcripts Hydro One Networks Inc. - Electricity Distributor 2022-01-19 2022-01-19
EB-2021-0110 document icon OEB_Staff_Ltr_PEG_WP2_20220119 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-01-19 2022-01-19
EB-2021-0110 document icon SEC_HydroOne_MotionHearing_Compendium_20220119 Submission Hydro One Networks Inc. - Electricity Distributor 2022-01-19 2022-01-19
EB-2021-0110 document icon HONI_Letter_response_SEC motion_20220119 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-01-19 2022-01-19
EB-2021-0110 document icon OEB_ltr_Response_HONI_Ltr_20220118_signed Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-01-18 2022-01-18
EB-2021-0110 document icon SEC_Motion_HydroOne_JRA_20220117 Motion Hydro One Networks Inc. - Electricity Distributor 2022-01-17 2022-01-17
EB-2021-0110 document icon AMPCO_LTR_MOTION_20220117 Motion Hydro One Networks Inc. - Electricity Distributor 2022-01-17 2022-01-17
EB-2021-0110 document icon HONI_CvrLtr_JRAP_Motion Hearing_20220117 Motion Hydro One Networks Inc. - Electricity Distributor 2022-01-17 2022-01-17
EB-2021-0110 document icon KT 1.1 SEC_AMPCO_TechConf_TX_ARA_Data_20220117 Exhibits Hydro One Networks Inc. - Electricity Distributor 2022-01-17 2022-01-17
EB-2021-0110 document icon KT 1.2_SEC_AMPCO_TechConf_DX_ARA Data_20220117 Exhibits Hydro One Networks Inc. - Electricity Distributor 2022-01-17 2022-01-17
EB-2021-0110 document icon HONI_JT-VECC-TCQ-19_02_20220114 Undertaking Responses Hydro One Networks Inc. - Electricity Distributor 2022-01-14 2022-01-14
EB-2021-0110 document icon HONI_JT-VECC-TCQ-19_03_20220114 Undertaking Responses Hydro One Networks Inc. - Electricity Distributor 2022-01-14 2022-01-14
EB-2021-0110 document icon HONI_JT-VECC-TCQ-19_01_20220114 Undertaking Responses Hydro One Networks Inc. - Electricity Distributor 2022-01-14 2022-01-14
EB-2021-0110 document icon HONI_SUB_JRAP_UTs and CVs_20220114 Undertaking Responses Hydro One Networks Inc. - Electricity Distributor 2022-01-14 2022-01-14
EB-2021-0110 document icon HONI_JRAP_Declaration and Undertaking_20220113 Declaration and Undertakings Hydro One Networks Inc. - Electricity Distributor 2022-01-13 2022-01-13
EB-2021-0110 document icon PO3_Dec_on_Issues_List_HONI JRAP_20220113(2) Decision Hydro One Networks Inc. - Electricity Distributor 2022-01-13 2022-01-13
EB-2021-0110 document icon PO3_Dec_on_Issues_List_HONI JRAP_20220113 Procedural Order Hydro One Networks Inc. - Electricity Distributor 2022-01-13 2022-01-13
EB-2021-0110 document icon PEG Report_HON TxDx_20220112 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-01-12 2022-01-12
EB-2021-0110 document icon Rules_Form-A_Experts_Duty-mnl_20220112 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-01-12 2022-01-12
EB-2021-0110 document icon MNL_CV_20220112 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-01-12 2022-01-12
EB-2021-0110 document icon Staff_CvrLtr_PEG_Evid_20220112 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-01-12 2022-01-12
EB-2021-0110 document icon OEB_Issues List_Letter_20220110 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-01-13 2022-01-13
EB-2021-0110 document icon PUBLIC_HydroOne_LTR_TC UTs_Confidentiality Request_20220105 Correspondence Hydro One Networks Inc. - Electricity Distributor 2022-01-05 2022-01-05
EB-2021-0110 document icon HONI_TC_UndertakingResp_VECC_20220105 Undertaking Responses Hydro One Networks Inc. - Electricity Distributor 2022-01-05 2022-01-05
EB-2021-0110 document icon HONI_TC_UndertakingResp_Day5_20220105 Undertaking Responses Hydro One Networks Inc. - Electricity Distributor 2022-01-05 2022-01-05
EB-2021-0110 document icon HONI_TC_UndertakingResp_Day4_20220105 Undertaking Responses Hydro One Networks Inc. - Electricity Distributor 2022-01-05 2022-01-05
EB-2021-0110 document icon HONI_JT-VECC-TCQ-01_01_20220105 Undertaking Responses Hydro One Networks Inc. - Electricity Distributor 2022-01-05 2022-01-05
EB-2021-0110 document icon HONI_JT-5.15_01_20220105 Undertaking Responses Hydro One Networks Inc. - Electricity Distributor 2022-01-05 2022-01-05
EB-2021-0110 document icon HONI_JT-5.07_01_20220105 Undertaking Responses Hydro One Networks Inc. - Electricity Distributor 2022-01-05 2022-01-05
EB-2021-0110 document icon HONI_JT-VECC-TCQ-09_01_20220105 Undertaking Responses Hydro One Networks Inc. - Electricity Distributor 2022-01-05 2022-01-05
EB-2021-0110 document icon HONI_JT-5.18_01_20220105 Undertaking Responses Hydro One Networks Inc. - Electricity Distributor 2022-01-05 2022-01-05
EB-2021-0110 document icon HONI_JT-4.14_01_20220105 Undertaking Responses Hydro One Networks Inc. - Electricity Distributor 2022-01-05 2022-01-05
EB-2021-0110 document icon HONI_JT-2.25_01_20220105 Undertaking Responses Hydro One Networks Inc. - Electricity Distributor 2022-01-05 2022-01-05
EB-2021-0110 document icon HONI_JT-2.05_01_20220105 Undertaking Responses Hydro One Networks Inc. - Electricity Distributor 2022-01-05 2022-01-05
EB-2021-0110 document icon HONI_TC_UndertakingResp_Day3_20220105 Undertaking Responses Hydro One Networks Inc. - Electricity Distributor 2022-01-05 2022-01-05
EB-2021-0110 document icon HONI_TC_UndertakingResp_Day2_20220105 Undertaking Responses Hydro One Networks Inc. - Electricity Distributor 2022-01-05 2022-01-05
EB-2021-0110 document icon HONI_TC_UndertakingResp_Day1_20220105 Undertaking Responses Hydro One Networks Inc. - Electricity Distributor 2022-01-05 2022-01-05
EB-2021-0110 document icon Exhibit_KT5.2_Tables From PWC Report_20211217 Exhibits Hydro One Networks Inc. - Electricity Distributor 2021-12-17 2021-12-17
EB-2021-0110 document icon HONI_JRAP_TC_Corrections_20211224 Correspondence Hydro One Networks Inc. - Electricity Distributor 2021-12-24 2021-12-24
EB-2021-0110 document icon Transcript_HONI_Tech Conf_Vol 5_20211217 Transcripts Hydro One Networks Inc. - Electricity Distributor 2021-12-17 2021-12-17
EB-2021-0110 document icon KT5.1_Undertaking JT4.2_List_20211217 Undertaking Responses Hydro One Networks Inc. - Electricity Distributor 2021-12-17 2021-12-17
EB-2021-0110 document icon Transcript_HONI_Tech Conf_Vol 4_20211216 Transcripts Hydro One Networks Inc. - Electricity Distributor 2021-12-16 2021-12-16
EB-2021-0110 document icon VECC_TC_Questions_HON JRAP_20211216 Correspondence Hydro One Networks Inc. - Electricity Distributor 2021-12-16 2021-12-16
EB-2021-0110 document icon Transcript_HONI_Tech Conf_Vol 3_20211215 Transcripts Hydro One Networks Inc. - Electricity Distributor 2021-12-15 2021-12-15
EB-2021-0110 document icon HydroOne_LTR_Accenture MSA & Integrated Business Plan_20211215 Correspondence Hydro One Networks Inc. - Electricity Distributor 2021-12-15 2021-12-15
EB-2021-0110 document icon Transcript_HONI_Tech Conf_Vol 2_20211214 Transcripts Hydro One Networks Inc. - Electricity Distributor 2021-12-15 2021-12-15
EB-2021-0110 document icon Transcript_HONI_Tech Conf_Vol 1_20211213 Transcripts Hydro One Networks Inc. - Electricity Distributor 2021-12-13 2021-12-13
EB-2021-0110 document icon HONI_JRAP_IRR_Corrections_20211210 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2021-12-10 2021-12-10
EB-2021-0110 document icon dec_Interim_Conf_Dec_HONI_JRAP_20211210 Decision Hydro One Networks Inc. - Electricity Distributor 2021-12-10 2021-12-10
EB-2021-0110 document icon HONI_JRAP_TC_IR_Assignments_20211207 Correspondence Hydro One Networks Inc. - Electricity Distributor 2021-12-07 2021-12-07
EB-2021-0110 document icon AMPCO_TC Topics_HONI_JRAP_20211206 Correspondence Hydro One Networks Inc. - Electricity Distributor 2021-12-07 2021-12-07
EB-2021-0110 document icon CCC_TechConf_Topics_20211207 Correspondence Hydro One Networks Inc. - Electricity Distributor 2021-12-07 2021-12-07
EB-2021-0110 document icon VECC_TCTime_JRAP_20211206 Correspondence Hydro One Networks Inc. - Electricity Distributor 2021-12-07 2021-12-07
EB-2021-0110 document icon LPMA_TC_20211206 Correspondence Hydro One Networks Inc. - Electricity Distributor 2021-12-06 2021-12-06
EB-2021-0110 document icon SUP_tech Cfr_20211207 Correspondence Hydro One Networks Inc. - Electricity Distributor 2021-12-06 2021-12-06
EB-2021-0110 document icon PWU_Ltr_Tech Conference_20211206 Correspondence Hydro One Networks Inc. - Electricity Distributor 2021-12-06 2021-12-06
EB-2021-0110 document icon OSEA_TechnicalConference_20211203_20211206 Correspondence Hydro One Networks Inc. - Electricity Distributor 2021-12-06 2021-12-06
EB-2021-0110 document icon PollutionProbe_TechnicalConference_20211206 Correspondence Hydro One Networks Inc. - Electricity Distributor 2021-12-06 2021-12-06
EB-2021-0110 document icon OEB Staff_Ltr_Topics JRAP Tech Conference_20211206 Correspondence Hydro One Networks Inc. - Electricity Distributor 2021-12-06 2021-12-06
EB-2021-0110 document icon ED_Ltr_TC_20211206 Correspondence Hydro One Networks Inc. - Electricity Distributor 2021-12-06 2021-12-06
EB-2021-0110 document icon DRC_LTR_Tech Conf_Subject Areas_20211206 Correspondence Hydro One Networks Inc. - Electricity Distributor 2021-12-06 2021-12-06
EB-2021-0110 document icon Anwaatin_LTR_Tech Conf_Subject Areas_20211206 Correspondence Hydro One Networks Inc. - Electricity Distributor 2021-12-06 2021-12-06
EB-2021-0110 document icon CME_Ltr_Tech_Conference_20211206 Correspondence Hydro One Networks Inc. - Electricity Distributor 2021-12-06 2021-12-06
EB-2021-0110 document icon SEC_TC_HydroOne_JRA_20211206 Correspondence Hydro One Networks Inc. - Electricity Distributor 2021-12-06 2021-12-06
EB-2021-0110 document icon Energy Probe_Technical Conference_20211206 Correspondence Hydro One Networks Inc. - Electricity Distributor 2021-12-06 2021-12-06
EB-2021-0110 document icon HONI_I-24-D-VECC-057-01_20211203 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2021-12-03 2021-12-03
EB-2021-0110 document icon OSEA_TechnicalConference_20211203 Submission Hydro One Networks Inc. - Electricity Distributor 2021-12-03 2021-12-03
EB-2021-0110 document icon HONI_22_SEC_pt3_IRR_20211203 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2021-12-02 2021-12-02
EB-2021-0110 document icon OEB Ltr_BPL Response_HONI_JRAP_20211202 Correspondence Hydro One Networks Inc. - Electricity Distributor 2021-12-02 2021-12-02
EB-2021-0110 document icon HONI_LTR_IRR_Confidentiality Request_20211130 Correspondence Hydro One Networks Inc. - Electricity Distributor 2021-11-30 2021-11-30
EB-2021-0110 document icon HONI_I-22-B4-SEC-169-01_20211129 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2021-11-29 2021-11-29
EB-2021-0110 document icon HONI_I-22-B4-SEC-167-01_20211129 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2021-11-29 2021-11-29
EB-2021-0110 document icon HONI_I-22-B3-SEC-144-03_20211129 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2021-11-29 2021-11-29
EB-2021-0110 document icon HONI_I-22-B3-SEC-144-01_20211129 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2021-11-29 2021-11-29
EB-2021-0110 document icon HONI_I-22-B3-SEC-139-01_20211129 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2021-11-29 2021-11-29
EB-2021-0110 document icon HONI_I-22-B4-SEC-169-03_20211129 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2021-11-29 2021-11-29
EB-2021-0110 document icon HONI_I-22-B4-SEC-169-02_20211129 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2021-11-29 2021-11-29
EB-2021-0110 document icon HONI_I-22-B3-SEC-144-02_20211129 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2021-11-29 2021-11-29
EB-2021-0110 document icon HONI_I-22-B3-SEC-141-01_20211129 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2021-11-29 2021-11-29
EB-2021-0110 document icon HONI_I-22-B3-SEC-128-03_20211129 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2021-11-29 2021-11-29
EB-2021-0110 document icon HONI_I-22-B3-SEC-128-02_20211129 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2021-11-29 2021-11-29
EB-2021-0110 document icon HONI_I-22-B3-SEC-124-03_20211129 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2021-11-29 2021-11-29
EB-2021-0110 document icon HONI_I-22-B3-SEC-124-02_20211129 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2021-11-29 2021-11-29
EB-2021-0110 document icon HONI_I-22-B3-SEC-124-01_20211129 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2021-11-29 2021-11-29
EB-2021-0110 document icon HONI_I-22-B3-SEC-128-01_20211129 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2021-11-29 2021-11-29
EB-2021-0110 document icon HONI_I-22-B2-SEC-107-01_20211129 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2021-11-29 2021-11-29
EB-2021-0110 document icon HONI_I-22-B2-SEC-092-01_20211129 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2021-11-29 2021-11-29
EB-2021-0110 document icon HONI_I-22-B2-SEC-075-01_20211129 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2021-11-29 2021-11-29
EB-2021-0110 document icon HONI_I-22-A-SEC-002-07_20211129 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2021-11-29 2021-11-29
EB-2021-0110 document icon HONI_I-22-B2-SEC-097-01_20211129 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2021-11-29 2021-11-29
EB-2021-0110 document icon HONI_I-22-B2-SEC-096-01_20211129 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2021-11-29 2021-11-29
EB-2021-0110 document icon HONI_I-22-B2-SEC-095-01_20211129 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2021-11-29 2021-11-29
EB-2021-0110 document icon HONI_I-22-B2-SEC-094-01_20211129 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2021-11-29 2021-11-29
EB-2021-0110 document icon HONI_I-22-A-SEC-002-09_20211129 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2021-11-29 2021-11-29
EB-2021-0110 document icon HONI_I-22-A-SEC-002-08_20211129 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2021-11-29 2021-11-29
EB-2021-0110 document icon HONI_22_SEC_pt3_IRR_20211129 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2021-11-29 2021-11-29
EB-2021-0110 document icon HONI_22_SEC_pt4_IRR_20211129 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2021-11-29 2021-11-29
EB-2021-0110 document icon HONI_22_SEC_pt2_IRR_20211129 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2021-11-29 2021-11-29
EB-2021-0110 document icon HONI_22_SEC_pt1_IRR_20211129 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2021-11-29 2021-11-29
EB-2021-0110 document icon HONI_I-14-C-LPMA-013-03_20211129 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2021-11-29 2021-11-29
EB-2021-0110 document icon HONI_I-08-E-Energy Probe-068-01_20211129 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2021-11-29 2021-11-29
EB-2021-0110 document icon HONI_I-14-D-LPMA-015-01_20211129 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2021-11-29 2021-11-29
EB-2021-0110 document icon HONI_I-14-C-LPMA-013-02_20211129 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2021-11-29 2021-11-29
EB-2021-0110 document icon HONI_I-14-C-LPMA-013-01_20211129 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2021-11-29 2021-11-29
EB-2021-0110 document icon HONI_I-09-L-ED-026-01_20211129 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2021-11-29 2021-11-29
EB-2021-0110 document icon HONI_I-09-B2-ED-008-03_20211129 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2021-11-29 2021-11-29
EB-2021-0110 document icon HONI_I-08-E-Energy Probe-059-01_20211129 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Distributor 2021-11-29 2021-11-29
Case Number File Name Document Type Applicant Issued By OEB Received By OEB Date Issued/Received